Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406.41 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be-applied to the <br /> following:, <br /> Piping.3/: inch (19.1 mm)and larger in.nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold:_ <br /> Piping located under a floor slat;. <br /> Buried in piping, <br /> 'Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before CO: <br /> 26.A copy ofthe enerEy cacls shall be with permit at all times <br /> 27. Copy of final insulation report shall be provided with permit before finab <br /> 28.No fence,Pool or screen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code Oh Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />