Laserfiche WebLink
FORM R405-2017 <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br /> Florida Department of Business and Professional Regulation - Residential Performance Method <br /> Project Name: Ca den 2795 E ev F w Multi Gen Builder Name: DR Horton / <br /> Street: C7�� 1r`��� -`1�f Permit Office: :4q q ✓�[S <br /> City,State,Zip: Zephyrhills,FL, I �� Permit Number: ��fJ <br /> Owner: Jurisdiction: 0 M&D <br /> Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2) <br /> 1. New construction or existing New(From Plans) 9. Wall Types(2331.8 sqft.) Insulation Area <br /> 2. Single family or multiple family Single-family a.Concrete Block-Int Insul, Exterior .R=4.1 1956.90 ftz <br /> b.Frame-Wood,Adjacent R=13.0- 374.89 ftz <br /> 3. Number of units,if multiple family 1 c.N/A R= ftz <br /> 4..Number of Bedrooms 4 d.N/A R= ftz <br /> 5..Is.this a worst case? No 10.Ceiling Types (3024.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 .2836.00 ftz <br /> 6. Conditioned floor area above grade(ftz) 2836 b.Knee Wall(Vented) R=19.0 188.00 ftz <br /> Conditioned floor area below grade(ftz) 0 c.N/A R= ftz <br /> 11. Ducts R ftz <br /> 7. Windows(330.0 sqft.) Description Area a.Sup:Attic,Ret:Attic,AH:Main 6 529- <br /> a. U-Factor: Dbl,U=0.34 258.00 ftz <br /> SHGC: SHGC=0.31 <br /> b. U-Factor: Dbl,U=0.55 72.00 ftz 12.Cooling systems kBtu/hr Efficiency <br /> SHGC: SHGC=0.34 a.Central Unit 41.5 SEER:15.00 <br /> c. U-Factor: N/A ftz <br /> SHGC: 13.Heating systems kBtu/hr Efficiency <br /> d. U-Factor: N/A ftz a.Electric Heat Pump 42.0 HSPF:8.50 <br /> SHGC: <br /> Area Weighted Average Overhang Depth: 4.214 ft. <br /> Area Weighted Average SHGC: 0.317 14. Hot water systems <br /> 8. Floor Types (2836.0 sqft.) Insulation Area a. Electric Cap:50 gallons- EF:0.950 <br /> a.Slab-On-Grade Edge Insulation R=0.0 2836.00 ftz b. Conservation features <br /> b.N/A R= ftz None <br /> c.N/A R= ftz 15.Credits. Pstat <br /> Glass/Floor Area: 0.116 Total Proposed Modified Loads: 86.70 PASS <br /> Total Baseline Loads: 87.48 <br /> I hereby certify that the plans and specifications covered by Review of the plans and 4-VSE SpgT <br /> this calculation are in compliance with the Florida Energy specifications covered by this <br /> Code. calculation indicates compliance �,,, '�' <br /> with the Florida Energy Code. N rrr,,� <br /> PREPARED BY: Before construction is completed a � O <br /> DATE: a-2o-2o this building will be inspected for <br /> compliance with Section 553.908 <br /> I hereby certify that this building,as designed, is in compliance Florida Statutes. <br /> with the Florida Energy Code. CAD E <br /> OWNER/AGENT: BUILDING OFFICIAL: <br /> DATE: DATE: <br /> - Compliance requires certification by the air handier unit manufacturer that the air handler enclosure qualifies as <br /> certified factory-sealed in accordance with R403.3.2.1. <br /> -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an <br /> envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2). <br /> 11/20/2020 2:44 PM EnergyGaugeO USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 4 <br />