Laserfiche WebLink
21 Tamper-Resistant Receptacles in accordance with 406:11 of the 2016 N.E.0 <br /> 24. fn accordance with the Land Development Code,lots shall.be sodded before finial at least 10 <br /> feet around the structure. <br /> 25-. R403.5.3Hot Water.pipe insulation <br /> Insulation for hot,water pipe With a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping.3/<inch (19.1 mm) and larger in:nominal diameter.- <br /> Piping;serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a4istribution manifold: <br /> Piping.located under,a floor slab. <br /> B'uriied in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower.,door test shall be provided before C.O. <br /> 26.A cony of the energy cacls shall be with Oernnit at all times. <br /> 27. Copy of final igoortshaU be provided with Permit before fnaL <br /> 28. No fence,pool or'screen enclosure :is issued with:this permit <br /> RRE:-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />