Laserfiche WebLink
OR BK 11052 PG 236 Page 12 of 16 <br />(6) Construction of drainage facilities and mitigation areas in conjunction with <br />roadway construction; <br />(7) Design, purchase and installation of traffic signalization; <br />(8) Construction of roads, curbs, medians and shoulders; <br />(9) Relocating utilities to accommodate roadway construction; <br />(10) Any other improvements or amenities typically associated with the <br />construction of transportation facilities, including sidewalks and multi -use paths. <br />(C) Park impact fee funds may be expended for, but are not limited to, the following types <br />of Eligible Improvements: <br />(1) Planning, design, and construction plan preparation for park improvements; <br />(2) Permitting and fees; <br />(3) Park land acquisition, including any costs of acquisition or condemnation; <br />(4) Relocation of utilities required by the construction of improvements and <br />additions to park facilities; <br />(5) Landscaping and site preparation, including demucking, filling to flood criteria <br />and compaction; <br />(6) Construction management and inspection; <br />(7) Surveying, soils and materials testing and removal of hazardous and solid <br />waste materials; <br />(8) Acquisition of capital equipment for park services; and <br />(9) Installation of recreational amenities and other improvements associated with <br />parks and recreation facilities development or expansion. <br />(10) Purchase of vehicles or other capital equipment for park services. <br />(D) Public safety impact fee funds may be expended for, but are not limited to, the <br />following types of Eligible Improvements: <br />(1) Planning, design, and construction plan preparation; <br />(2) Permitting and fees; <br />(3) Land and materials acquisition, including any costs of acquisition or <br />condemnation; <br />(4) Relocation of utilities required by the construction of improvements and <br />additions to public safety facilities; <br />(5) Design and construction of new drainage facilities required by the construction <br />of improvements and additions to public safety facilities; <br />(6) Landscaping and site preparation, including demucking, filling to flood criteria <br />and compaction; <br />(7) Construction management and inspection; <br />Page 12 of 16 <br />30996332v1 <br />