Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> .24. In accordance with the Land Development Code,lots shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25-. R403.5.3Hot water.pipe insulation. <br /> Insulation for hot water pipe with'a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping:3/< inch (19.1 mm)and largerin.nominal diameter.. <br /> .. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space:- <br /> Piping from the:water heater to.a distribution manifold:- <br /> Piping located under a floor slab. <br /> Buried in piping.: <br /> Supply and:return piping in.recirculation rsystems other than demand recirculation systems. <br /> 25.Blower door test shall be provided-before' C.O: <br /> 26.A cony of energy cacls shall be with permit at all times. <br /> 27.. Cony of final insulation report shall-be provided with permit before final <br /> 28.No fence, Pool or screen enclosure :is issued with this Permit.' <br /> F.F.E.-Finished Floor Elevation <br /> F.B.0 Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) - <br />