ONEMOjetc.
<br /> BONDEDTA81.111:WOOD DECKS—NEW CONSTRUCTION OR REROOF(T�AR-OFF)
<br /> SYSTEMTYPEA-2:MECHANICALLY ATTACHED ANCHOR SHEET,
<br /> Anchor Sheet Base Insulation ' Tap Insulation Roof Cover(Note15)
<br /> .system Dec _ .,
<br /> Fasteners Attach Attach MDP
<br /> No: fnaeti Type- tach Base
<br /> At
<br /> INotev)„ VTYPe (NptK Type. Motes Ply Ply Cap Fly (PSfi
<br /> MIn.0.5-inch
<br /> Min.19/32- GAFGLAS 080 Ultima Base 9-inch o.c.at the Min.1-Inch EnergyGuard Structodek High
<br /> Sheet, 32 ga.,1- oenslly Fibehoard Inch Eliminator
<br /> GAFGLllable Venting
<br /> min.4-inch lap Potyiso Insulation, (O tlonal)
<br /> 5/8-inch dia. Roof Insulation or p
<br /> plywood or Eliminator Nallable Venting and 12-Inch o.c. EnergyGuard Ultra Polylw BP-AA, SBS-AA,
<br /> tinrapswith Hot Energy6uard Pergm Hot BP-AA,
<br /> W-5. 1-inch ease Sheet,Ruberoid 20 in two,equally Insulation or EnergyGuard 58S-AA, SBS-TA, -45.0
<br /> woad Smooth,Ruberoid Mo 11 ga. asphalt Recover Boarder asphalt SBS-AA
<br /> p annularring spaced, RH Polyiw or min.l.5- MIn.0.75-Inch SBSTA, APP-TA
<br /> plank;2 It Smooth,Ruberoid Mop staggered center inch EnargyGuard RA or Ene rd Perlrte APP-TA
<br /> span Smooth 1.5 shank nails rows EnergyGumd RN R-fins.lation
<br /> (homogeneous)
<br /> Min.19/32- GAFGLAS 480 Ultima Base 32 ga f-., 9-Inch o.c.at the Min.1-inch EnergyGuard
<br /> inch Shee4 GAFGlA55tatavent min.4--inch lap Potyiso BP-AA,Insulation, MIn.0.25-Inch (Optional)
<br /> dia.
<br /> plywood or Eliminator Nallable Venting and 12-Inch o.c. EnergyGuard Ultra Potyiso DensDeck Prime BP-AA, SBS-AA,
<br /> tincaps with Hot Hot 505-AA,
<br /> W-6. 1-inch Base Sheet,Ruberoid 20 In two,equally Insulation or EnergyGuard or SENROCK SBS-AA, SBS-TA, -45.0
<br /> 11 ga. asphalt asphalt SBS-TA,
<br /> wood Smooth,Ruberoid Mop spaced, RH PaIy¢o or min.l.s- Gypsum-Fiber S85-TA, APP-TA
<br /> plank;2R Smooth,Ruberold Mop annularring staggered center inch EnergyGuard RA or Roof Board APP-TA APP-TA
<br /> span Smooth 1.5 shanknaits rows Ener
<br /> gyGuard RN
<br /> Mr.0S,nch
<br /> Min.15/32- 32 ga.,I- Min.1-Inch EnergyGuard Shuctodek High
<br /> Inch GAFGLAS Base
<br /> Base Sheet, 5/8-Inch 6-inch o.c.at the Potyiso Insulation, Density Flberboad
<br /> TrFPty 475 Base Sheet, Roof Insulation or (Optional)
<br /> plywood Or diametertin 4-inch lap and 6- EnergyGuard Ultra Polylso BP-AA, SBS-AA,
<br /> W-7. 1-Inch GAFGLAS 480 Ultima Base Hat EnergyGuard Perlrte Hat BP-AA,
<br /> Sheet,GAFGLAS Statavent ups with 12 Inch o.c in two Insulation or EnergyGuard SBS-AA, SBS-TA, -525
<br /> asphalt Recover Board or asphalt SBS-AA
<br /> wood ga.annular staggered center RH Potyiso or min.1.5- SBS-TA, APP-TA
<br /> plank;2ft Nallable Venting Base ringshank rows Inch EnergyGuard RA or EnlergyGuard Perlrte APP-TA
<br /> span Sheet,Ruberoid 20 smooth nails EnergyGuard RN Roof msulaul-
<br /> (homogeneous)
<br /> Min.15/32- 32 ga.,1- Min.1-Inch EnergyGuard
<br /> GAFGLAS 975 Base Sheet,
<br /> inch 5/8-inch 6-incho.c.atthe Potyiwlnsulatlon, MIn.0.25-Inch (Option
<br /> TN-PIy U75 Base Sheet, BP.AA
<br /> plywood or diametertin 4-inch lap and 6- EnergyGuard Ultra Polylso DensDeck Prime BP-AA, SBS-AA,
<br /> GAFGLAS G 880 Ultima Base Hot Hot 505-AA,
<br /> W-6. 1-Inch ups with 12 inch o.c in two Insulation or EnergyGuard or SECUROCK SBS-AA, S05-TA, -525
<br /> woad Sheet,GAFGLAS Statavent asphalt Gypsumasphalt SBS-TA,
<br /> Nallable Venting Base ga.annular staggered center RH PEnergolyiso Guard RA
<br /> Roof Board gpPTA S05-TA, APP-TA
<br /> plank 2ft Sheet,Ruberoid 20 Smooth ring shank rows Inch EnergyGuardRA or Root Board qPP-TA
<br /> span nails EnergyGuard RN
<br /> NEMO ETC,LLC Evaluation Report 01505.11.04-R29 for FL5630-1129
<br /> s Certificate of Authorization 1132455 TR EDITION(2020)FDC NON-HVHZ EVALUATION Revision 29:10/11/2020
<br /> 02019 NEMO ETC,LLC GAF Modified Bitumen Roof Systems;(800)766-3411 Appendix 1,Page 7 of 91
<br /> ONEMO etc.
<br /> TABLE I B:WOOD DECKS—NEW CONSTRUCTION on REROOF(TEAR-OFF)
<br /> SYSTENITYPEA-2:MECHANICALLY ATTACHED ANCHOR SHEET,BONDED INSULATION,BONDED ROOF COVER
<br /> - ARM Sheet Base lnwlaNan Top Insulation Roof Cover(Not.1S)
<br /> System Deck - .Attach Attach MDP,
<br /> No. (nmel) Type Fasteners Atlatis Type`. (Note _ TYPE ttac B ty PIY Cap Pty IPstl
<br /> (Nate 11) 6,),S) 6,7,e) p
<br /> Min.US-inch
<br /> Min.19/32- 32 ga.,1- Min.1-inch EnergyGuard Structodek High
<br /> GAFGLAS 475 Base Sheet, Density Fbeftend
<br /> Inch 5/8-inch 8-mcn o.c.at the Potyisa Insulation, (Optional)
<br /> Td-Ply 075 Base Sheet, Reef Insulation or
<br /> plywood or diametertin 4-Inch lap and 8- EnergyGuard Ultra Potyiso BP-AA, SBS-AA,
<br /> W-9. 1-Inch SheeGAFGLAS GAFGLAS
<br /> Ultima Base Hot EnergyGeard Perlrte Hot BP-AA,
<br /> caps with 12 inch o.c.in two Insulation or Ena.1.5-rd SBS-AA, SBS-TA, -52.5
<br /> Woad Sheet,e Venting
<br /> Stratavent asphalt Recover Board or asphalt SBS-AA
<br /> Nailahle Venting Base ga.annular staggered center RH Potyiso or min.l.5- Min.0.75-mch Sg5-TA, APP-TA
<br /> plank;2ft ring shank rows inch EnergyGuard RA or EnergyGuard Peshte APP-TA
<br /> span Sheet,Ruberoid 20 Smooth nails Ener
<br /> gyGuard RN goeflmulation
<br /> (homogeneous)
<br /> Min.19/32- 32 ga.,1- Min.1-inch EnergyGuard
<br /> GAFGLAS Base Sheet, / tyi (Optional)
<br /> inch 5/8-inch 8-Inch o.c.at the Po so Insulation, Min.0.254nch
<br /> Tri-Pty R75 Base Sheet, BP-AA,
<br /> plywood or diametertin 4-inch lap and 8- EnergyGuard Ultra Polylso DensDeck Pdme BP-AA, SBS-AA,
<br /> SheetGAFG AS#90 GAFGLAS
<br /> Sma Base Hot Hot SBS-AA,
<br /> W-30. 1--inch ups with 12 inch o.c.in two Insulation or EnergyGuard or SENROCK SBS-AA, 585-TA, -525
<br /> wood Wlfat a Venting
<br /> Statavent asphalt asphalt SBS-TA,
<br /> ga.annular staggered center RH Potyiso or min.1.5- Gypsum-Fiber S85-TA APP-TA
<br /> plank;2ft Nailable Venting Base ring shank rows inch EnergyGuard RA or Roof Board App-TA APP-TA
<br /> span Sheet,Ruberoid 20 Smooth nails EnergyGuard RN
<br /> Min.0.5-mc1,
<br /> Min.19/32- GAFGLAS 480 Ultima Base 9-inch o.c.at the Min.1-Inch EnergyGuard Stru &kHigh
<br /> 32 ga.,1- Density Fiberboard
<br /> Inch Sheet,GAFGlAS Stratavent min.4lnch lap Potyiso Insulation, (Optional)
<br /> 5/8-Indh dia. Roof Insulation or
<br /> plywood or EliminatorNallable Venting and9 qualo.c.In Insulation or Ultra Potyiso BP-AA, SBS-AA,
<br /> tin ups with Hot Ret-Guoa Perlrte Hoc BP-M,
<br /> W-11. 1-Inch Base Sheet,Ruberoid 20 two,equally Insulation or EnergyGuard SBS'AA, SBS-TA, -60.0
<br /> 11 ga. asphalt Recover Board or asphalt SBS-AA
<br /> woad smooth,Ruberoid Mop spaced, RH Potyiso or min.1.5- Min.0.75-inch SBS-TA, APP-TA
<br /> plank;2ft Smooth,Rubaraid Mop annular ring staggered center Inch EnergyGuard RA or EnergyGuard Perlrte APP-TA
<br /> span Smooth 1.5 shank nails rows EnergyGuard RN Rooflnsulavon
<br /> (homogeneous)
<br /> Min.19/32- GAFGLAS 1180 Ultima Base 9-Inch o.c.at the Min.1-Inch EnergyGtni d
<br /> 32 ga.,1- y (Optional)Inch Sheet,GAFGLAS Statavent min.4-Inch lap Pal lso Insulation, Min.0.25-inch
<br /> S/8-Inch dia. BP-AA,plywood or Eliminator Nallable Venting and 9-inch o.c in ImulatGuard Ultra Potyisa DensDeck Pdme BP-AA, SBS-AA,
<br /> I, caps with equally Hot Hot SBS-AA,
<br /> W-12. 1-Inch Base Sheet,Ruberoid 20 two, II lnsulatlon or EnergyGuard or SENROCK SBSAA, SBS-7A,
<br /> 11 ga. asphalt asphalt SBS•TA,
<br /> woad Smooth,Ruberoid Mop spaced, RH Potyiso or min,1.5- Gypsum-Fiber SBS-TA, APP-TA
<br /> plank;2ft Smooth,Ruberoid Mop annular dog staggered center Inch EnergyGuard RA or Roof Board APP TA APP-TA
<br /> span Smooth 1.5 shank nails rows Ener
<br /> gyGuard RN
<br /> SFIf-AlxfBUNa BASE pI�: - -
<br /> NEMO ETC,LLC Evaluation Report 01506.11.04-1129 for FL56MR29
<br /> Certificate of Authorization 4324SS 7-EDITION(21320)FBC NON.HVHZ EVALUATION Revision 29:20/11/2020
<br /> 02019 NEMO ETC,LLC GAF Modified Bitumen Roof Systems;(800)766.3421 Appendix 1,Page 8 of 91
<br />
|