Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> Y <br /> applicable deed.restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR 'RESPONSIBILITIES: If the owner has hired'a contractor i or <br /> contractors-to-undertake-work, they may be required to be licensed in accordance with.st@tq>--a.nd local-.regulations.,r if the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br /> under state law. If the owner or-intended contractor are uncertain-as to what licensing,:requirements..may_cipply-,for.i,he <br /> intended work, they are advised to contact the Pasco County.Building Inspection Division—Licensing Section at 727-847- <br /> 8009. - Furthermore., -if the.owner has,-hired'a,contractor. or contractors, he is advised,-to have the contractor(s) sign <br /> portions of the"contractor-Block" of this application--for which they will.be responsible. �If.,you, as the owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County, <br /> TRANSPORTATION6.IMP-ACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fees may apply-to the construction.of-new buildings, change of <br /> use in existing buildings, or expansion of existing buildings, as sp,pcified in Pasco County Ordinance number 9-07 and <br /> 90-07, as amended. The,.,iind6rsigiied..a,iso.underptands,-that sti6h fees, as-may be-due, will-be identified at the time of <br /> permitting. It is further understood that Transportation-Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a "Certificate of occupancy" or final power release.. If the-,projiact does not'involve a certificate of occupancy or <br /> final.power.release; the fees:must be paid.prior to permit issuance. 'Furthermore, if-Pasco County Water/Sewer Impact <br /> fees are.due;Ahey-must.be paid,prior to permit issuance in accordance with applicable Pasco County ordinances. - <br /> CONSTRUCTION.LIEN LAW(Chapter 713, Florida Statutes,as.iamended): If valuation of work is$2,600.011 or­mo e, I <br /> certify that 1, the applicant,-have been provided with a copy OU the "Florida Construction,Lien Law—Homeowner s <br /> Protection,-Guidq7 prepared by the Florida Department of Agriculture and Consumer Affairs. .4 the applicant.,is someone <br /> other than the"owner", I certify that-I have obtained a copy bf-the above described document and.promise in.good faith to': <br /> deliver it to the"owner"prior to.commencement,. <br /> CONTR,ACTOR!S/O.WNER!.S:,AFFIDAVIT:. I certify-that al[the information in this.applicationi,is.accurate and that all work <br /> will be done in compliance with all applicable laws regulating construction', zoning and land-development. Applicatid I n is <br /> hereby made to obtain a permit to do work- and installation as indicated. I certify that no work or installation has <br /> commenced-prior-to,Issuance pf a.,permit and.that all work will be performed to meet standards of all laws regulating <br /> construction, County-and City�.,codes,-`z,oning regulations, and land' development regulations in the jurisdiction'.. 1.:also <br /> certify that I understand that the regulations of other government agencies may-apply to-the intended work, and that lit is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include-but are-not limited to; <br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and-Environmentally Sensitive <br /> Lands,WaterMastewatet.Tteeitm.ent: !­i­ <br /> Southwest Florida Water Management District-Wells, Cypress -Bayheads,' Wetland Areas, Altering <br /> Watercourses. <br /> Army Corps of Engineers-Seawalls,' Docks, Navigable" <br /> Waterways, <br /> Department of Health & R6hab.fliiative Sei;vic6i1EhV'1t6hmentaI Health"'Unit Wells, Wastewater.:Treatment, . <br /> Sqpjlg Tanks. <br /> VS-'Environmental,Protection:A§dndy=A$b6st6srobat6ment.- <br /> Federal Aviation Authorfty-RUnways. <br /> I understand-that:the,following restrictions apply to.theuse 6f-fill: <br /> Use Of.fill-1s not allowed in Flood Zone,V"unless,expressly permitted. <br /> If the-fill material is to be used in Flood Zone "A", it is understood that a drainage plan-addressing a <br /> acom0ensating-,.volume''' e-will b submitted at time of,permiffing,which-is prepared.,by.a..professional engineer <br /> licensed by the State Of Florida. <br /> If the fill-material is to..be used 4n.Flood Zone "A in connection with a permitted building using stem[wall <br /> construction,,I certify that fill will be-used only to fill the area within the stem wall.. <br /> If fill material is to be used .in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties. -If use.'Of.fill.is found to..adversely affect adjacent-properties,the owner may be cited-for violating <br /> y I <br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br /> acre which'are tiev6te'd.2,by'fill;'ran-I,6ngih"eered draiha6e,,plan-is required. <br /> If I am'.-the,-AGEN*,-"-Fdk::'T-HE,OWNER, I promise,in.good-f6ith,,to.;inform.-the-owner of-the permitting-conditions set fohKin <br /> this�,�affidavit:prior-.to,,.commencing construction. I understand.that a separate permit may be required for electrical work, <br /> plurftbihj,, signs.' wdIls-, 'air-conditioning -gas-,"or;."or.other installations-.n6t-,specific;al!y,included in the-applicatidin. A <br /> permit.issued-shall.,be-Qons.trued.-to be p license to proceed�.,withjthe work and not as autho—rity-joy'lolate, cancel, after, or <br /> set aside any pr6vWo'*hs_6f the46chhical bodet,,.non shall issuance-of a permit prevent the Building"Official from thereafter <br /> requiring a correbtfioinof--'errors in,"plans,construction or violations of-any codes. Every permit issued sh'allr become invalid <br /> unless the work authorized by­sqdh.,.0pr-mit is commenced Within six months of permit issuance, or if work authorize'd,by <br /> the:permit is suspended or abandoned for a period-of-six(6)months after-the,time'the-work is commenced. An extension <br /> may-be-requested, in writing, from the Building Official for a--.period not to exceed ninety(90) days and will demonstrate <br /> justifiable,cause for the extension. If,Work ceases for ninety(90)consecutive days,the job is considered abandoned. <br /> 1 <br /> WARNING--TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT.MAY RESULT IN-.'TOUR <br /> PAYINi3T*W'IdEF'OFt'IMPROVEMENTSTO�Y,OUR,PROPERTY. IF YOU rINTEN'D.TO.OB.TAIN FINANCING,:CONSULT <br /> WITHXQUR LENDER QR,*AN ATTORNEY BEFOREJRECORDING YOUR-NOTICE-OF COMMENCEMENT. <br /> FLORIDA JURAT(F.S.117 e7 <br /> OWNER OR AGENT CONTRACTOR <br /> pz' <br /> 1�*p(gr=Md)bef Subscribed and-sw subscribed and sworn to(or-affirmed),before.me this <br /> by zc�l by <br /> islare personally knownJq,,Ti or has/have produced" Who is/are personally known to me.or has/have-produced <br /> ---------------- as identift Eon. as identification. <br /> otary Public Notary'Public <br /> Commission Nr RR FNDAM.MCCLELLAN Commission No. <br /> P <br /> WCOMMISSION <br /> #GG 286216 <br /> EXIRM ItA11119Y",901% <br /> Name of Note Me P Name of Notary typed,-printed or stamped <br /> *". <br />