Laserfiche WebLink
} <br /> 21 Tamper- Resistant.Receptacles in accordance.with 406.11 of the 2016 N.E:C . <br /> 24. In accordance with the Land Development Code, lots.shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25.. R403.5.3Hot Water'pipe insulation. <br /> Insulation for hot water pipe With.'a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping•/: inch (19:1 mm)and larger in:nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space... <br /> Piping from the:water heater to a:distribution manifold... <br /> Piping,located under a floor slab. <br /> Buried in piping. <br /> Supply and'return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower.door'test shall be provided.before' C.O. <br /> 26.A copy ofthe energy cacls�shall be:with permit at all,dines <br /> 27. Copv of rnal insulation report shall be provided with permit before fnat; <br /> 28 No fence,pool onscreen enclosure :is issued with:this-permit.` <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.-O.W.-Right of Way. <br /> A.D.A.-:Americans with Disabilities Act: N.E.C.-National Electric-Code (2016) <br />