Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the.2016 N..E.0 <br /> 24. In accordance with the Land Development Code, lots.shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25; R403.5.3Hot water pipe insulation <br /> Insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping �1;inch (19.1 mm)and larger in. nominal diameter. <br /> Piping serving more than one dwelling unit: <br /> Piping located outside'the conditioned spate.. <br /> Piping from the water heater to a distribution manifold:. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25:Blower.door test shall be provided before C,O. <br /> 26. A copy ofthe enerizy cacls shall be with yermit at all times: <br /> 27.. CoPV ohUal insulation:report-shall be provided with permit before final <br /> 28. No fence, pool or screen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />