Laserfiche WebLink
� - <br /> 21 Tamper- Resistant-Receptacles in accordance with 406.11 of the.2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-. R403.5.3Hot water pipe insulation. <br /> Insulation for hot water pipe with a minimum thermal resistance (R.value) of R-3 shall.be applied to the <br /> following: <br /> Piping 3/; inch (1.9.1,mm)and larger,in.:nominal diameter.. <br /> Piping_serving more than one dwelling unit. <br /> Piping located outside'the conditioned space. <br /> Piping from the:water'heater to a distribution manifold, <br /> Piping located under-a floor slab. <br /> Buried in piping. <br /> Supply and return piping iri recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A copy of the energy cacls-shall be with perm t at all times <br /> 27.. Copt/oflnal:insulation report shall be provided with permit before JWL <br /> 28.No fence, pool onscreen enclosure Is issued with:this permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />