Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 ofthe 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation. <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: . <br /> Piping 314 inch (19.1 mm)and larger in nominal diameter: <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold._ <br /> Piping located under'afloorslab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.-Blower door test shall be provided before C.O: <br /> 26.A copy ofthe-enerry cacls shall be with yermit at all times <br /> 27. Cony offinal insulation report shall be provided ivith permit before rtnaL <br /> 28:No fenee,-pool or screen enclosure Is issued with This permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />