Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water-pipe insulation <br /> Insulation forhot.water pipe with a minimum thermal resistance (R-value) of R-3 shall. be applied to the <br /> following: <br /> Piping 31.inch (.1.9.1 mm)and larger in.nominal diameter. <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to,a distribution manifold. <br /> Piping located under a floor slab.. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> -25.Blower door test shall be provided before CO; <br /> 26. A cony of the enerzy cacls shall be with permit at all times. <br /> 27. Cony of-linal insulatioiz reportshalhbe provided ivith permit before fnaL <br /> 28. No fence,-pool or screen enclosure :is issued with:this permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />