Laserfiche WebLink
21 Tamper-Resistant Receptacles in accordance with 406.11 of the.2016 N.E.-C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R.-value) of R-3 shall be applied to the <br /> following: <br /> Piping V, inch (19.1 mm)and larger in.nominal diameter, <br /> Piping.serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater-to a distribution manifold:_ <br /> Piping:located under a floor slab: <br /> Buried in piping. <br /> Supply and:return piping in recirculation systems other than demand recirculation systems. <br /> 25.' Blower door test shall be provided before C.O. <br /> 26.A copy of the enerzy cacls shall be with permit at all times <br /> 27 Copy of final.'insulation'report shaft be provided ivith permit before final <br /> 28. No fence,pool or screen enclosure :is issued with ahis permit' <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />