Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 ofthe 2016 N.E:C <br /> 24. Iri accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-.'R403.5.3Hot water pipe insulation, <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following:: <br /> Piping inch (19:1 mm)and larger-in.nominal diameter.. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside'the conditioned space.. <br /> Piping from the water'heater to.a distribution manifold: <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> 'Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A copy of the energy cacls-shaft be with'permit at all times <br /> 2Z Copy offinal:insulation-Fepowt shall-be provided with permit before rnal <br /> 28. No.fence,pool or enclosure is issued with this permit <br /> RRE:-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.'-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />