Laserfiche WebLink
21 Tamper- Resistant.Receptacles in accordance with 406.116 fthe- 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.31HIot.w6ter,'pipe insulation <br /> Insulation for hot:water. pipe with a minimum thermal resistance (R-value) of R-3.shall.be applied to the <br /> following: <br /> Piping j. inch (1.9.1 mm)and larger,in.nominal diameter. <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the'conditioned space: <br /> Piping from the water Beater to a distribution manifold:. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation'systems other than demand recirculation systems. <br /> 25.Blower.door test shall be provided.before C.O. <br /> 26.A copy of the enerky cacls shall be with permit at all times. <br /> 27. Copy of final insulation,report shall be provided with peimit'befpre flnah <br /> 28. No fence.-pool or-'sereen enclosure -is-issued witkthis permit <br /> F.F.E.-Finished Floor Elevation <br /> RB.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-.Americans with Disabilities'Act N.E.C.-National Electric.Code(2016) <br />