Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5,3Hot water.pipe insulation. <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping'I.inch (1.9.1-mm)and larger in.nominal diameter. <br /> Piping serving more than_one dwelling unit. <br /> Piping located outside the conditioned space:, <br /> Piping from the water'heater to a distribution manifold., <br /> Piping located under'a floor slab. <br /> Buried in piping. <br /> 'Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower.door test shall be provided.before C.O: <br /> 26.A copy ofthe enerzy-cacls-shall be=with permit at all times- <br /> 27. Cope offnalinsulation report shall be provided with permit before fnab <br /> 28. No fence,pool or screen-enclosure :is issued with:this-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6'h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />