Laserfiche WebLink
23. Tamper- Res stant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. .ii accordance with the Larid Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25:.R403.5.3Hot water pipe insulation. <br /> Insuiation for hot water-pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3j; inch (19.1 mm) and larger in nominal diameter., <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to.a distribution manifold:. <br /> Piping.located under a floor slab. <br /> Buried in piping. . <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before' C.O. <br /> 26. A copy of the eneav cacls shall be with permit at all times- <br /> 27. Cony of final insulation repoet shall be provided with permit before final <br /> 28.No fenee, pool or screen enclosure .is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />