Laserfiche WebLink
Envelope Leakage Test Report (Blower Door Test) <br /> Residential Prescriptive, Performance or ERI Method Cornpliance <br /> 2017 Florida Building Code, Energy Conservation, 6th Edition <br /> Jurisdiction: c i z rZ //g Permit#: pO p$-- )026 <br /> Job Information: . <br /> Builder:aV# r,l Community: Lot <br /> Address: 5— ff s— /y L5 <br /> City: Z� 2-ji" .Ls:' c,`istate Florida Zip:` <br /> — - <br /> Air Leakage Test ttesults: Pas`singresi%Its'm`tistineeteitherthePerformance,Prescriptive,orE_RI.Method.;. <br /> [�-PREkRIPTIVE METHOD-The bUi Idin""or dwelling unit shall bg-tested,an d:ver•(fed as having a,mair leakage,rateof not exceeding 7 air changes <br /> per hour at a. ressUre of 0,.2-inch w: 50,'pascals)inClimete Zones 1.and.2. <br /> e: <br /> MIKERFO` MAACE or ER[METHOD-The bdilding ordwellihg unit shall be tested and verified as havinga'h!air leakQ6 rate oth pt exceeding the <br /> selected NCH(50)value,8 shown on FORM R405-20J 7(Performance)or R406-2017(ERI),section labeled as Infiltration;`sub=''section ACH. <br /> Ins = <br /> EACH(50)specified on Form R405-2017-Ener Calc(Performance)or R406-2017(ERI): <br /> Method for calculating building volume <br /> X 60 �t���� _ `ii' ® Retrieved from architectural plans <br /> CFIVI Building"Volume ACH50 <br /> ' ❑ Code software calculated <br /> Q� PASS :' TAIL77 <br /> When ACH50;is less.than.3;ACH56,;Mechanical;',Ventilatioh Field.! easured andkpalcul'at'd `t0 Field measured?and calculated <br /> pq <br /> a,.. „; <br /> in stallation.:rriust lie verified"by building department. <br /> Testing.Testlng'=siallbo etltA pressor0.2csw:g(SOPsca )'Tesingi d sha'becondueeit er <br /> iilldividuals as defined inSection 553.993(5)or(7),Florida Statues,or Individuals licensed asset forth in Section <br /> 489.105(3)(1),(g),or(i)oran approved third party.Awritten report of the results ofthe testshall be signedfby.the party conducting the test and•,providedtothe codeofficial. <br /> Testingshall be performed atanytimeaftercreation ofall penetrations ofthebuildingthermaienvelobe. <br /> During testing: <br /> 1 Exterior windows and doors,fireplace and stove doors shall be closed,but notsealed,beyond the intended weather-strippingor other infiltration control measures <br /> -2 Dampers including exhaust,intake,makeup air,back draftand flue dampers shall be closed,butnotsealed beyond intended infiltration control measures. <br /> 3.Interior doors,if installed at.the time of the test,shall beopen. <br /> 4.Exteior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off. <br /> 6.Supply';and return registers,if installed at the time of the test,shall be fully open. <br /> Testing"company <br /> Company Name: airEnalasys= Phone: 877=437=7728 <br /> I hereby,verify that the above Air Leakage resulfs are.in accordance with the 2017 6th Edition Florida Ruilding Code Energy.;` <br /> Conservation requirements according to the,compliance'rnetho;d.,selected,above."-- •` <br /> Ad <br /> Signature of Tester: ate:. - ` Date ofTest: 0; �a 02 <br /> Printed Name of Tester: William,Mago <br /> Lice nse/Ce rtificatio n# RESNET 4309320,' '.: ,,.:...,_:,. . .,Issuing-Authority: FSEC <br />