Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot Water.pipe insulation. <br /> Insulation for hot,water pipe with a minimum thermal resistance (R-value) of R-3 shall.tie applied to the <br /> followin <br /> Piping.,/, inch (1bJ mm)and larger in.:nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the.water heater to:a distribution manifold:. <br /> Piping located under.a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation-systems. <br /> 25:Blower door test shall be provided before C.O: <br /> 26. A copy ofthe energy:cacls shall be with''permit at all times <br /> 27. Cone of r1nal.insulation-report shall-be provided ivith permit before fna� <br /> 28. No fence, pool or screen enclosure :is issued with:this permit- <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-.Americans with Disabilities Act N.E.C.-National Electric Code(2016). <br />