Laserfiche WebLink
Envelope Leakage Test Report (Blower Door Test) <br /> Residential Prescriptive, Performance or ERI Method Compliance <br /> 2017 Florida Building Code, Energy Conservation, 6th Edition <br /> Fj u—risdiction: 6i -6z z Permit#: — p O T — o <br /> Job Information: <br /> Builder: c2 �� Community: Lot <br /> Address: Unit: <br /> City: z ,� - ls' Stater, Florid'a'" <br /> J;• - <br /> , :.t 1. <br /> Air Leakage Test ResUItS: Pas'lngresultsiii'ustineeteifherthePerform'ance,Pre <br /> scriptive,ortERl.,Method, .„ <br /> I>::r+ " .. ., .. . spa.;.. <br /> ❑ PRESCRIPTlV.EMETHOD-The building!ordwellingunitshallbetestedand,verified,ashavingah,airleal(age,r'ate'ofnotexceeding7 air changes <br /> per hour at a.pressure of 0,,2-inch Wig.`,(50;'pascals).in;Cli'mate Zones 1 and.2. <br /> 21YERFORMANCE or ERINETHOD-The.bu)Iding or dwelling unit shall be tested and verified as having'ah!air leakage rate o6ot exceeding the <br /> selected ACH(50)value,as'`s'own on FORM R405-20J 7(Performance)or R406-2017(ERI),section labeled as Infiltration;;sub..'§ection ACH.' <br /> G"'ACH(50)specified on Form R405-2017-Ener Calc(Performance)or R406-2017(ERI): <br /> Method for calculating building volume. <br /> -, X 60 ^/.2 72 ® Retrieved from architectural plans , <br /> CC�FMSO. Building.V0lume ACHso <br /> ^ / ❑ Code software calculated <br /> l a� PASS <br /> ❑ When ACH5P.is less than.3;ACHso.;Mechanical:Ventilatio'n Field measur6d!and;:balcul'ated Field measured'.and,ca'Iculated <br /> installation,;must b;e ve"rified by building department. <br /> Testing.Testing'"shall be cond ucted in accordance with ANSI/RESNET/ICC380 and reported at'a pressure or0.2lnches w`d.(50 Pascats)I Testing shall;be conducted byeither <br /> individuals as defined in Section 553.993(5)or(7),Florida Statues,orIndividuaIs licensed asset forth in Section <br /> 489.105(3)(1),(g),or or an approved third party.Awritten report of the results of the testshall be signed,by.the party conducting the test and:Providedtothe code official. <br /> Testingshall be performed atanytimeaftercreation ofall penetrations ofthebuildingthermalenvelope.' <br /> During testing: <br /> 1 Exteriorwindows anddoors,fireplace and stove doors shall beclosed,butnotsealed,beyond the intended weather-strippingor other infiltration control measures, <br /> 2 Dampers including exhaust,intake,makeup air,back draftand flue dampers shall be closed,butnotsealed beyond intended infiltration control measures. <br /> 3.Interior doors,if installed at the time of the test,shall be open. <br /> 4.Extd'rior doors for continuous'ventilation systems and heat recovery ventilators shall be closed and sealed. <br /> 5.Heating and cooling systems,if Installed at the time of the test,shall be turned off. <br /> 6.SupA,-,and return registers,if installed at the time of the test,shall be fully open. . <br /> Testing�cpmpany <br /> Company Name: alrEnalasVs'z . Phone: 877-431=7728 <br /> I hereby verify fliat the above Air Leakage results are in accordance with the 2017.6th Edition Florida Building Code Energy' <br /> Conservation requirements according to the,compliarice'method.selected above:: ` <br /> Signature of Tester: Date of,Tds_t: <br /> Printed Name of Tester: William Maio <br /> Lice nse/Ce rtificatio n# RESNET43093201`:, , ..,.,. , Issuing•Authoelty: FSEC <br />