ZEPHYRHILLS FIRE DEPARTMENT
<br /> 38410 6th Ave Zephyrhills, FL 33542
<br /> FIRE'SERVICE USER FEES increase 1/1/2018
<br /> Occupancy.No.:
<br /> Plan No;: S� 3�� �Q.c•c�~�' Contractor: C191
<br /> Business.Name: a milling Address:
<br /> Business-Address: �Q 0
<br /> Business'Phone.No.: Billing,-Phone No.:
<br /> Business'Fax No.: Billing Fax No.:
<br /> Contact:' Contact:
<br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE
<br /> Annual-
<br /> Education,healthcare,De
<br /> tentionBCorrectional Public
<br /> Assembly,Business, schools,
<br /> Storage,Mercantile and Churches
<br /> Site Plan N/C industrial. no charge Sprinkler $50
<br /> `Multi-Family/Commercial :03 sf up to 800 sq,ft $ 24.00 Standpipes $50
<br /> (Minimum.Charge$24.00 801-1,500-sq ft $ 34.52 Fire Pump $50
<br /> a°Plan Revisions DBL. 1,501-2,500 sq ft $ 60.02 Hoods $50
<br /> Z501-3,500 sq ft $ 90.02 Fire Alarm $50
<br /> SPRINKLER SYSTEMS 3,501-5,000 sq ft $ 127.52 LP Gas $50
<br /> 80-.25-Heads $50• ` :5,501-7,500.sq ft $ .187.52 ..Natural Gas $50
<br /> ;MplussHeads $100 ;7,501-10;000 sq ft $ 262.52 FuelTanks- pertank $50
<br /> STANDPIPE.SYSTEM i10;001=15,000 sq ft $ 375.02 Sparklers $100
<br /> l Per Riser $50 15,001-20,000 sq ft $ 525.02 Fire-Works $500
<br /> FIRE-'PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation; $25
<br /> Per.Rump $100 i30,001-40,000 sq ft $ 1,050.02 Controlled,Bum(15da $100
<br /> FIRE.ALARM SYSTEM 40,001=60,000 sq ft $ 1,500.02 Hood/Duct $50
<br /> 0-25-Devices $50 60,001-80,000 sq ft $ 2,100.02 Place of Assembly $50 Annual
<br /> 80,001-($2.100'02)per
<br /> .26 plus;Devices $100 Tea add 1"000sq ft $ 0.06 Fire Protection $25
<br /> S.UPPRESSIOWSY.$TEMS. (Business'closed'until Flammable Application $50 Annual
<br /> Wet. •_ $50 ':violations corrected) Waste Tire-Storage $50 Annual
<br /> Dry $50 ',SPRINKLER SYSTEMS Generator<KW $100
<br /> CO2 $50,J!,.Accqptance
<br /> ?Hydro Undergrounds $45 Generator>30 KW $100
<br /> Other $56 JHydrostaticTest $65 per system Bio-Hazard Waste $100 Annual
<br /> KITCHEN EXHAUST Test $45 per system Fumigation Tenting $50
<br /> Hood/Ducts $50 Hydrant'Flow $75 Torch-Pot/Applied $50
<br /> OTHER Haz.Materials $50 Annual
<br /> LP:Installation per tank $50 FIRE ALARM SYSTEM
<br /> `Fuel Tank1ritallation .$50.; ;System-Acceptance' $50
<br /> B
<br /> (Pe066hk)' $50 Di.ecall Acceptance $50
<br /> Natural Gas Installation $50 OTHER
<br /> (Per:Systell) F,n.Wali/Smoke Wall $15 perwall
<br /> Spray-Booth $50 LP•Gas $25 per lank
<br /> BNatural
<br /> Gas. $25 per system
<br /> Tent 10'xl0'or greater $15 per tent
<br /> *Ire Pump $45
<br /> ,-,,fire Suppression $30
<br /> System Acceptance
<br /> Exhaust Hood/Duct $30
<br /> Re-Inspection DBL
<br /> (other than annual)
<br /> Inspection scheduled DBL
<br /> and cancelled less than
<br /> 24 hours
<br /> Construction Insp. N/C
<br /> 'Emergency Vehicle Acce $50
<br /> PLANSTOTAL F<7e)l INSPECTION TOTAL s'O PERMIT TOTAL �O
<br /> GRAND TOTAL fj ao
<br /> Comments:
<br /> Date: Inspector:
<br /> see.back
<br /> nih
<br /> E�.'".,"i�2�»..w+:a"""'.,,CisiY9'ta'.;tl'«Y-"��..-."�-`°�"�"•�+n=.T'v'�`.-'�:atsg'.Svc,.'Sa.2rsRaa3cF„x�AJ�«.^uttTci�i�' +aSPu�Xc.^.arr�n�aao-aa...r.;4�'sa..+swnv.�aszna.t.nm,-vme.s.,m.wow..e..,..u*.xr.nw..........-....................»...
<br />
|