CaptiveAire Systems,Inc.
<br /> NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br /> 1. Evidence submitted under previous NOA's
<br /> A. DRAWINGS "Submitted under NOA #16-0407.02"
<br /> 1. Drawing No.NOA2, titled"Steel Utility Set Exhaust and A Series Steel Supply Fans", sheets
<br /> 1 through 16 of 16, dated 08/25/2008, with revision 4 dated 10/14/2013, prepared by
<br /> CaptiveAire Systems,Inc.,signed and sealed by L.David Rice,P.E. on 03/22/2016.
<br /> B. TESTS "Submitted under NOA #14-0317.04"
<br /> 1. Test reports on 1)Uniform Static Air Pressure Test,Loading per FBC TAS 202-94
<br /> 2)Large Missile Impact Test per FBC,TAS 201-94
<br /> 3)Cyclic Wind Pressure Loading per FBC,TAS 203-94
<br /> along with marked-up drawings and installation diagram of Series/Model USBI 1land USBI
<br /> 36 roof mounted exhaust fans, prepared by Architectural Testing, Inc., Test Report No.
<br /> D2865.01-109-18, dated 12/12/2013,signed and sealed by Michael D. Stremmel,P.E.
<br /> "Submitted under NOA No. 12-0 724.02"
<br /> 2. Test reports on 1)Uniform Static Air Pressure Test,Loading per FBC TAS 202-94
<br /> 2)Large Missile Impact Test per FBC,TAS 201-94
<br /> 3)Cyclic Wind Pressure Loading per FBC,TAS 203-94
<br /> along with marked-up drawings and installation diagram of Series/Model CASRE roof
<br /> mounted exhaust fan, prepared by Architectural Testing,Inc., Test Report No.B9460.01-109-
<br /> 18, dated 05/31/2012,signed and sealed by Michael D. Stremmel,P.E.
<br /> "Submitted under NOA No. 08-1124.08"
<br /> 3. Test reports on 1)Uniform Static Air Pressure Test,Loading per FBC TAS 202-94
<br /> 2)Large Missile Impact Test per FBC,TAS 201-94
<br /> 3)Cyclic Wind Pressure Loading per FBC,TAS 203-94
<br /> along with marked-up drawings and installation diagram of Series/Model TIRE-24, high
<br /> velocity roof fan, BI-36CARM, roof mounted exhaust fan and A5-925, modular down
<br /> discharge blower, prepared by Architectural Testing, Inc., Test Report No. 83748.01-109-18,
<br /> dated 10/07/2008, with Revision 1 dated 01/06/2009, signed and sealed by Michael D.
<br /> Stremmel,P.E.
<br /> C. CALCULATIONS "Submitted under NOA #14-0317.04"
<br /> 1. Anchor verification calculations prepared by Rice Engineering, dated 02/21/2014, signed and
<br /> sealed by L.David Rice,P.E.
<br /> "Submitted under NOA No. 12-0724.02"
<br /> 2. Anchor verification calculations prepared by Rice Engineering, dated 07/05/2012, signed and
<br /> sealed by L.David Rice,P.E.
<br /> "Submitted under NOA No. 08-1124.08"
<br /> 3. Anchor verification calculations, prepared by Rice Engineering, dated 1 12/2008, with
<br /> revision dated 01/20/2008,signed and sealed by L.David Rice,P.E.
<br /> �6�150�6111
<br /> Carlos M.Utrera,P.E.
<br /> Product Control Examiner
<br /> NOA No.19-0717.09
<br /> Expiration Date:March 4,2024
<br /> Approval Date:August 15,2019 .
<br /> E-1