Laserfiche WebLink
NOTICE*OF DEED RESTRICTIONS: The undersigned understands that tl�is permit may be subject to"deed" restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions. <br /> UNLICENSED:CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: 'If the owner has hired a..contractor or <br /> contractors to'undertake work; they may be required to be licensed in.accordance.with state and,Iocal.regulations. If the <br /> contractor is not licensed as required by law, both the owner and'contractor may:be cited for a misdemeanor violation <br /> under state law. If the owner or intended,contractor are uncertain as:to..:what.4icensing,requirements'may apply-for the <br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign <br /> portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND..RESOURCE RECOVERY FEES: The undersigned understands <br /> that Transportation-Impact.Fees•-and Recourse Recovery Fees may appl ,to theconstr`uction•`of new buildings, change of <br /> use,in-existing-bUildings,_or expans on_of-existing,buildings,:as specified i 4_Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at-the time`of--- <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior-to <br /> receiving a "certificate of occupancy" or final power release. If the:projectldoes not involve a certificate of occupancy or <br /> final power release, the fees must be paid prior to permit issuance: Furthermore, if Pasco County Water/Sewer Impact <br /> fees are due, they must be paid prior to.permit issuance in accordance with applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 71% Florida Statutes,as amended): If valuation of work is$2,500.00.or more, I <br /> certify that I, the applicant; have been provided with a copy of the "Florida Construction Lien Law—Homeowner's <br /> Protection Guide" prepared"by,.the`Florida:Department of.Agriculture.-and Consumer Affairs.. If-the applicant is someone <br /> other than the"owner",1 certify_that,l have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner" prior to commencement..,I <br /> CONTRACTOR',S/OWNER'S"AFF.IDAVIT:_.I,certify;that.all the„information in this application is accurate and'#hat all work <br /> will be done in compliance with all applicable.laws'regulating construction, zoning•and land development. Application is <br /> hereby .made to obtain a`permit to do work"�and installation as`'indicated: (certifythat .no.work.or installation has <br /> commenced prior,to.issuance of a permit and that all work will be"performed to"meet standards of all laws regulating <br /> construction; County•and City codes, zoning regulations, and iand'development regulationslin the jurisdiction. I also <br /> certify that I understand:'that`the regulations of other government agencies may apply to the intended work, and that it is <br /> my responsibility to identify what actions I must take to be incompliance. Such.agencies iriclude,but are not limited to: <br /> Department of.'Environmental Protection-Cypress'Bayheads, 1Netland'Areas..and'Fnvironmentally Sensitive <br /> Lands,VllaterMlastewater Treatmentl,_. <br /> p... .. <br /> Southwest Florida Water Manag lament District Wells, Cypress Bayheads, Wetland Areas, Altering <br /> .Watercourses. <br /> Army Corps of Engineers-Seawalls;Docks, Navigable-Waterways. <br /> Department of Health & Rehabilitative Services/Environmental Health' Unit Wells; Wastewater Treatment, <br /> Septic Tanks. <br /> US'.Environmental.Protection Agency-Asbestos abatement. <br /> - Federal Aviation'Authority-Runways.-1 <br /> I understand that thefollowing restrictions apply to th`e'use of fill: <br /> Use of fill isnot allowed in Flood. <br /> If unless expressly permitted. <br /> - If the,fill,mateddl"..is,to be used in j Flood. Zone-"A", it is understood that.a drainage plan,,-.addressing a <br /> "compensating.vol6me".will be submitted"at time of permitting which'is prepared by a professional engineer <br /> licensed,by the State of Florida. � , i <br /> = If.the fill material is to`,be used:in Flood Zone "A"' in connection with a permitted .building using stem wall <br /> construction; l certifythat fill will be used-only to fill the area within the stem wall. <br /> - . If fill material is to be used in anyi area, I certify that use iof such fill will not adversely affect adjacent <br /> properties:;1f use:of,fill is found to adversely affect adjacent properties, the owner may be cited for violating <br /> the conditions;-cf;the°building.permit(issued under the attached permit application, for lots less than one (1) <br /> acre which::are:elevafed`:by fll; an engineered drainage plan is required. .' <br /> If f.am.the:AENTFOR';TiE OWNER;I promise in good faith to.inform the owner.of the'permitting conditions set forth in <br /> this 6.Mdavif' prior:to,.:com'mencing.construction. 1 understand`that;a separate:permit may,be required for.electrical work, <br /> plumbing,%signs;-"wetis;':pools, air,�conditioning, gas, or other'installations,not.specifically included in the.application. A <br /> permit isstyed shall;be construed` o..be-a license ito<proceed with the,work and not as authority to violate, cancel, alter,..or <br /> set aside;;any:'provisions-';of theae,tchnical;codes, nor shall issuance:,of a permit prevent the Building Official from-thereafter, <br /> requiring:a:con'ection 4bri -in-plans;construction or violations of any,codes. Every permit issued shall become invalid <br /> unless tf"e.vuotk authofizetl"by, sucl permit is coppmenced within six months of.permit issuance, or if work authorized-by <br /> the permit'is suspended'or abandoned for a period of six(6)months after1he time-the work is commenced. An extension <br /> may be.requested,Jn,writing,;from.the',Building.Official for a!:period-not to exceed ninety(90) days and will demonstrate <br /> justifiable cause-for.the.`extension "Ifwork ceases for ninety(90),consecutive days,the job is considered abandoned. <br /> -WARNING TO-OWNER:.—YOUR,.-FAILURE'TO RECORD-A_NOTICE_OF-COMMENCEMENT MAY RESULT SIN YOUR <br /> PAYING'TWICE`FOR;IMPROVEMENTS TO YOUR;PROPERTY', IF-YOU INTEND"TO'OB'1 AIWFINANCIhIG;CONSULT --WITH YOUR LENDER OKAN ATTORNEY BEFORE,,,rRECORDING'YOU_ R'N ICE,` COMMENCEMENT. <br /> FLORIDA JURAT'(F.Sn1'17.03) <br /> W6WNER OR AGENT(, CONTRACTOR <br /> Subscribed an bswo o(or ffi e before a thi fit Subscdbed'and s o o r affi ed fore me this <br /> e H ?p <br /> y M;0C <br /> Who is/ persona y no t m r as ave produce Who is/a a Ily kn to me r has produced ��I as identification. as Identification. <br /> Notary Public Notary Public <br /> �/L► /�/ IWSoe r: <br /> Commission No. + �,Z Commission No. <br /> Name of Notary typed,printed or stamped Name of Notary typed 1 printed or stamped <br /> AP40� Notary Public State Of Florida ��' NOtery Public State at Florida <br /> Glennis M Daniels Glennis M Daniels <br /> ry C:W,11 tuon HH 019500 '{' My Commission HH 019500 <br /> xprwt 0708/2024 ? Expires 07/0812024 <br />