My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-1184
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-1184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 8:10:01 AM
Creation date
6/1/2022 8:12:56 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-1184
Building Department - Name
JIMENEZ,SANDY
Address
5335 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,��,,,Irrrrrrrrr <br /> �zt�0"•D ••c•%92C� <br /> �D CA m rt m <br /> /��IRONRIDGE FlashFoot2 Installation Features ' <br /> 'rrnnnt�� <br /> The Strongest Attachment in Solar Q <br /> ;r:. Alignment Markers <br /> IronRldge FlashFoot2 raises the bar In solar roof <br /> protection.The unique water seal design is both Quickly align the flashing with chalk lines to find pilot holes. <br /> elevated and encapsulated,delivering redundant layers <br /> of protection against water intrusion.In addition,the <br /> twist-on Cap perfectly aligns the rail attachment with the _ 's �4. ! � 4F <br /> lag bolt to maximize mechanical strength. '; � �., ! OB Rounded Comers <br /> Makes it easier to handle and Insert under the roof shingles. <br /> Reinforcement Ribs <br /> Toftli-On Cap - Help to stiffen the flashing and prevent any bending or <br /> Mrt,Fcot2's unique Cap design encapsulates = crinkling during installation. <br /> ttoho bolt and locks Into place with a simple4K Three-Tier Water Seal f <br /> tWis 1me Cap helps FlashFoot2 deliver i FlashFoot2's seal architecture utilizes three <br /> �70 1 <br /> g1tr structural strength,by aligning layers of protection.An elevated platform 1 <br /> taand lag bolt In a concentric <br /> - I" _ diverts water away,while a stack of rugged <br /> odpath• components raises the seal an entire Inch. <br /> The seal Is then fully-encapuslated by the <br /> Cap.FlashFcot2 is the first solar attachment <br /> i-- •- to pass the TAS-100 Wind-Driven Rein Test. <br /> Benefits of Concentric Loading 1200 <br /> a1000�unFoon <br /> Traditional solar attachments have a — <br /> horizontal offset between the rail and lag 800, aFI.hFoa <br /> V if'Laat�na Comp.11lor <br /> bolt,which introduces leverage on the lag o. 600' <br /> bolt and decreases uplift capacity. t5 <br /> aoo <br /> �Y Low-cool Compallror <br /> FlashFoot2 is the only product to align the 200 <br /> rail and lag bolt.This concentric loading <br /> design results in a stronger attachment for o 1 z a <br /> ' the system. Rail-to-Lag Offset(In) <br /> Testing&Certification <br /> Structural Certification <br /> Designed and Certified for Compliance with the International Building Code&ASCE/SEI-7. <br /> g4wo Socket Size <br /> Ap 9ttm-design lag bolt allows I I I' Water Seal Ratings <br /> )Kbltbinstall FlashFoot2 with Water Sealing Tested to UL 441 Section 27"Rain Test"and TAS 100.95"Wind Driven Rain Test"by Intertek. <br /> t1%We 7/16"socket size <br /> txdtlmt other Flush Mount Ratings applicable for composition shingle roofs having slopes between 2:12 and 12:12. <br /> S'9tan components. <br /> Water Shedding Design UL 2703 <br /> An elevated platform diverts water <br /> away from the water seal. Conforms to UL 2703 Mechanical and Bonding Requirements.See Flush Mount Install Manual for full ratings. <br /> ®fir® <br />
The URL can be used to link to this page
Your browser does not support the video tag.