NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions",
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a.misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractors) sign
<br /> portions'of the "contractor:Block" of this application for which they will be responsible. .If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County. ;
<br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact;Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in existing buildings,.or expansion of existing buildings, as specified.in Pasco County Ordinance.number 89-07 and
<br /> 90-07, as amended.. The undersigned also understands, that such fees, as may be due, will be identified-at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br /> fees'are"due, they must be,paid prior to permit,issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION,LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the "Florida' Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner" prior to commencement.
<br /> CONTRACTOR'SIOWNER'S AFFIDAVIT: I certify that all the information in this application. is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a:, permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed.to meet standards of all laws regulating
<br /> construction, County and.'City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the.regulations of other government agencies may apply to the intended work; and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, Water/Wastewater Treatment.
<br /> Southwest Florida Water Management District=Wells, Cypress Bayheads; Wetland Areas, Altering
<br /> Watercourses:,
<br /> Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> Department of Health & Rehabilitative Services/Environmental- Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> US Environmental Protection Agency-Asbestos abatement.
<br /> Federal Aviation Authority-Runways.
<br /> understand that the following restrictions apply to the use of fill:•
<br /> .*Use of fill is not allowed in Flood Zone W"unless expressly permitted.
<br /> If the.fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I'certify that fill will be used only to fill the area within the stem wall.
<br /> If.fill material.is to be used in any area, .I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use.of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions;of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform-the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to.violatei cancel, alter, or
<br /> set aside any provisions.of the technical codes; nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become.invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension
<br /> may be requested,.in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If,work ceases for ninety(90)consecutive days, thejob is considered abandoned.
<br /> WARNING TO OWNER:::YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY-RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.--
<br /> FLORIDA JURAT(F. 11.7.03) 1291,
<br /> O ER OR_AGEN,.' y� W CONTRACTOR==�Suli cri ed'and swggrm�� ��to gffrmed)bet6re(me this Sub cy' ed and swop to itr��d be ore r this
<br /> t � L000cl` d i4[1U4' (V�q W�V
<br /> 4• d
<br /> Who is/are personally own to me or has/have produced Who is are personally k wn to me oe has/have produced
<br /> as identification. as identification.
<br /> Notary Public / Notary Public
<br /> ;io11�YP� ANNAMARIELYN
<br /> Commission No. :�PaYP�''. ANNAM tIE LYNC
<br /> H-TERRY Commission No. ^'s No CN•T RR
<br /> o.ary u c faFlo
<br /> Commisslon N GG 9382gZ'da
<br /> Commission M G °^ "' My comm.
<br /> 4
<br /> Name of Notary ed; Name of Nota Wet final Notary Assn.
<br /> ry P p8.ft� a canal
<br />
|