813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021
<br /> Building Department
<br /> I
<br /> NOTICE OF DEED RESTRICTIONS'The undersigned understands that this permit may be'subject to"deed"restrictions"which may be more restrictive
<br /> than County regulations.The undersigned assumes responsibility for compliance with any applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES:If the owner has hired a contractor or contractors to undertake work,they
<br /> may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law,both the owner and
<br /> contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements
<br /> may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-8009.
<br /> Furthermore,if the owner has hired a contractor or contractors,he is advised to have the contractor(s)sign portions of the"contractor Block"of this
<br /> application for which they will be responsible. If you,as thelowner sign as the contractor,that may be an indication that he is not properly licensed and is
<br /> not entitled to permitting privileges in Pasco County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction'of new buildings,change of use in existing buildings,or
<br /> expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended.The undersigned also understands,that
<br /> such fees,as may be due,will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery
<br /> Fees must be paid prior to receiving a"certificate of occupancy'or final power release.If the!project does not involve a certificate of occupancy or final
<br /> power release,the fees must be paid prior to permit issuance.Furthermore,if Pasco County Water/Sewer Impact fees are due,they must be paid prior
<br /> to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes,as amended):If valuation of work is$2,500.00 or more,I certify that I,the applicant,
<br /> have been provided with a copy of the"Florida Construction'Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of
<br /> Agriculture and Consumer Affairs.If the applicant is someone other than the"owner', I certify that I have obtained a copy of the above described
<br /> document and promise in good faith to deliver it to the"owner'prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with
<br /> all applicable laws regulating construction,zoning and land development.Application is hereby made to obtain a permit to do work and installation as
<br /> indicated.I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all
<br /> laws regulating construction,County and City codes,zoning regulations,and land development regulations in the jurisdiction.I also certify that I
<br /> understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I
<br /> must take to be in compliance.Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads,!Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells,. Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses. 1 __-- -
<br /> - Army Corps of Engineers-Seawalls,! Docks, Navigable Waterways. --
<br /> - Department of Health & Rehabilitative Services/Environmen'tal Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency Asbestos abatement.
<br /> - Federal Aviation Authority-Runways: .
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone W" unless expressly permitted.
<br /> If the fill material is to be used ih Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wall.
<br /> If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to
<br /> commencing construction. I understand that a separate permit may be required for electrical work,plumbing,signs,wells,pools,air conditioning,gas,or
<br /> other installations not specifically included in the application!A permit issued shall be construed to be a license to proceed with the work and not as
<br /> authority to violate,cancel,alter,or set aside any provisions;of the technical codes,nor shall issuance of a permit prevent the Building Official from
<br /> thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work
<br /> authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit is suspended or abandoned for a
<br /> period of six(6)months after the time the work is commenced.An extension may be requested,in writing,from the Building Official for a period not to
<br /> exceed ninety(90)days and will demonstrate justifiable cause for the extension.If work ceases for ninety(90)consecutive days,the job is considered
<br /> abandoned.
<br /> !
<br /> WARNING TO OWNER: YOUR FAILURE TOI RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU'IINTEND TO OBTAIN FINANCING, CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT,
<br /> FLORIDA JURAT(F.S.
<br /> I
<br /> OWNER OR AGENT CONTRAC OR
<br /> Subscribed and sw dim t (or affirmed)befQre me this I S thend swor o( affir before me this
<br /> Whb is/are personally kno o-m€-o as/Have produced Who is/are personally known to me or has/have produced
<br /> as identification. I as identification.
<br /> Notary Public ' " � Notary Public
<br /> Co m fission No.l:l�3 f-(N l)� Com ' sion No. G�
<br /> M; 1 O gS
<br /> z[a 11 Oy wcu
<br /> Name of Nbtary typed,printed or stamped Name of o ary typed,',print d or stamped
<br /> ' I
<br /> i
<br /> AtiGE A r3Awv00D ac ANGELA HAvw000
<br /> `i =`Lr Notary Public-State of Florida
<br /> i �`. Notary oLa:�c State of �...
<br /> Tt:; Commission=GG 344085 I �Tr: Corrmissior a GG 344085
<br /> My Comm.Expires Aug Florida24.2023 o,n?: My Corrm.Ex
<br /> pues Aug 24,2023
<br /> 3or=cec through National Not
<br /> Assn. Bor,Cec through National Notary Assn.
<br /> i
<br /> I
<br /> I !
<br />
|