NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance-With any
<br /> applicable deed restrictions. I i ,
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor' or
<br /> contractors to undertake work, they maybe required to be licensed inaccordance with state and local regulations. Ifthe
<br /> contractor is not licensed as required by law, both the owner and''c6ntractor may be cited for a misdemeanor violation
<br /> under state law. If the owner or:intended contractor are uncertain,.as:to,what licensing.-requirements may apply for,the
<br /> intended work, they are advised to contact the Pasico County Building.Inspection Division-Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner-has hired'a contractor or contractors, he..,Is advised.to have thecontractor(s) sign
<br /> portions of the "contractor Block" of this application' for which they will be responsible. If-you, as the owner sign as,the -
<br /> contractor, that may be an indication that he is not properly licensed and Is not entitled to;permitting-privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees.may apply to the.construction-of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and--
<br /> 90-07, as amended. The--undersigned also understands,,that such fees, as maybe-due, will be identified at the time of
<br /> permitting. It is further understood that Transportal tion Impact.Fees and Resource Recovery Fees must be paid.prior to
<br /> receiving a "certificate,of occupancy" or final power release. If the,project does not involve a certificate of-'occupancy or
<br /> final power release, the fees must be.paid prior to permit issuance. -Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid prior Wpermit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713,Fllorlc a Statutes-as,amended): If valuation of work is$2,5.00.00 or more, I
<br /> certify that 1, the applicant, have been-provided with a copy of the "Florida,Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Departrient of Agriculture:and:Consumer Affairs. .If the applicant:is someone
<br /> other than the"owner", I certify that I have-obtained a copy of the above described'doc'ument and promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT:. (;certify that all the information in;.thls application is accurate-and,that all work
<br /> will be done-in compliance with all applicable lawi regulating construction, zoning anfland'development. Application is
<br /> hereby made to obtain a permit to do work and installation-as Indicated. I certify-that- no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed,f6.._m' e6t-standards of all laws regulating
<br /> construction, County and City co"des,''zoning regulations, and land development regulations in the jurisdiction. I also
<br /> 6r government-agencies"ma pp!y-to.the intended work, and that:it is
<br /> certify-that I understand that the regulations of other y?
<br /> my responsibility to identify what actions I must take to be in compliance.- Such agencies 'include:but are not limited-to:
<br /> Department of Environmental Protectjon-aCypress Bayheads, Wetland.Areas.and...Environmentally Sensitive
<br /> ...Lands,Water/Wastewater.Treatment.
<br /> Southwest Florida Water Management District-Wells, Cypress Bayheads, Welland Areas, Altering
<br /> Watercourses.
<br /> Army Corps,of Engineers-Seawalls, Docks, Navlg6'14:Materways.
<br /> Department of Health &'Rehabilitative ServiceslEhvitonme inf6l'-'Health Unit-Wells, -Wastewater, Treatment,
<br /> Septic Tanks.
<br /> US Envirbntne6tal'Prdt6dtion-,Agenc sbestos:abatement-.
<br /> Federal Av
<br /> iation Authority-Runways.I understand.,that'the following,mstrictions.apply to the use of fill".
<br /> Use of.fill-is not.allowed in Flood Zone"V"-uhlieisg4kpiressly permitted.'
<br /> --6 - 'understood If the fill material ;is to, be used in Flood Zone "A", is understood that a drainage plan addressing a
<br /> "compensating-volume".will'be-submitted at time of--permitting which,is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the,,fill:material Js,_tobe_used i Fl n. I o, Zone- in connection with a permitted building, using stem'wall
<br /> construction,..I.-Ce'ttlfy that fill will be used-only t6 fill'the-area-within the stem wall.
<br /> If fill material is to be.,used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties.. If-use of fill is-f6undto.adversely affect adjacent properties, the owner may-be.cited for violating
<br /> the conditions of the build!6g permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill,-an engineered:dra naI` ge plan Is required.
<br /> If l am-the AGENT FOR THE OWNER, fliromise in'good faith.to inform-the owner of the permitting,conditions set forth in
<br /> this affidavit prior to commencing construction. I I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning;.gas, or other ihst6fleitioh67 hdtsoebifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with-the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the,1echrilcal bodes, nor shall issuance,of a permit prevent the Building�Official from thereafter
<br /> 1 6 * '
<br /> requiring a correction-of errors in plans, construction or violations of.any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within.sJx months of permit issuance, or if work authorized..by
<br /> the permit is suspended or abandoned for a period of-six(6)months afier:t�iq*:time the,work is commenced. An.extension
<br /> may be requested, in writing, from the Building,Official for a:period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If work ceases.for ninety(90)-consecutive.days,the job is considered abandoned.
<br /> WARNING TO-OWNER: YOUR-FAILURE TO-.RECORD�A,-NOTICE;OF COMMENCEMENT MAY RESULT-IN,YOUR
<br /> PAYING TWICE FOR:IMPROVEMEN'tS,-TO-,YOIjR---PkOPERTY.''-[F.'YOU--INTEND-TO-IOBTAIN FINANC INGP,-'CONSULT,;�,
<br /> WITWYOURLENDER-OR AN ATTOANEY'B'tFoRe-kECOkDING:,Y.OUR,NOTICE OF ZOMMENCEMENT.
<br /> FLORIDA-JURAT-(F_S.J17.03)._
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed and sworn to(or affirmed)before me this Subscribed and swam to(or affirmed}before me thi
<br /> —by by
<br /> Who is/are personally known tam me or has/have produced Who is/are personally known to me or,has/have produced
<br /> as identification. as identification.
<br /> —Notary Public Notary Public
<br /> Commission No. Commission No
<br /> Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped.
<br />
|