NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit-may be subject to"deed"restrictions"'
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in•accorda,ce with:•state and local regulations. 'if the
<br /> contractor is not licensed as required by law, both the owner and contractor:may be cited for a•misdemeanor violation
<br /> under state law. If the owner or intended contractor,are uncertain as to what)licensing requirements may'apply for the
<br /> intended work, they are advised to contact the Pascoli County Building Inspection'Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has. hired a contractor-or contractors., he-is advised to. have the contractor(s) sign
<br /> portions of the "contractor Block" of this.application for which they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled.to-permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT•AND:RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and.Recourse Recovery Fees.may apply to-the,construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also.•understands,•that•subh fees, as may due, will.be.ideritified at the time of
<br /> permitting. It is further understood'that Transportation.Impact.Fees,and Resource Recovery Fees must be paid prior to
<br /> receiving a certificate of.occupancy" or final power release. If-the project does riot involve a.certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. -Furthermore,'.if Pasoo County Water/Sewer Impact
<br /> fees are due,they-must be paid prior to.pprr'nitissuance in accordancewith applicabl'e•Pasco County ordinances.
<br /> CONSTRUCTION.LIEN LAW(Chapter 71.3.,-Floridl Statutes; as amended.): Ifvaluation of work is$2,.5.00.00 or more, I
<br /> certify that 1, the applicant, have been•provided with a.copy of the "Florida•Construction•Lien Law Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture-and:Consumer.Affairs. If-the.applicant is some
<br /> other than the"owner", I certify that.I have obtained a copy of the-above described document and promise in good faith to
<br /> deliver it to the"owner".prior to commencement.
<br /> CONTRACTOR'S/OWNER'•S`AFFID"A'VIT: 1 certify�hat.all the.information in this,application.is accurate and that all-work
<br /> will be done in compliance with all applicable laws regulating•construction;zoning-and1and development.. Application is
<br /> hereby made to -obtain a permit to,do work•-arid installation 'as indicated: I certify that no work or.installation has
<br /> commenced prior to issuance of a.permit and that all or will be.performed to meet standards of all laws regulating
<br /> construction, County and 'City-codes', zoning-regulations, .and'land• development regulations in the jurisdiction. I also
<br /> certify. that I understand that the regulations of other: o ern nt agencies may apply to the,intended work, and that it is
<br /> my responsibility to identify what actions I must•take to be,in compliance. Such agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> 1-ands,WaterMlastewater Treatment.
<br /> Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areasti Altering
<br /> Watercourses.
<br /> Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> Department,of..Health &Aeha'bilitative. Services/Environmental Health Unit=Wells, Wastewater Treatment,
<br /> Septic Tanksti
<br /> US.Environmental,Protection-,Agency-Asbestos.abatement.
<br /> Federal Aviation Authoelty-Runways. I'
<br /> I understand•thafthe following restrictions.apply•to•the-use of fill:
<br /> Use of fill is not allowed in Flood Zone"IV"unloss-expressly permitted.
<br /> If the fill material is to be used in Flood Zone "A", it is understood•that a drainage plan addressing a
<br /> "compensating volume"-will be submitted at time of.permitting:whioh -is prepared by a professional engineer
<br /> licensed by the.State of Florida.
<br /> If the fill material is to be used.;in Flood Zone "A" in connectiowi with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area-within the stem wall.
<br /> If fill•material is to be used in any area, I certify that use.of such.fill will 'not adversely affect• adjacent
<br /> properties. If use of fill is found.to adversely affect adjacent:properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under-the attached -permit application, for lots less than one (1)
<br /> acre-which are elevated-by fill, an engineered drainage plan'is required.
<br /> If I am the AGENT FOR THE OWNER, I.promise in good'faith to inform-the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand.that�a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the-applioation. A
<br /> permit issued'shall be construed to be a license to proceed with the.work and not as authority to-violate, cancel;•alter, or
<br /> set aside any provisions of the technical codes, nor,shall issuance of a permit prevent the Building Official from-thereafter
<br /> requiring a correction•of errors in plans, construction or violations of any codes. Every permit issued shall become.invalid
<br /> unless the work authorized by such permit is commenced within six months of.permit issuance, or if work-authorized-by
<br /> the permit is suspended or abandoned for•a period Hof six(6)months.after-the time the.work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate.
<br /> justifiable cause for the extension. If work ceases for.ninety(90)-consecutive days,the job is considered abandoned:
<br /> WARNING TO.OWNER: YOUR FAILURE TO RECORD-A NOTICE OF COMMENCEMENT-MAY RESULT'IN YOUR
<br /> PAYING"TWICE FOR JMPROVEMENTS TO'YOU R•PROPERTY.. IF'YO .114T.PEND TO'O TAIN FINANCING, CONSULT
<br /> WITH-•YOUR LEND.ER.OR AN ATTORNEY'BEFOkE RECO:RDIN;'.G.YOUR,.NO'ricr=.OF-COM.MENCEM.ENT.
<br /> FLORIDA JURAT'(F.S.117.03)
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed and sworn to(or affirmed)before me this Subscribed and sworn to(or affirmed)before me this
<br /> by by
<br /> Who Is/are personally known to me or has/have produced Who is/are personally.known to me or has/have produced
<br /> as identification. as identification.
<br /> Notary Public Notary Public
<br /> I
<br /> Commission No. Commission No.
<br /> Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped
<br />
|