Laserfiche WebLink
A <br /> 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25..R403.5.3Hot water pipe insulation <br /> Insulation for hot_Water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping inch (1,9.1 mm) and larger in.nominal diameter. <br /> Piping serving more than,one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:water heater to.a distribution manifold. <br /> Piping.Iodated under a floor slab. <br /> Buried in piping, <br /> Supply and_return piping in recirculation systems other than demand recirculation-systems. <br /> 25.Blower,door test shall be provided before C.O. <br /> 26. A copy of the enerjzy.cacls'shafl be with pernut at all times <br /> 27. Copy of final insulation report shall be provided with permit before rnaL <br /> 28 No fence,.pool or screen enclosure .is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> RB.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />