My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-1242
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-1242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2022 3:32:57 PM
Creation date
6/1/2022 9:28:24 AM
Metadata
Fields
Template:
Building Department
Company Name
ANR GROUP & TRUST LLC
Building Department - Doc Type
Permit
Permit #
20-1242
Building Department - Name
ANR GROUP & TRUST LLC
Address
5525 10TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> . . <br /> BUILDING ������`N��! ���: ������� <br /> ����m�'N~�� <br /> = � Date: 02/01/3017 <br /> APerfact Solution imEvery Drop Report No: 47OO <br /> � Certificate vr Authorization:zys7o <br /> Installation: 1. Approved anchor types and substrates areas follows: <br /> A. For two by(2X)wood frame substrate, use#8 Wood Screws of sufficient length to <br /> achieve minimum embedment uf1.S" into wood framing. <br /> B. For two by(ZD)wood frame substrate,use 10d common nails or11 gauge roofing nails <br /> of sufficient length to achieve minimum embedment of 2.0" into wood framing. <br /> C. For steel stud frame substrate, use#8TEK Screw of sufficient length to achieve 3threads <br /> of minimum engagement. <br /> Refer to Installation Instructions (PGW042)for anchor spacing and more details of the installation <br /> requirements. <br /> Design Pressure: <br /> Design Pressures <br /> Hermes F. Nunero, P.E. <br /> _ Florida No.73778 <br /> Page 4of4 <br /> ^ Hermes F.wurem.p.e. <br /> Florida�E.No.rmr <br /> Page 4vf* <br />
The URL can be used to link to this page
Your browser does not support the video tag.