Laserfiche WebLink
23.Tamper-Resistant.Receptacles in accordariee with 406.11 ofthe 2016 N.E.0 <br /> 24. In accordancewith the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.pipe-insulation <br /> Insulation for_hot_Water pipe-with-a minimum thermal resistance,(R-value):of-R-3 shall be applied to the <br /> followin <br /> g:.. <br /> Piping 31;inch (19.1,mm)and larger:in nominal diameter. . <br /> Piping:serving more than:one dwelling unit: <br /> Piping located outside the conditioned space:. <br /> Piping from the water'heater to.a distribution manifold. <br /> Piping.located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blower;door test shall be pridAded.before C.O.: <br /> 26. A copy of the energy eacls shall be.with uermit at all times.. <br /> 27., Copy of final insulation ie,i6i4 shall-be provided with permit before rival <br /> 28..No fence,pool or sereen enclosure''is issued with ahis permit.' <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-.Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C. National Electric.Code(2016) <br />