Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 of the 201.6 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall.be sodded before finial at least 10. <br /> feet around the structure. <br /> 25. R403.5,3Hot water Pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:- <br /> Piping I/, inch (19.1 mm) and"larger in nominal diameter.. <br /> Piping serving more than:one dwelling unit. <br /> Piping located_outside the conditioned space... <br /> Piping from the water heater to,a distribution manifold: <br /> Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O. <br /> 26.A copy of the"enerQy cacls shall be with"permit at all times <br /> 27.. Copt/of&al insulation report shall be provided with permit before fnaL" <br /> 28.No fence,pool or enclosure".is issued_withihis permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />