Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 ofthe 2016 N:.E:C <br /> -24. In accordance with the Land Development Code,lots shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.pipe insulation <br /> Insulation for liot:water. pipe with a mihimufri thermal resistance (R-value) of R-3 shall be applied to the=following:. <br /> Piping V. inch (19:1-mm)and larger-in:nominal diameter. <br /> Piping,serving more than-one dwelling'unit: <br /> Piping located.outside'the conditioned space... <br /> Piping from the:water heaterto:a distribution manifold:. .. <br /> Piping:located under.a floor slab: <br /> Buried in i in <br /> RIRi .g•: .: <br /> 'Supply and return piping in recirculation systemsother than demandrecirculation systems. <br /> 25: Blower door test shall be provided before C.O. <br /> 26.A_copy of the enemy.caels shall be with yermit at all times <br /> 27. Cope of final insulation report shall be provided with permit before final <br /> 28w No fence, pool or enclosure :is issued iwith:this permit <br /> F.F.E.-,Finished Floor Elevation <br /> F.B.C-'Florida Building Code 6th Edition <br /> R.O.W.-Right of Way. <br /> A.D.A.=.Americans with_Disabilities Act : N.E.C.-National Electric.Code(2016) <br />