Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 20167 N.E.-C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least.10 <br /> feet around the structure. <br /> 25-. R403.5.3Hot water pipe insulation. <br /> Insulation for hot:water pipe with a minimum thermal resistance (R-value) of R-3.shall-be applied to the <br /> following: <br /> Piping v,inch (19.1 mm)and larger-in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space.. . <br /> Piping from the water-heater to a distribution manifold:. <br /> Piping.located under.a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems-. <br /> 25.Blower.door test shall be provided before C.O: <br /> 26.A copy of the energy cacls shaft be with permit at all times. <br /> '27.. Copy of final insulatioiz:report shall-be provided with permit before final <br /> 28. No,fence,pool or'screen enclosure Is issued with his pernift.' <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way: <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />