Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406:11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25:.R403.5.3Hot water pipe insulation. <br /> Insulation for hot water.-pipe Withh-a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31, inch (19.1 mm) and larger-in. nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold:_ <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before CO: <br /> 26.A cony of the energy cacls shall be with permit at all times <br /> 27. Cony of lhal'insulation report-shall be provided with permit before r1nal <br /> 28. No fence,pool or enclosure:is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />