Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. It! accordance with the Land Development Code, lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-. R403.5.3Hot,water pipe insulation <br /> Insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping�1.inch (1.9-1 mm)and larger-in.nominal diameter. <br /> Piping.serving more than:one dwelling unit. <br /> Piping located.outside the conditioned'space., <br /> Piping from the water heater to a distribution manifold: <br /> Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation'systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A copy of the enemy earls shall be with permit at all times. <br /> 27. Copu of rival'insulation report-shall be provided with Permit before final <br /> 28. No fence,-pool or screen enclosure :is issued with lhispermit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />