Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.-C <br /> 24. In accordance with the Land Development Code,lots..shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.31-lot water pipe insulation <br /> Insulation for'hot water'pipe with a minimum thermal resistance (R-value) of R-3.shall be applied to the <br /> following: <br /> Piping 3/: inch (19:1 mm)and larger in..nominal diameter: <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space.. <br /> Piping from the water'heater to a distribution manifold:. <br /> Piping.located under.a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided.before C.O; <br /> 26. A copy ofthe enerQy.cacls shall be with permit at all times. <br /> 27. Copta offnalinsulation Yeport-shall be provided with permit before riniA <br /> 28..No fence. pool or screen enclosure as issued with:this permit` <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with-Disabilities Act N.E.C.-National Electric.Code (2016) . <br />