Laserfiche WebLink
23, Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots.shall be soddebforde. e final. of least 10 <br /> feet around the structure. <br /> 25:.14403.5.3Hot water.TO insulation <br /> Insulation for hot water. pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping_31, inch (19.1 mm)and larger in.nominal diameter. <br /> Piping,seeing more than.one dwelling unit: <br /> Piping located outside the conditioned space:, <br /> Piping from the:waterheater to a distribution manifold.- <br /> piping.located under a floor-slab: <br /> Buried in piping,. <br /> Supply and return piping in recirculation,systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the energy cacls shall be with Permit at all tines <br /> 27 Copy of Llhal.insulation reyort shall be Provided with Permit before rnaL <br /> 28. No fence,pool onscreen enclosure :is issued.with ahis Permit' <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric.Code (2016) <br />