Laserfiche WebLink
813-78MO20. City.of Zephyrhills Permit Application Fax-813-780-0021. <br /> Building Department <br /> it f <br /> Date Received Phone Contact for Permitting 321 247. .6073 <br /> aaaaaaa■ ■sass <br /> Owners Name Milene Piedra Owner Phone Number (321)247 8073 <br /> Owners Address 355B6 STELLA VAST DRIVE Owner Phone.Number <br /> Fee Simple Titleholder Name Owner Phone Number. <br /> Fee Simple Titleholder Address <br /> JOB ADDRESS 35586 STELLA VAST DRIVE;ZEPHYRHILLS,,FL 33541. LOT# <br /> SUBDIVISION Silverado Ranch PARCEL ID# 3225210100019000070 <br /> (OBTAINED FROM PROPERTY TAX NOTICE) <br /> WORK PROPOSED NEW CONSTR ADD/ALT. Q SIGN 0 Q DEMOLISH <br /> ® INSTALL "B REPAIR <br /> PROPOSED USE = SFR 0 COMM = OTHER <br /> TYPE OF.CONSTRUCTION 0 BLOCK Q FRAME = STEEL 0 <br /> DESCRIPTION OF WORK Installation of photo voltaic solar panel.on rooftop. <br /> BUILDING SIZE SQ FOOTAGE= HEIGHT.. <br /> =BUILDING $ VALUATION OF TOTAL CONSTRUCTION $21379.20 <br /> =ELECTRICAL $ AMP SERVICE = PROGRESS ENERGY = W.R.E.C. <br /> =PLUMBING $ X Duke Energy ` (Y/n!� <br /> =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION <br /> �fflf? <br /> =GAS = ROOFING 0 SPECIALTY = OTHER- <br /> FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES. NO <br /> .BUILDER.. COMPANY Momentum Solar <br /> SIGNATURE Cameron Christensen REGISTERED I. Y/N FEE CURREN Y/N <br /> Address 6210 Hoffner Ave Ste 100 Orlando FL 32822 License# I CVC57036 <br /> ELECTRICIAN. COMPANY. Momentum Solar <br /> SIGNATURE atthew Franz REGISTERED Y/N FEE CURREN Y'/N <br /> Address 6210 Hoffner Av .Ste 100.Oriando FL 32822 License# FEC13008217 <br /> PLUMBER ;COMPANY <br /> SIGNATURE REGISTERED : YIN FEE CURREN LILIN <br /> Address License# <br /> MECHANICAL COMPANY <br /> SIGNATURE REGISTERED I Y"/N FEE CURREN Y I N. <br /> Address License# <br /> OTHER COMPANY <br /> SIGNATURE REGISTERED 'Y/N FEE CURREN I Y/N <br /> Address License#, <br /> /flaala itaIaIa11a'a III■!■/laaaaaaaaaaaaaaala"a'aaI <br /> RESIDENTIAL' Attach(2)Plot Plans;(2)sets of Building Plans;(1)'set of Energy Forms;R-O-W Permit for new construction, <br /> Minimum ten(10)'working days after submittal date.Required onsile;Construction Plans,Stornwater Plans w/Silt Fence Installed, <br /> Sanitary Facilities&1 dumpster,Site Work Penult for subdivlsionstlarge projects <br /> COMMERCIAL Attach(2)complete sets of Building Plans plus a life Safety Page;(1)set of Energy Forms.R=0-W"Permit for new constri)ctlon, <br /> Minimum ten(10)woddng days after submittal.date:Required onsite,Construction Plans,Stomtwater Plans w/Silt Fence Installed, <br /> Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance <br /> SIGN PERMrr Attach(2)sets of Engineered Plans. <br /> •"'PROPERTY SURVEY required for all NEW construction. <br /> Directions: <br /> Fill out application completely., <br /> Owner&Contractor sign back of application,notarized, <br /> If over$2500,a Notice of Commencement is required.(AIC upgrades over,$7500) <br /> Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same <br /> OVER THE COUNTER PERMITTING .(copy of contract required)' <br /> Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) <br /> Driveways-Not over Counler.if on public roadways..needs ROW <br />