PLUMBING SPECIFICATIONS:
<br />PART 1 - GENERAL
<br />1.1 SUBMITTALS
<br />A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT
<br />INDICATED.
<br />PART 2 - PRODUCTS
<br />2.1 PIPING MATERIALS
<br />A. COMPLY WITH REQUIREMENTS IN "PLUMBING PIPING
<br />SCHEDULE" ARTICLE FOR APPLICATIONS OF PIPE, TUBE,
<br />AND FITTING MATERIALS, AND FOR JOINING METHODS,
<br />INSULATION, AND HANGING REQUIREMENTS FOR
<br />SPECIFIC SERVICES, SERVICE LOCATIONS, AND PIPE
<br />SIZES.
<br />2.2 VALVES
<br />A. NSF COMPLIANCE: NSF 61 FOR VALVE MATERIALS FOR
<br />POTABLE -WATER SERVICE.
<br />B. WATER SHUTOFF SERVICE: TWO-PIECE, FULL PORT,
<br />BRASS BALL VALVES WITH BRASS TRIM.
<br />C. CHECK VALVES: BRASS SILENT CHECK VALVES WITH
<br />NONMETALLIC DISC SUITABLE FOR HORIZONTAL OR
<br />VERTICAL INSTALLATION.
<br />D. FUEL GAS SHUTOFF SERVICE: TWO-PIECE, FULL PORT,
<br />BRASS BALL VALVES WITH BRASS TRIM, UL LISTED FOR
<br />GAS SERVICE.
<br />E. FUEL GAS PRESSURE REGULATORS: COMMERCIAL
<br />STYLE REGULATORS WITH INTERNAL PRESSURE RELIEF
<br />VALVES.
<br />2.3 HANGERS AND SUPPORTS
<br />A. PROVIDE HANGERS INDICATED ON DRAWINGS.
<br />B. WALL SUPPORTS
<br />1. PIPING 3" AND SMALLER: STEEL RISER CLAMP.
<br />C. VERTICAL SUPPORT: STEEL RISER CLAMP.
<br />PART 3 - EXECUTION
<br />3.1 PIPING INSTALLATION
<br />A. INSTALL ESCUTCHEONS AT EACH WALL, FLOOR, AND
<br />CEILING PENETRATION IN EXPOSED FINISHED
<br />LOCATIONS AND WITHIN CABINETS AND MILLWORK. USE
<br />DEEP PATTERN ESCUTCHEONS WHERE REQUIRED TO
<br />CONCEAL PROTRUDING PIPE FITTINGS.
<br />B. INSTALL SLEEVES FOR PIPING PENETRATIONS OF
<br />WALLS, CEILINGS, AND FLOORS.
<br />C.INSTALL SLEEVE SEALS FOR PIPING PENETRATIONS OF
<br />CONCRETE WALLS AND SLABS.
<br />D. MAKE SOLDERED JOINTS USING LEAD FREE SOLDER
<br />AND A NON-CORROSIZE, PASTE -TYPE FLUX. CORE
<br />SOLDER IS NOT PERMITTED SOLDER SHALL BE SOLID
<br />STRING OR WIRE TYPE. WHERE SOLDERED COPPER
<br />PIPING IS CONNECTED TO THREADED BRASS PIPING,
<br />USE CAST BRASS ADAPTOR.
<br />E. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT
<br />END OF EACH DAY OR WHEN WORK STOPS.
<br />F. MINIMUM SLOPE OF HORIZONTAL DRAIN PIPING SHALL
<br />BE 1/4" PER FOOT FOR PIPING 2-1/2" OR LESS, 1/8" PER
<br />FOOT FOR PIPING 3" TO 6", AND 1/16" PER FOOT FOR
<br />PIPING 8" OR LARGER.
<br />G. MAKE CHANGES IN DIRECTION IN DRAIN PIPING WITH
<br />INDIVIDUAL EIGTH BENDS AND WYES.
<br />H. QUARTER BENDS, SWEEPS, TEES, AND COMBINATION
<br />WYE & EIGTH BEND FITTINGS ARE NOT PERMITTED FOR
<br />USE ON DRAIN PIPING.
<br />I. EXTEND RIGID GAS PIPING TO EXTERIOR GAS
<br />APPLIANCES AND INSTALL SHUTOFF VALVE, DIRT LEG,
<br />AND UNION AT EACH APPLIANCE.
<br />3.2 JOINT CONSTRUCTION
<br />A. REAM ENDS OF PIPES AND TUBES AND REMOVE
<br />BURRS. BEVEL PLAIN ENDS OF STEEL PIPE.
<br />PIPING NOTES:
<br />A. PROVIDE ALL MATERIALS AND EQUIPMENT AND
<br />PERFORM ALL LABOR REQUIRED TO INSTALL
<br />COMPLETE AND OPERABLE PIPING SYSTEMS AS
<br />INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS
<br />REQUIRED BY CODE.
<br />B. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO
<br />THE CENTERLINE OF ALL PRESSURE PIPING AND TO
<br />THE INVERT OF ALL GRAVITY PIPING.
<br />C. MAINTAIN A MINIMUM OF 3'6" OF GROUND COVER
<br />OVER ALL UNDERGROUND HVAC PIPING (EDIT DEPTH
<br />OF GROUND COVER TO SUIT FROST LINE DEPTH AND
<br />PROJECT REQUIREMENTS).
<br />D. UNLESS OTHERWISE NOTED, ALL PIPING IS
<br />OVERHEAD, TIGHT TO UNDERSIDE OF STRUCTURE
<br />OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED.
<br />E. INSTALL PIPING SO THAT ALL VALVES, STRAINERS,
<br />UNIONS, TRAPS, FLANGES, AND OTHER
<br />APPURTENANCES REQUIRING ACCESS ARE
<br />ACCESSIBLE.
<br />F. ALL VALVES SHALL BE INSTALLED SO THAT VALVE
<br />REMAINS IN SERVICE WHEN EQUIPMENT OR PIPING
<br />ON EQUIPMENT SIDE OF VALVE IS REMOVED.
<br />G. ALL BALANCING VALVES AND BUTTERFLY VALVES
<br />SHALL BE PROVIDED WITH POSITION INDICATORS
<br />B. REMOVE SCALE, SLAG, DIRT, AND DEBRIS FROM INSIDE
<br />AND OUTSIDE OF PIPES, TUBES, AND FITTINGS BEFORE
<br />ASSEMBLY.
<br />C. THREADED JOINTS: THREAD PIPE WITH TAPERED PIPE
<br />THREADS ACCORDING TO ASME 61.20.1. CUT THREADS
<br />FULL AND CLEAN USING SHARP DIES. REAM THREADED
<br />PIPE ENDS TO REMOVE BURRS AND RESTORE FULL ID.
<br />JOINT PIPE FITTINGS AND VALVES AS FOLLOWS:
<br />1. APPLY APPROPRIATE TAPE OR THREAD COMPOUND
<br />TO EXTERNAL PIPE THREADS,
<br />2. DAMAGED THREADS: DO NOT USE PIPE OR FITTINGS
<br />WITH THREADS THAT ARE CORRODED OR DAMAGED.
<br />D. DISSIMILAR -MATERIAL PIPING JOINTS: MAKE JOINTS
<br />USING ADAPTERS COMPATIBLE WITH MATERIALS OF
<br />BOTH PIPING SYSTEMS.
<br />3.3 HANGERS AND SUPPORT INSTALLATION
<br />A. SUPPORT PIPES THROUGHOUT BUILDING, BOTH
<br />HORIZONTALLY AND VERTICAL IN ACCORDANCE WITH
<br />REQUIREMENTS HEREIN AND AS SHOWN ON THE
<br />DRAWINGS. DO NOT USE FASTENERS WHICH
<br />PENETRATE THE ROOF DECK.
<br />B. PROVIDE COPPER PLATED HANGERS AND SUPPORTS
<br />FOR UNINSULATED COPPER PIPING. PROVIDE PLASTIC
<br />INSERTS FOR UNINSULATED COPPER PIPING
<br />PENETRATING METAL STUDS.
<br />C. IN AREAS WITHOUT CEILINGS, SECURE INSULATION
<br />SHIELDS TO INSULATION WITH PRESSURE SENSITIVE
<br />TAPE AT EACH END OF SHIELD. INSTALL HANGERS TO
<br />PROVIDE MINIMUM Y2" CLEAR SPACE BETWEEN
<br />FINISHED COVERING AND ADJACENT WORK.
<br />E. PLACE A HANGER WITHIN ONE FOOT OF EACH
<br />HORIZONTAL ELBOW.
<br />F. SUPPORT VERTICAL PIPE RUNS AT ROOF, AT FLOOR,
<br />AND AT MAXIMUM 15-FOOT INTERVALS.
<br />G. SPACE SUPPORTS NOT MORE THAN FIVE FEET APART
<br />AT VALVES, STRAINERS OR PIPING ACCESSORIES
<br />LARGER THAN 2"
<br />H. INSTALL LATERAL BRACING WITH PIPE HANGERS AND
<br />SUPPORTS TO PREVENT SWAYING.
<br />I. INSTALL HANGERS AND SUPPORTS TO ALLOW
<br />CONTROLLED THERMAL, AND SEISMIC MOVEMENT OF
<br />PIPING SYSTEMS, TO PERMIT FREEDOM OF MOVEMENT
<br />BETWEEN PIPE ANCHORS, AND TO FACILITATE ACTION
<br />OF EXPANSION JOINTS, EXPANSION LOOPS, EXPANSION
<br />BENDS, AND SIMILAR UNITS.
<br />J. ADJUSTING
<br />1. HANGER ADJUSTMENTS: ADJUST HANGERS TO
<br />DISTRIBUTE LOADS EQUALLY ON ATTACHMENTS AND
<br />TO ACHIEVE INDICATED SLOPE OF PIPE.
<br />2. LOAD DISTRIBUTION: ADJUST HANGERS AND
<br />SUPPORTS SO THAT PIPING LIVE AND DEAD LOADS
<br />AND STRESSES FROM MOVEMENT WILL NOT BE
<br />TRANSMITTED TO CONNECTED EQUIPMENT.
<br />3. PIPE SLOPES: ADJUST HANGERS AND SUPPORTS TO
<br />PROVIDE INDICATED PIPE SLOPES AND TO NOT
<br />EXCEED MAXIMUM PIPE DEFLECTIONS ALLOWED BY
<br />ASME B31.9 FOR BUILDING SERVICES PIPING.
<br />4. TRIM EXCESS LENGTH OF CONTINUOUS - THREAD
<br />HANGER AND SUPPORT RODS TO 1-1/2".
<br />3.4 PIPE INSULATION INSTALLATION
<br />A.INSULATE FITTINGS AND VALVES WITH PERFORMED
<br />INSULATION FITTINGS WITH PVC JACKET.
<br />3.5 VALVE AND SPECIALTIES INSTALLATION
<br />A.PROVIDE DEEP SEAL P-TRAPS FOR FLOOR DRAINS AND
<br />MOP BASINS.
<br />B. FOR CLEANOUTS LOCATED IN CONCEALED PIPING,
<br />INSTALL CLEANOUT WALL ACCESS COVERS OF TYPES
<br />INDICATED, WITH FRAME AND COVER FLUSH WITH
<br />FINISHED WALL.
<br />C. PROTECT DRAINS DURING CONSTRUCTION PERIOD TO
<br />AVOID CLOGGING WITH DIRT OR DEBRIS AND TO
<br />PREVENT DAMAGE FROM TRAFFIC OR CONSTRUCTION
<br />WORK.
<br />AND MAXIMUM ADJUSTABLE STOPS (MEMORY
<br />STOPS).
<br />H. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES
<br />IN EQUIPMENT ROOMS MOUNTED GREATER THAN
<br />7'-0" ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO
<br />T-0" ABOVE FLOOR LEVEL.
<br />I. ALL VALVES (EXCEPT CONTROL VALVES) AND
<br />STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE
<br />REDUCING SIZE TO MAKE CONNECTIONS TO
<br />EQUIPMENT AND CONTROLS.
<br />J. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT
<br />EACH PIECE OF EQUIPMENT, IN BYPASSES, AND IN
<br />LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT
<br />DISASSEMBLY FOR ALTERATION AND REPAIRS.
<br />K. INSTALL ALL PIPING WITHOUT FORCING OR
<br />SPRINGING.
<br />L. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
<br />M. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND
<br />EASY OPERATION.
<br />N. ALL PIPING WORK SHALL BE COORDINATED WITH ALL
<br />TRADES INVOLVED. OFFSETS IN PIPING AROUND
<br />OBSTRUCTIONS SHALL BE PROVIDED AT NO
<br />ADDITIONAL COST TO THE OWNER.
<br />PLUMBING PIPING SCHEDULE:
<br />PIPE
<br />HANGER
<br />INSULATION
<br />SYSTEM
<br />LOCATION
<br />SIZE
<br />MATERIAL
<br />JOINTS
<br />FITTINGS
<br />SPACING (FT)
<br />THICKNESS (IN)
<br />NOTES
<br />DOMESTIC
<br />ABOVE
<br />1-1/4" AND SMALLER
<br />TYPE L HARD
<br />WROUGHT
<br />6
<br />1/2
<br />COLD WATER
<br />GRADE
<br />COPPER
<br />SOLDER
<br />COPPER
<br />�
<br />1-1/2 AND SMALLER
<br />10
<br />1/2
<br />-
<br />1-1/2" AND SMALLER
<br />HUBLESS
<br />HUBLESS
<br />HUBLESS CAST
<br />5
<br />-
<br />1,2
<br />CAST IRON
<br />IRON
<br />SANITARY
<br />1-1/2" AND SMALLER
<br />DWV HARD
<br />CAST BRONZE OR
<br />10
<br />-
<br />-
<br />SEWER
<br />ALL
<br />COPPER
<br />SOLDER
<br />WROUGHT
<br />1-1/4
<br />6
<br />-
<br />-
<br />COPPER
<br />ALL
<br />PVC SCHD 40
<br />SOLVENT
<br />DWV SOCKET
<br />4
<br />-
<br />3
<br />DWV
<br />WELD
<br />GENERAL NOTES:
<br />A. ALL PRODUCTS USED IN DOMESTIC COLD AND HOT WATER PIPING F.
<br />FOR INSULATED PIPING PROVIDE PIPE HANGER INSULATION
<br />SYSTEMS MUST BE NSF/ANSI 61 CERTIFIED AND BE LEAD FREE.
<br />SHIELD ACCORDING TO HANGER MANUFACTURER.
<br />LEAD FREE PRODUCTS MUST BE LISTED AND LABELED BY A THIRD G.
<br />FOR INSULATED PIPING PROVIDE PIPE HANGER INSULATION
<br />PARTY AS LEAD FREE SUCH THAT THE WETTED SURFACE
<br />SHIELD ACCORDING TO HANGER MANUFACTURER.
<br />MATERIALS HAVE NO MORE THAN 0.25% LEAD CONTENT. H.
<br />HANGER SPACING DOES NOT APPLY TO UNDERGROUND AND
<br />B. INSULATION TO BE FIBERGLASS, POLYMER FOAM, OR
<br />BELOW SLAB PIPING.
<br />ELASTOMERIC PREFORMED PIPE INSULATION WITH SELF SEALING I.
<br />INSULATION THICKNESS ONLY APPLIES TO DOMESTIC HOT WATER
<br />ADHESIVE LAP.
<br />FOR UNDERGROUND AND BELOW SLAB PIPING.
<br />C. DOMESTIC COLD WATER, STORM PIPING, AND CONDENSATE PIPING J.
<br />HUBLESS CAST IRON JOINTS MUST BE MADE WITH ASTM C1540
<br />FIBERGLASS INSULATION MUST HAVE VAPOR RETARDED JACKET,
<br />HEAVY DUTY SHIELDED COUPLINGS WITH CENTER STOPS.
<br />SEAL JOINTS WITH 2" WIDE PRESSURE SENSITIVE VAPOR K.
<br />PVC PIPE MUST BE SOLID WALL, FOAM CORE IS NOT PERMITTED.
<br />RETARDED TAPE. L.
<br />DO NOT USE PVC PIPING IN RETURN AIR PLENUM.
<br />D. INSULATION MUST BE INSTALLED ACCORDING TO M.
<br />DUCTILE IRON AND CAST IRON PIPING MUST HAVE POLYETHYLENE
<br />MANUFACTURER'S REQUIREMENTS.
<br />ENCASEMENT WHEN INSTALLED IN CORROSIVE SOILS, VERIFY IN
<br />E. PIPE HANGING AND SUPPORT COMPONENTS AND METHODS TO BE
<br />FIELD.
<br />IN ACCORDANCE WITH ANSI/MSS SP-58-2009.
<br />NOTES:
<br />1. AT LEAST 1 ADDITIONAL HANGER IS REQUIRED AT EACH JOINT.
<br />2. 10' HANGER SPACING IS PERMITTED ONLY IF 10' LENGTHS OF PIPE ARE USED.
<br />3. PIPE MATERIAL MAY BE USED WHERE PERMITTED BY AUTHORITY HAVING JURISDICTION.
<br />PIPE MATERIALS:
<br />CONDITION/LOCATION
<br />MATERIAL TYPE
<br />ABOVE GROUND WATER
<br />TYPE "L" COPPER
<br />BELOW GROUND WATER
<br />TYPE "K" COPPER
<br />WASTE (UNDER 2")
<br />TYPE "M" COPPER
<br />WASTE ABOVE 2")
<br />CAST IRON
<br />WASTE
<br />SCHEDULE 40 PVC PLASTIC
<br />VENT
<br />SCHEDULE 40 PVC PLASTIC
<br />VENT (UNDER 2")
<br />TYPE "M" COPPER
<br />VENT (ABOVE 2")
<br />CAST IRON
<br />SLOPE OF HORIZONTAL
<br />DRAINAGE PIPE:
<br />SIZE(INCHES)
<br />MIN. SLOPE (INCHES PER FOOT)
<br />2-1/2 OR LESS
<br />1/4
<br />3 TO 6
<br />1 /8
<br />8 OR LARGER
<br />1/16
<br />PLUMBING INSULATION NOTES:
<br />DOMESTIC COLD WATER
<br />ABOVE GRADE: LIGHT DENSITY, FIBERGLASS PIPE INSULATION. 1/2"
<br />THICK, WITH VAPOR BARRIER JACKET.
<br />DOMESTIC HOT WATER
<br />ABOVE GRADE: LIGHT DENSITY, FIBERGLASS PIPE INSULATION, 1"
<br />THICK, WITH GLASS CLOTH JACKET.
<br />AT CONTRACTOR'S OPTION FIBERGLASS SNAP ON INSULATION WITH
<br />FOAM VAPOR BARRIER MAY BE SUBSTITUTED FOR ABOVE.
<br />DOMESTIC HOT AND COLD WATER PIPING IN PIPE CHASES
<br />SHALL BE INSULATED WITH "/" THICK, 3-1/21B. DENSITY FIBERGLASS
<br />WITH ALL PURPOSE VAPOR BARRIER JACKET.
<br />EXPOSED SANITARY WASTE PIPING
<br />SHALL BE INSULATED WITH 1%" THICK,GLASS MINERAL WOOL, WITH
<br />ALL PURPOSE VAPOR BARRIER JACKET.
<br />PLUMBING FIXTURE SCHEDULE:
<br />PLAN
<br />BASIC OF
<br />CONNECTIONS
<br />MARK
<br />DESCRIPTION
<br />DESIGN
<br />TRIM
<br />CW
<br />HW
<br />W
<br />V
<br />NOTES
<br />WATER CLOSET
<br />KOHLER
<br />PRESSURE ASSISTED 1.6GPF TANK TYPE FLOOR
<br />WC
<br />(TANK TYPE
<br />HIGHLINE
<br />MOUNTED WATER CLOSET. K-3493 FOR LEFT
<br />1/2"
<br />-
<br />4"
<br />2"
<br />3
<br />FLOOR OUTLET)
<br />K-3493-0
<br />HAND LEVER LOCATION. KOHLER K-4650
<br />ELONGATED OPEN FRONT SEAT
<br />FAUCET TYPE F-A, KEENEY 570OPC DRAIN, 301PC
<br />LAVATORY (WALL
<br />KOHLER SOHO
<br />P-TRAP, TRUEBRO LAV GUARD E-Z SERIES
<br />LAV
<br />MOUNTED SINK)
<br />K-2054-0
<br />WHITE. PROVIDE ASSE 1070 THERMOSTATIC
<br />1/2"
<br />1/2"
<br />2"
<br />1-1/2"
<br />1, 2, 3, 4
<br />MIXING VALVE, SET OUTLET TEMPERATURE TO
<br />100°F.
<br />F-A
<br />LAVATORY FAUCET
<br />ZURN
<br />0.5 GPM VANDAL RESISTANT AERATOR. ADA
<br />3/8"
<br />3/8"
<br />-
<br />-
<br />3
<br />Z-7440-XL-FC
<br />COMPLIANT
<br />NOTES:
<br />1. REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHT AND EXACT MOUNTING POSITION OF FIXTURES,
<br />2. FAUCET HOLES TO MATCH FAUCET SPECIFIED.
<br />3. FIXTURE ASSEMBLY MUST BE APPROVED BY AND INSTALLED PER ADA REQUIREMENTS.
<br />4. PROVIDE INSULATION KIT ON ALL ADA FIXTURES EXPOSED SUPPLIED AND TRAP.
<br />BASIS OF DESIGN PRODUCTS ARE INDICATED FOR REFERENCE ONLY. COMPARABLE PRODUCTS WILL BE ACCEPTED PROVIDED
<br />COMPLIANCE WITH TECHNICAL SPECIFICATION REQUIREMENTS.
<br />FIXTURE UNIT LOAD VALUES:
<br />FIXTURE TYPE
<br />OCCUPANCY
<br />CONTROL
<br />L
<br />QTY.
<br />FIXTURE UNITS
<br />DRAINAGE
<br />WATER SUPPLY
<br />COLD
<br />HOT
<br />TOTAL
<br />LAVATORY
<br />PUBLIC
<br />FAUCET
<br />2
<br />1.0
<br />1.5
<br />1.5
<br />2.0
<br />WATER CLOSET (1.6GPF)
<br />PUBLIC
<br />FLUSH TANK
<br />2
<br />4.0
<br />5.0
<br />-
<br />5.0
<br />NOTES:
<br />1. DRAINAGE FIXTURE UNITS BASED ON FLORIDA PLUMBING CODE TABLE 709.1. WATER SUPPLY FIXTURE
<br />UNITS BASED ON UNIFORM PLUMBING CODE TABLE E103.3(2).
<br />2. ITEMS IN GRAY ARE EXISTING TO REMAIN OR OUT OF SCOPE OF WORK.
<br />Bank of America
<br />ADA- ZEPHYRHILLS
<br />5632 GALL BOULEVARD
<br />ZEPHYRHILLS, FL 33542
<br />SERIAL NUMAWANH. ID: FL2-019
<br />Nelco Architecture, Inc.
<br />a licensed affiliate
<br />Florida Certificate of Authorization Number: AA26000525
<br />Architect: Client Representative:
<br />Firm Name: NELSON Firm Name: 3LL
<br />Attn: Mark Schroeder Attn: David Berrios
<br />T: 404.881.1811 Tel.: 813.245.0909
<br />e-mail: mschroeder@nelsononline.com e-mail: David.Berrios@am.jll.com
<br />Engineer:
<br />Firm Name: Infinity Engineering Group, LLC.
<br />Attn: Brett Nevaril
<br />1208 E Kennedy Blvd, STE 230
<br />Tampa, FL 33602
<br />T: 813.434-4770
<br />e-mail: brett@iegroup.net
<br />Certification of Authorization #27889
<br />General Contractor:
<br />Firm Name: Spartan Contracting Corporation
<br />Attn: Scott Kramer
<br />T: 813.481.5778
<br />e-mail: skramer@spartancc.com
<br />Issue Date & Issue Description By Check
<br />1 04/23/18 Issue For Review 3P VO
<br />2 04/27/18 Issue For Permit JP VO
<br />ISeal/Signature
<br />NISIT SAPPARKHAO, P.E.
<br />FL REG. NO. 64085
<br />1`do 085
<br />o
<br />id�� .�.
<br />s
<br />" 3 S TA E OF 4U:
<br />i A,
<br />DATE
<br />IProject Name
<br />Bank Of America
<br />Zephyrh i l is
<br />Upgrade
<br />NELSON Project Number
<br />18.00358.00 / 10-65.439
<br />IDescription
<br />PLUMBING SPECIFICATIONS, NOTES, AND
<br />SCHEDULES
<br />Scale & Sheet Number
<br />AS INDICATED
<br />POOM01
<br />
|