NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit-may be subject to "deed" restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility,for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND- CONTRACTOR RESPONSIBILITIES:- If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in-accordance with..-state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor:may be cited for a-misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection•Division—Licensing Section-at 727-847-
<br /> 8009. Furthermore, if the owner has. hired a contractor or contractors•, he- is advised to. have the contractors) sign
<br /> portions of the "contractor Block" of this.application for which they will be responsible. If you, as the.owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled.to-permitting-privileges in Pasco
<br /> County,
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND:RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees.may apply to•the.construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also.,understands•,,that-such fees, as.may-be due, will be identified at the time of
<br /> permitting. It is further understood'that Transp'ortation.Impact-Fees%and Resource Recovery Fees must be paid.prior to
<br /> receiving a certificate of.occupancy' or final.power release. If-the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. -Furth ermore,1f Pasco County Water/Sewer Impact
<br /> fees are due, they-must be paid prior to-permit issuance in accordance with appllcable-Pasco County.ordinances.
<br /> CONSTRUCTION-LIEN LAIN(Chapter 7.1.3.,-Florida Statutes; as amended): If valuation of work is$2,.5.00.00 or more, I
<br /> certify that 1, the applicant, have been•provided with a-copy of the "Florida'Construction•Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture-and:Consumer.Affairs, If•the.applicant is someone
<br /> other than the"owner", I certify that•1 have obtained a copy of the-above described document and promise in good faith to
<br /> deliver it to the"owner'.prior to commencement.
<br /> CONTRACTOR'SIOWNEW,S'AFFIDA1/1T: (.certify that,all the.information in this.application.is accurate and that all-work
<br /> will be done in compliance with all applicable laws regulating construction;'zonin'g and,land development.: Application is
<br /> hereby made to -obtain a permit to,do work, and installation 'as ind'icated': I certify that no work or. installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and 'City-codes, zoning-regulations, .and'land development regulations in the jurisdiction. I also
<br /> certify, that I understand that the regulations of other:government agencies may apply to the-intended work, and that it is
<br /> my responsibility to identify what actions I must.take to be,in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally.Sensitive
<br /> -Lands,Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas; Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department of :Health &.':Reha'bilitative Services/Environmental Health Unit=Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US.Environmental:Protection•Ag'ency-Asbestos.abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand.that'thefollowing restrictions.app'Iyto.the•use of-fill:
<br /> Use of fill is not-allowed in Flood Zone W"unless-expressly permitted.
<br /> If the fill material is to be used in Flood Zone 'W', it is understood•that a drainage plan addressing a
<br /> "compensating volume"will be submitted at time of.permitting:whioh is prepared by a professional engineer
<br /> licensed by the.State of Florida.
<br /> If the fill material is to be u:sed.;in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area-within the stem wall.
<br /> If fill•material is to be used in any area, I certify that use .of such.fill will not adversely affect. adjacent
<br /> properties. If use of fill is found.to adversely affect adjacent-properties, the,owner may be cited for violating
<br /> the conditions of the building permit issued under-the attached!permit-application, for lots less than one (1)
<br /> acre which are elevated-by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good'faith to inform-the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand.that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the-application. A
<br /> permit issued'shall be construed to be a license to proceed with the work and not as authority to-violate, cancel;•alter, or
<br /> set aside any provisions of the technical codes, nor shall Issuance of a permit prevent the Building Official from-thereafter
<br /> requiring a correction•of errors in plans, construction or violations of any codes. Every-permit issued shall become.invalid
<br /> unless the work authorized by such permit is commenced within six months of.permit issuance, or if work-authorized-by
<br /> the permit is suspended or abandoned for•a period of six (6) months.after-the time the.work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate.
<br /> justifiable cause for the extension. If work ceases for-ninety(9Q)consecutive days, the job is considered abandoned.
<br /> WARNING TO.OWNER: YOUR FAILURE TO RECORD.A NOTICE-OF COMMENCEMENT.MAY RESULT 1N YOUR
<br /> U'
<br /> PAYING TWICE FOR:IMPROVEMENTS TO'YOUR•PROPERTY.. iF•YO .INTEN')TO'OBTAIN FIN•ANCCNO, CONSULT
<br /> WITH•-YOUi2.LEND:ER.OR AN ATTORNEY'BEFORE RECORDING.YOUR•.NO'_rICE.OF•COM.MiENCEMENT.
<br /> FLORIDA JURAT(F.S.117.03)
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed and sworn to(or affirmed)before me this Subscribed and sworn to(or affirmed)before me this
<br /> by by
<br /> Who is/are personally known to me or has/have produced Who is/are personally.kriown to me or has/have produced
<br /> as identification. as identification.
<br /> Notary Public Notary Public
<br /> Commission No. Commission No.
<br /> Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped
<br /> "h
<br />
|