My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-1191
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-1191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2022 2:40:52 PM
Creation date
6/1/2022 8:58:30 AM
Metadata
Fields
Template:
Building Department
Company Name
DR HORTON
Building Department - Doc Type
Permit
Permit #
20-1191
Building Department - Name
DR HORTON
Address
7053 STEER BLADE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Envelope Leakage Test Report (Blower Door Test) <br /> Residential Prescriptive, Performance or ERI Method Compliance <br /> 2017 Florida Building Code, Energy Conservation, 6th Edition <br /> Jurisdiction: Permit#: <br /> t <br /> Builder: DR Horton Community: Lot: 4/14 <br /> Address: <br /> City: Zephyrhills State: FL Zip: <br /> 9•Ahbk T <br /> *- <br /> ull etest O- wpdfl W-io� 'W <br /> C-lima <br /> 1: <br /> ;-ithe-'.�bld.bted-i --4 5'��1714,�O-Q'- '17 <br /> x 60 26375 Method for calculating building volume: <br /> CFM(50) Building Volume ACH(50) 0 Retrieved from architectural plans <br /> FIPASS 40 Code software calculated <br /> When ACH(50) is less than 3,Mechanical Ventilation installation 0 Field measured and calculated <br /> L must be verified by building department. <br /> R402.4.1.2 Testing.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.(50 Pascals) <br /> Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statues.or individuals licensed as set forth in Section <br /> 489.105(3)(f),(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and <br /> provided to thecode official,Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. <br /> During testing: <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration <br /> control measures. <br /> 2.Dampers including exhaust,intake,makeup air,back draft and flue dampers shall be closed,but not sealed beyond intended infiltration control <br /> measures. <br /> 3.Interior doors,if installed at the time of the test,shall be open. <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off. <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. <br /> 7 <br /> TO 6-1 <br /> Company Name: Phone: <br /> I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code <br /> Energy Conservation requirements according to the compliance method selected above. <br /> Signature of Tester: Date of Test: <br /> Printed Name of Tester: <br /> License/Certification#: Issuing Authority: <br /> 11/20/2020 2:50:46 PM EnergyGauge@ USA 6.0.04(Rev. 1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.