<br /> NOTICE•OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumesrospohsibility for compliance with any
<br /> applicable deed restrictions..
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES:' If the owner has-hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state,and local regulations. If the
<br /> contractor is not licensed as required by law,.both the owner and contractor May�be'cited�for a misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what,licensing,.requirements may applyforthe
<br /> intended work, they are advised to contact the Pasco County Building Inspection Divisiort=Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is-advised to have the-contractor(s) sign
<br /> portions of the "contractor Block" of this application.for which.they will be responsible. If you,_as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE.RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery-Fees,may-apply to"the construction of new buildings, change of
<br /> use in existing buildings; or expansion of existing buildings,.as specified in Pasco County.Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned-also-understands;-that sucli'fees, as may be due, will be identified at the time of
<br /> permitting. It is further,understood that Transportation Impact fees and Resource Recovery Fees must be paid:prior to
<br /> receiving a "certificate of occupancy" or final power release.. If the,project does.notirivolve a certificate of occupancy or
<br /> final power release, the,fees must be paid prior to permit issuance. -Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are.;due,.they.m.ust;be.paid.prior.to permit issuance in accordance-with applicable Pasco Countyordinances.
<br /> CONSTRUCTION":LIEN,"LAW(Chapter 7131'Florida Statutes, as amended): 'If-valuation of work is$2,5O0:00 or more, I
<br /> certify. that I; the'','.applicant, have .been provided with--a copy of_the '•Florida -Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the:applicant;is someone.
<br /> other than the'owner'"I`certify that I have 'Obtained a copy of the above_described docuriient and promise in good faith to
<br /> deliver it to the"own.ee,'prior to commencement.
<br /> CONTRACTOR';_S•IOWNERW AFFIDAVIT: I .certify:a.at_all..the;information in this application:is accurate;,and.:that all work
<br /> will be done in compliance'with all applicable laws regulating construction, zoning and1and development." Application-is
<br /> hereby made to obtain a permit to do work and installation as' indicated: I *certify that no work.or installation has-
<br /> commenced:,pdor:to issuance of a permit and that.all work will.,'be performed to.meet"standards of all laws regulating
<br /> construction;`County�_.and-City codes; zoning regulations, and.1814 development regulations in the jurisdiction. I also
<br /> certify:that.1.under,stand.that the regulations of other government agencies may apply4o,the intended work, and that it is
<br /> my responsibility to: what actions I must take to-be in compliance: Such agencies include but are not limited to:
<br /> Department of*Environmental Protection-Cypress Bayheads; Wetiand..Areas.and.Environmentally Sensitive
<br /> Lands-WaterM/astewater Treatment.
<br /> Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Alteting
<br /> Watercourses.
<br /> Army Corps of Engineers-Seawalls, Docks, Navigable 6'terways.,
<br /> Department of Health & Rehabilitative Services/,Environmental Health Unit=Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> US.Environmental Protection.Agency-Asbestos°°abatement:
<br /> - Federal Aviation Authority-Runways.
<br /> I.-Understand that ihit4ollowing restrictions:apply.to the use offill:', _
<br /> Use of:fill'is not allowed in:Flood-Zone'V,unless-expressly:permitted._ ..
<br /> If the fill material'is to be- used in Flood LLitris'"uinid,&tood .that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of:"permittingnwhich•lis,prepared.by a professional engineer"
<br /> licensed,bythe State of Florida.
<br /> If:.the fill material is to:be used'in-Flood.Zone w!'' i';66nnection with a permitted building*using stem wall:,
<br /> construction,:I:certifythatfiilltyill be•used only to filhthe,'areatwithin�thestem:wall.
<br /> If fill mateftVis to be, used in any area,.I certify Ahat use of such fill will not adversely affect adjacent
<br /> properties:;:af use of fill is found to adversely affect._.adjacent;:properties;:,theDwnermay.,be cited for violating
<br /> the conditions of-the building permit'issued under the-:attached:permit application, for lots less than one 0).
<br /> acre-which•>•are-:elevated by.fill,amengineered,draina&#bn-is required.
<br /> If I am the AGENT"-FOR THE OWNER, I promise in good`faiff;_to._inform_..tl'e�owner:of._the:permittingxonditions:set-forth-in--_---- -
<br /> —this affidavif�prior_'to commencing construction I understand:that.:a:separate:permit may be required for electrical work,;
<br /> plumbing,;,:signs, weft;-.pools, air conditioning, gasi or-other installations;nofr:specifically"included in the,application. A
<br /> permit issued.-shall:be:construed to be a license to proceed with ahe,work-.:and not as authority to violate, cancel; alter,:or
<br /> set aside::any..provisions of'the.technical.Codes,,norslialfissuance:,of<a permit prevent the Building Official from thereafter,:::, ., .
<br /> requiring,-.a correction of errors in plans, construction or violations—of—any--codes Every permit issued shall become invalid
<br /> unless the.work.authorized by.such permit is commenced within,six..:months of,permit issuance, or if work authorized,;by�,
<br /> the permlfls-suspendedor abandoned for a period of six(6)months after.the`time`the work is-commenced. An extension
<br /> may be:requested,.in writing, from the Building.Official for a°period.:;not to exceed ninet (90) days and will demonstrate '2.
<br /> justifiable cause for the extension. If work.ceases4orninety(90)consecutive days,:the'o s considered abandoned. "-
<br /> WA
<br /> RNING.TO OWNER: YOUR;FAILURE TO RECORD A NOTICE OF.COMMEN NT MAY RESULT IN YOUR"
<br /> IM UINT ; O PAYINGTVVICE�FOR ; I. D7 F UT
<br /> - WITH YOUR'LENDER OR AN ATTORNEY'BEFORE REC'ORDItUGYOUR`-NOTICE MENCEMENT. -
<br /> FLORIDA JURAT'(F.S.1 t7:
<br /> .t
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed and sw o r ffinned) efor m this Subscribed and swom to(or-a rme )b f me is
<br /> 10-21-20by 10_21-20 by
<br /> Who is/are pers nally known to me or has/have produ ed Who Ware personally known to me or hastha a produced
<br /> as identification. asidentification.
<br /> Notary Public Notary.Public
<br /> Commission No. Commission No.
<br /> Name Name.of Notary ty ed,printed or stamped
<br /> 40% Notary Public State of Florida
<br /> Alicia Herweh-Cannon ap•►+n , Notary Public State of Florida
<br /> Alicia,Herweh-Cannon =V
<br /> Ex Commission 22 218378 My commission GG 218378
<br /> Expires OSl16I20 �0,M1,D Expires 05/16/2022
<br /> ;r,
<br />
|