Laserfiche WebLink
23, Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R.value) of R-3 shall be applied to the <br /> following: <br /> Piping V4 inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold: <br /> .Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation_ systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26..A copy of the energy cacls shall be with permit at all times <br /> -27 Copu of Thal insulation report shall be provided with permit before final <br /> 28.No fence, pool or screen enclosure is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.0 Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric.Code (2016) <br />