Laserfiche WebLink
23.Tamper- Resistant.Receptacles in accordance.with 406.11 of the..2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall.be sodded_before final at-least-10. <br /> feet around the structure. <br /> 25..R403.5.3Hot water.pipe insulation. <br /> Insulation for hot water'pipe_With a minimum thermal resistance_1.(R-value) of R-3 shall.be applied to the <br /> followin <br /> Piping -1;inch (1.9.1 mm) and larger in:nominal diameter." <br /> Piping.serving more than.one dwelling unit: <br /> Piping located outside the conditioned space." <br /> Piping-from the water heater to a distribution manifold:, . <br /> Piping:Iodated under.a floor slab: <br /> Buried in piping. . <br /> Supply and return piping in recirculation'systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided:before C.O: <br /> 26.A copy of the en cacls'shall be with permit at all times-- <br /> 27. Copy of flihat insulation report shall be provided ivith permit before final <br /> 28 No fence, pool or screen enclosure :is issued with ahis permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W..-Right of Way <br /> A.D:A.-Americans with Disabilities Act_. N.E.C.-National Electric Code(2016) . <br />