In
<br />I
<br />4
<br />i
<br />ABBREVIATIONS
<br />A
<br />AMPERES
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />AHU
<br />AIR HANDLING UNIT
<br />BHP
<br />BRAKE HORSEPOWER
<br />BTUH
<br />BRITISH THERMAL UNIT PER HOUR
<br />CFM
<br />CUBIC FEET PER MINUTE
<br />CLG
<br />CEILING
<br />CD
<br />CONDENSATE DRAIN
<br />CU
<br />CONDENSING UNIT
<br />DB
<br />DRY BULB
<br />DN
<br />DOWN
<br />DX
<br />DIRECT EXPANSION
<br />EA
<br />EXHAUST AIR
<br />EAT
<br />ENTERING AIR TEMPERATURE
<br />EF
<br />EXHAUST FAN
<br />EL
<br />ELEVATION
<br />EXH
<br />EXHAUST
<br />EQUIP
<br />EQUIPMENT
<br />ESP
<br />EXTERNAL STATIC PRESSURE
<br />FB
<br />FILTER BOX
<br />FD
<br />FIRE DAMPER
<br />FLEX
<br />FLEXIBLE
<br />FLR OR FL
<br />FLOOR
<br />FPI
<br />FINS PER INCH
<br />FPM
<br />FEET PER MINUTE
<br />GALV
<br />GALVANIZED
<br />HP
<br />HEAT PUMP or HORSEPOWER
<br />KW
<br />KILOWATT
<br />LEIS
<br />POUNDS
<br />MAX
<br />MAXIMUM
<br />MBH
<br />THOUSAND BTU/H
<br />MIN
<br />MINIMUM
<br />OA
<br />OUTSIDE AIR
<br />RA
<br />RETURN AIR AND/OR ROOM AIR
<br />RTU
<br />ROOFTOP UNIT
<br />SA
<br />SUPPLY AIR
<br />TEMP
<br />TEMPERATURE
<br />TYP
<br />TYPICAL
<br />UC
<br />UNDERCUT
<br />VD
<br />MANUAL VOLUME DAMPER
<br />V
<br />VOLTS
<br />WB
<br />WET BULB
<br />0
<br />ROUND
<br />OBD
<br />OPPOSED BLADE DAMPER
<br />SO FT
<br />SQUARE FEET
<br />TAD
<br />TRANSFER AIR DUCT
<br />TAG
<br />TRANSFER AIR GRILLE
<br />NOT ALL ABBREVIATIONS MAY BE USED
<br />GENERAL SYMBOLS
<br />PLAN OR DETAIL NO..
<br />SHEET NUMBER
<br />O
<br />KEYED NOTE TO PLAN
<br />QREVISION
<br />NUMBER
<br />NORTH ARROW
<br />MECHANICAL SYMBOLS LEGEND
<br />®
<br />CEILING SUPPLY DIFFUSER
<br />CEILING RETURN GRILLE
<br />®
<br />CEILING EXHAUST GRILLE
<br />CEILING MOUNTED CENTRIFUGAL EXHAUST FAN
<br />ED
<br />IN -LINE MOUNTED CENTRIFUGAL FAN
<br />WALL
<br />DUCT
<br />i_p` r
<br />DYNAMIC FIRE DAMPER
<br />STYLE 'B' FIRE DAMPER
<br />STYLE 'CR' FIRE DAMPER FOR ROUND DUCTS
<br />ALL
<br />DUC
<br />DYNAMIC SMOKE DAMPER
<br />ALL
<br />DUCT
<br />COMBINATION DYNAMIC FIRE/SMOKE DAMPER
<br />SD
<br />DUCT SMOKE DETECTOR
<br />RETURN/EXHAUST DUCT TURNING DOWN
<br />RETURN/EXHAUST DUCT TURNING UP
<br />Xi
<br />SUPPLY DUCT TURNING DOWN
<br />SUPPLY DUCT TURNING UP
<br />EXISTING DUCT
<br />TRANSFER OPENING IN WALL
<br />LIC
<br />3/4" UNDERCUT BELOW DOOR
<br />RADIANT DAMPER (RD)
<br />CONNECT TO EXISTING
<br />E-
<br />SIDE WALL SUPPLY GRILLE
<br />-4----
<br />II
<br />SIDE WALL RETURN GRILLE
<br />OTHERMOSTAT
<br />R
<br />REFRIGERANT PIPING (LINE SET)
<br />C
<br />CONDENSATE DRAIN PIPING
<br />!0
<br />PIPE TURNING UP
<br />PIPE TURNING DOWN
<br />a
<br />2 POSITION MOTORIZED DAMPER
<br />MANUAL VOLUME DAMPER
<br />NOT ALL SYMBOLS MAY BE USED
<br />GENERAL NOTES
<br />1. IN THE PREPARATION OF THESE PLANS, THE ENGINEER HAS USED
<br />CERTAIN ABBREVIATIONS, CONVENTIONS, AND SYMBOLS, THE
<br />MEANING OF WHICH ARE ILLUSTRATED AND EXPLAINED WITHIN THE
<br />LEGEND.
<br />2. PLANS ARE DIAGRAMMATIC ONLY. THEY ARE INTENDED TO INDICATE
<br />CAPACITY, SIZE, LOCATION, DIRECTION, AND GENERAL
<br />ARRANGEMENT, BUT NOT EXACT DETAILS OF CONSTRUCTION. THE
<br />FACT THAT ONLY CERTAIN FEATURES OF THE INSTALLATION ARE
<br />INDICATED MUST NOT BE TAKEN TO MEAN THAT OTHER FEATURES
<br />WILL NOT BE REQUIRED.
<br />3. COORDINATE WITH THE OTHER TRADES TO INSURE THAT EACH
<br />TRADE SHALL HAVE SUFFICIENT SPACE TO INSTALL THEIR
<br />EQUIPMENT (DUCTWORK, PIPING, ELECTRICAL WORK, ETC.)
<br />4. IN GENERAL, ALL PIPING AND DUCTWORK SHALL BE RUN IN THE
<br />CEILING SPACE UNLESS NOTED OR INDICATED OTHERWISE.
<br />5. VERIFY ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND FIELD
<br />DIMENSIONS.
<br />6. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE
<br />DIMENSIONS.
<br />7. ALL RISES AND DROPS IN PIPING AND DUCTWORK MAY NOT
<br />NECESSARILY HAVE BEEN SHOWN. CONTRACTOR TO VERIFY.
<br />8. PROVIDE ALL STRUCTURAL MEMBERS, SUPPORT BRACKETS,
<br />FLASHING, HARDWARE, ETC. REQUIRED TO INSTALL A COMPLETE
<br />SYSTEM.
<br />9. MOUNT ALL THERMOSTATS 4 FEET ABOVE FINISHED FLOOR,
<br />UNLESS OTHERWISE NOTED.
<br />MECHANICAL SPECIFICATIONS
<br />1.
<br />SCOPE OF WORK SHALL INCLUDE ALL MATERIALS, EQUIPMENT
<br />12.
<br />PROVIDE ACCESS DOORS AS NECESSARY FOR ACCESS TO
<br />20.
<br />CONTRACTOR SHALL OBTAIN SERVICES OF A TEST AND
<br />AND LABOR NECESSARY FOR A COMPLETE AND PROPERLY
<br />CONCEALED VALVES, CLEANOUTS, UNIONS, EXPANSION JOINTS,
<br />BALANCE AGENCY TO TEST AND BALANCE ALL AIR AND
<br />FUNCTIONING INSTALLATION IN ACCORDANCE WITH LOCAL AND
<br />DAMPERS, COILS, JUNCTION BOXES, ETC., WHERE NO OTHER
<br />HYDRONIC SYSTEMS. TESTING AND BALANCING SHALL BE
<br />STATE CODES, AND CONTRACT DRAWINGS AND SPECIFICATIONS.
<br />MEANS OF ACCESS IS SHOWN OR SPECIFIED.
<br />PERFORMED IN COMPLETE ACCORDANCE WIT THE LATEST
<br />EDITION OF THE AABC STANDARDS OR LATEST EDITION OF
<br />2.
<br />CONTRACTOR SHALL VISIT THE SITE AND OBSERVE ALL EXISTING
<br />13.
<br />CONTRACTOR SHALL SET IN; POSITION ALL SLEEVES AND
<br />NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND
<br />LOCAL CONDITIONS WHICH WOULD AFFECT WORK UNDER THIS
<br />INSERTS REQUIRED IN WALLS, PARTITIONS, CEILINGS, OR
<br />BALANCING. CONTRACTOR SHALL SUBMIT ANAL TAB REPORT AS
<br />CONTRACT. CONTRACTOR SHALL EXAMINE ALL PLANS AND
<br />FLOORS. CONTRACTOR SHALL DO ALL CUTTING AND PATCHING
<br />PART OF 0&M MANUAL.
<br />SPECIFICATIONS FOR THIS PROJECT AND CONSULT THEM FOR
<br />OF EXISTING AND/OR NEW BUILDING MATERIALS REQUIRED FOR
<br />INSTRUCTIONS PERTAINING TO WORK OF THIS SECTION.
<br />INSTALLATION OF WORK HEREIN SPECIFIED.
<br />21.
<br />LOW PRESSURE DUCTWORK SHALL BE CONSTRUCTED OF
<br />GALVANIZED SHEET STEEL AND SHALL CONFORM TO THE
<br />3.
<br />CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND
<br />14.
<br />CONTRACTOR SHALL AT ALL TIMES KEEP PREMISES FREE FROM
<br />LATEST EDITION OF THE SMACNA "HVAC DUCT CONSTRUCTION
<br />INSPECTIONS REQUIRED PERTAINING TO WORK UNDER THIS
<br />ACCUMULATIONS OF WASTE . MATERIAL. OR RUBBISH GENERATED
<br />STANDARDS".
<br />CONTRACT AND PAY ALL CHARGES INCIDENTAL THERETO.
<br />BY WORK UNDER THIS CONTRACT. CONTRACTOR SHALL LEAVE
<br />THE PREMISES IN A CLEAN, ORDERLY AND ACCEPTABLE
<br />22.
<br />FLEXIBLE DUCT SHALL CONSIST OF A ZINC COATED SPRING
<br />4.
<br />FURNISH AND INSTALL MECHANICAL SYSTEMS TO MEET ALL
<br />CONDITION.
<br />STEEL HELIX PERMANENTLY BONDED TO A FULL INTERIOR LINER.
<br />CURRENT REQUIREMENTS OF NATIONAL, STATE AND MUNICIPAL
<br />DUCT SHALL HAVE A MINIMUM R-VALUE OF 6.0.
<br />CODES, RULES REGULATIONS, LAWS AND STANDARDS AS THEY
<br />15.
<br />ALL EXCAVATION, BACKFILLING, COMPACTION, TESTING, ETC.
<br />ARE ADOPTED BY THE GOVERNING AGENCY AND AS THEY MAY
<br />REQUIRED FOR THE INSTALLATION OF UNDERGROUND PIPING
<br />23.
<br />PROVIDE ALL NECESSARY DUCT SYSTEM ACCESSORIES TO
<br />APPLY.
<br />SHALL BE DONE BY THE MECHANICAL CONTRACTOR.
<br />ASSURE PROPER BALANCE, QUIET AND DRAFTLESS DISTRIBUTION
<br />AND CONVEYANCE, AND MINIMIZATION OF TURBULENCE, NOISE
<br />5.
<br />SUBMIT FOR REVIEW, BEFORE COMMENCING WORK, SHOP
<br />16.
<br />UPON COMPLETION OF WORK, CONTRACTOR SHALL CLEAN, OIL
<br />AND PRESSURE DROP FOR ALL SUPPLY, RETURN, EXHAUST AND
<br />DRAWINGS FOR ALL MATERIALS AND EQUIPMENT TO BE PROVIDED
<br />AND GREASE ALL FANS, MOTORS AND OTHER RUNNING
<br />VENTILATION AIR QUANTITIES INDICATED.
<br />UNDER THIS CONTRACT.
<br />EQUIPMENT AND APPARATUS WHICH HE INSTALLS AND MAKE
<br />CERTAIN ALL SUCH APPARATUS AND MECHANISMS ARE IN
<br />24.
<br />PROVIDE UL LABELED DYNAMIC FIRE DAMPERS IN ALL FIRE
<br />6.
<br />ANY DEVIATIONS BETWEEN THE CONTRACT DOCUMENTS AND THE
<br />PROPER WORKING ORDER.
<br />WALL PENETRATIONS. DAMPERS SHALL HAVE RATING TO MATCH
<br />FURNISHED EQUIPMENT MUST BE SEPARATELY ACKNOWLEDGED
<br />WALL,
<br />AND ADDITIONALLY NOTED ON THE SUBMITTAL. SUCH
<br />17.
<br />AT THE TIME OF SUBSTANTIAL COMPLETION OF WORK,
<br />DEVIATIONS AND ALL NECESSARY ADJUSTMENTS ARE THE
<br />CONTRACTOR SHALL FURNISH FOUR (4) COMPLETE PORTFOLIOS
<br />25.
<br />PROVIDE DUCT ACCESS DOORS FOR EACH MANUAL AND
<br />RESPONSIBILITY OF THE CONTRACTOR.
<br />CONTAINING SHOP DRAWINGS AND OPERATION AND
<br />MOTORIZED DAMPER; FIRE DAMPER; ELECTRIC DUCT HEATER;
<br />MAINTENANCE INSTRUCTIONS ON ALL EQUIPMENT FURNISHED
<br />AND WHERE ACCESS IS OTHERWISE NECESSARY
<br />7.
<br />MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN A NEAT
<br />UNDER THIS CONTRACT. CONTRACTOR SHALL PROVIDE A
<br />AND FIRST CLASS WORKMANLIKE MANNER CONSISTENT WITH
<br />MINIMUM OF 2-HOURS OF INSTRUCTIONS TO THE OWNER'S
<br />CURRENT INDUSTRY METHODS AND STANDARDS.
<br />PERSONNEL ON SYSTEM OPERATION, CHANGEOVER AND ROUTINE
<br />MAINTENANCE REQUIREMENTS.
<br />8.
<br />CONTRACTOR SHALL FURNISH, INSTALL AND CONNECT WITH
<br />APPROPRIATE SERVICES ALL ITEMS SHOWN ON ANY DRAWINGS
<br />18.
<br />THE CONTRACTOR SHALL MAINTAIN A SET OF DRAWINGS AT
<br />WITHOUT ADDITIONAL EXPENSE TO OWNER.
<br />THE SITE AND EACH DAY SHALL RECORD INSTALLATION OF
<br />9.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER PROTECTIVE
<br />PIPE, DUCTS, ETC. TO INSURE ACCURATE "AS -BUILT"
<br />MEASURES WHEN WORKING OVERHEAD OR IN FINISHED AREAS.
<br />DRAWINGS. CONTRACTOR SHALL PROVIDE OWNER TWO (2) SETS
<br />HE SHALL REPAIR, REPLACE OR TOUCH-UP ALL FINISHED
<br />OF AS -BUILT DRAWINGS AT COMPLETION OF PROJECT.
<br />SURFACES WHICH MAY BE DAMAGED AS A RESULT OF HIS
<br />19.
<br />THE MECHANICAL CONTRACTOR SHALL GUARANTEE EQUIPMENT
<br />OPERATIONS.
<br />AND INSTALLATION FOR A PERIOD OF ONE YEAR FROM FINAL
<br />10.
<br />ALL MATERIALS SHALL BE PROTECTED FROM THE WEATHER,
<br />ACCEPTANCE. CONTRACTOR SHALL PROVIDE NECESSARY
<br />DAMAGE, MOISTURE, DIRT, DEBRIS, ETC. DO NOT INSTALL
<br />ADJUSTMENTS AND/OR REPLACEMENTS OF ALL DEFECTIVE
<br />DAMAGED EQUIPMENT.
<br />EQUIPMENT, MATERIALS AND WORKMANSHIP WITHOUT EXPENSE
<br />TO THE OWNER.
<br />11.
<br />PROVIDE ESCUTCHEONS, FABRICATED PLATES OR COLLARS AT
<br />EACH LOCATION WHERE PIPE OR DUCT PASSES THROUGH A
<br />FINISHED SURFACE.
<br />EXHAUST FAN SCHEDULE
<br />DESIGNATION
<br />EF-1
<br />LOCATION
<br />QUANTITY
<br />BATHROOMS
<br />5
<br />TYPE
<br />CABINET
<br />- _ _ _
<br />AIRFLOW (CFM)
<br />93
<br />DRIVE TYPE
<br />EXT. STATIC (in. wg.)
<br />DIRECT
<br />0.250
<br />FAN SPEED (RPM)
<br />640
<br />MOTOR HORSEPOWER
<br />77 WATTS
<br />VOLTAGE/PHASE
<br />REMARKS
<br />120/1
<br />1, 2, 3, 4
<br />CONTROL TYPE
<br />WALL SWITCH
<br />MANUFACTURER
<br />CARNES
<br />MODEL NO.
<br />VCDD 010C
<br />_
<br />REMARKS:
<br />1. INTEGRAL BACKDRAFT DAMPER
<br />2. INTEGRAL DISCONNECT SWITCH
<br />3. PROVIDE WITH RADIATION DAMPER
<br />4. PROVIDE WITH WALL CAP; MATCH EXISTING
<br />DX SPLIT SYSTEM HEAT PUMP SCHEDULE
<br />AHU-120A / HP-120A
<br />ALL OTHER NEW
<br />UNITS
<br />&
<br />AHU-120B / HP-120B
<br />AHU's & HP's
<br />LOCATIONS
<br />DAY ROOM
<br />ALL STUDIO & MEMORY UNITS
<br />QUANTITY OF SPLIT SYSTEMS
<br />2_
<br />MANUFACTURER
<br />DAI KI N
<br />_35
<br />DAIKI N
<br />MODEL NUMBER (INDOOR UNIT)
<br />FCQ18PAVJU
<br />FDXS09LVJU
<br />MODEL NUMBER (OUTDOOR UNIT)
<br />RZQ18PVJU9
<br />RXS09LVJU
<br />INDOOR UNIT TYPE / INSTALLATION
<br />CASSETTE / ABOVE CEILING
<br />CONCEALED / ABOVE CEILING
<br />REFRIGERANT
<br />R-410A
<br />R-410A
<br />SEER
<br />17.2
<br />15.1
<br />COOLING CAPACITY (BTUH)
<br />18,000
<br />8,500
<br />SENSIBLE CAPACITY (BTUH)
<br />14,100
<br />7,130
<br />HEATING CAPACITY (BTUH)
<br />20,000
<br />10,000
<br />AIRFLOW (CFM - WET)
<br />560
<br />280
<br />INDOOR VOLTAGE/PHASE
<br />208/1
<br />208/1
<br />INDOOR UNIT MCA/MOCP
<br />0.4 / 15
<br />N/A
<br />OUTDOOR VOLTAGE/PHASE
<br />208/1
<br />208/1
<br />OUTDOOR UNIT MCA/MOCP
<br />16.5120
<br />8 / 15
<br />REMARKS
<br />1, 2, 3, 4
<br />1, 2, 3, 4
<br />REMARKS:
<br />1. ELECTRICAL TO PROVIDE DISCONNECT SWITCH FOR INDOOR AND OUTDOOR UNIT.
<br />2. PROVIDE WALL MOUNTED THERMOSTAT SIMILAR TO EXISTING THERMOSTATS.
<br />3. PROVIDE WITH CONDENSATE DRAIN PUMP.
<br />4. SIZE AND ROUTE REFRIGERANT LINES PER MANUFACTURER INSTRUCTIONS.
<br />. cVEIGH & MANGUM
<br />ENGINEERING•INC
<br />340 Interstate North Parkway, Suite 360
<br />,Atlanta - Georgia 30339
<br />Ph: (078) 213-1616 Fax: (678) 213-1617
<br />email: majl@McVeighMangum.com
<br />of Record: Farshid Yarizadeh License No.: 40287
<br />FOUSE
<br />ARCHITECTURE
<br />& INTERIORS, P.C.
<br />3201 S. Cherokee Lane Suite 340
<br />Woodstock, Georgia 30188
<br />Voice 678-391-5365
<br />Fax 678-391-5362
<br />email: rlf@fousearchitecture.com
<br />0 Copyright 2011 Fouse Architecture & Interiors, P.C.
<br />Seal:
<br />%
<br />AL E0
<br />Consultants: CIVIL ENGINEER:
<br />STRUCTURAL ENGINEER:
<br />McVeigh & Mangum Engineering Inc
<br />340 N Interstate Parkway, Suite 360
<br />Atlanta, GA 30339
<br />Contact: Chad McDonald, P.E.
<br />678.213.1616
<br />MEP ENGINEER:
<br />McVeigh & Mangum Engineering Inc
<br />340 N Interstate Parkway, Suite 360
<br />Atlanta, GA 30339
<br />Contact: Tony G. Fernandez, P.E.
<br />.678.213.1616
<br />Sheet Information:
<br />Job Number 11002
<br />Original Issue Date 08-31-2012
<br />Issue Dates:
<br />No. I ISSUE I DATE
<br />PERMIT/CONSTRUCTION 1 08-31-2012
<br />Sheet Title:
<br />MECHANICAL.
<br />LEGEND,
<br />SCHEDULES
<br />AND SPECS
<br />Sheet:
<br />M-001
<br />FOR CONSTRUCTION
<br />P4a
<br />®C77H