Laserfiche WebLink
PLUMBING SPECIFICATIONS: <br />PART 1 - GENERAL <br />1.1 SUBMITTALS <br />A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT <br />INDICATED. <br />PART 2 - PRODUCTS <br />2.1 PIPING MATERIALS <br />A. COMPLY WITH REQUIREMENTS IN "PLUMBING PIPING <br />SCHEDULE" ARTICLE FOR APPLICATIONS OF PIPE, TUBE, <br />AND FITTING MATERIALS, AND FOR JOINING METHODS, <br />INSULATION, AND HANGING REQUIREMENTS FOR <br />SPECIFIC SERVICES, SERVICE LOCATIONS, AND PIPE <br />SIZES. <br />2.2 VALVES <br />A. NSF COMPLIANCE: NSF 61 FOR VALVE MATERIALS FOR <br />POTABLE -WATER SERVICE. <br />B. WATER SHUTOFF SERVICE: TWO-PIECE, FULL PORT, <br />BRASS BALL VALVES WITH BRASS TRIM. <br />C. CHECK VALVES: BRASS SILENT CHECK VALVES WITH <br />NONMETALLIC DISC SUITABLE FOR HORIZONTAL OR <br />VERTICAL INSTALLATION. <br />D. FUEL GAS SHUTOFF SERVICE: TWO-PIECE, FULL PORT, <br />BRASS BALL VALVES WITH BRASS TRIM, UL LISTED FOR <br />GAS SERVICE. <br />E. FUEL GAS PRESSURE REGULATORS: COMMERCIAL <br />STYLE REGULATORS WITH INTERNAL PRESSURE RELIEF <br />VALVES. <br />2.3 HANGERS AND SUPPORTS <br />A. PROVIDE HANGERS INDICATED ON DRAWINGS. <br />B. WALL SUPPORTS <br />1. PIPING 3" AND SMALLER: STEEL RISER CLAMP. <br />C. VERTICAL SUPPORT: STEEL RISER CLAMP. <br />PART 3 - EXECUTION <br />3.1 PIPING INSTALLATION <br />A. INSTALL ESCUTCHEONS AT EACH WALL, FLOOR, AND <br />CEILING PENETRATION IN EXPOSED FINISHED <br />LOCATIONS AND WITHIN CABINETS AND MILLWORK. USE <br />DEEP PATTERN ESCUTCHEONS WHERE REQUIRED TO <br />CONCEAL PROTRUDING PIPE FITTINGS. <br />B. INSTALL SLEEVES FOR PIPING PENETRATIONS OF <br />WALLS, CEILINGS, AND FLOORS. <br />C.INSTALL SLEEVE SEALS FOR PIPING PENETRATIONS OF <br />CONCRETE WALLS AND SLABS. <br />D. MAKE SOLDERED JOINTS USING LEAD FREE SOLDER <br />AND A NON-CORROSIZE, PASTE -TYPE FLUX. CORE <br />SOLDER IS NOT PERMITTED SOLDER SHALL BE SOLID <br />STRING OR WIRE TYPE. WHERE SOLDERED COPPER <br />PIPING IS CONNECTED TO THREADED BRASS PIPING, <br />USE CAST BRASS ADAPTOR. <br />E. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT <br />END OF EACH DAY OR WHEN WORK STOPS. <br />F. MINIMUM SLOPE OF HORIZONTAL DRAIN PIPING SHALL <br />BE 1/4" PER FOOT FOR PIPING 2-1/2" OR LESS, 1/8" PER <br />FOOT FOR PIPING 3" TO 6", AND 1/16" PER FOOT FOR <br />PIPING 8" OR LARGER. <br />G. MAKE CHANGES IN DIRECTION IN DRAIN PIPING WITH <br />INDIVIDUAL EIGTH BENDS AND WYES. <br />H. QUARTER BENDS, SWEEPS, TEES, AND COMBINATION <br />WYE & EIGTH BEND FITTINGS ARE NOT PERMITTED FOR <br />USE ON DRAIN PIPING. <br />I. EXTEND RIGID GAS PIPING TO EXTERIOR GAS <br />APPLIANCES AND INSTALL SHUTOFF VALVE, DIRT LEG, <br />AND UNION AT EACH APPLIANCE. <br />3.2 JOINT CONSTRUCTION <br />A. REAM ENDS OF PIPES AND TUBES AND REMOVE <br />BURRS. BEVEL PLAIN ENDS OF STEEL PIPE. <br />PIPING NOTES: <br />A. PROVIDE ALL MATERIALS AND EQUIPMENT AND <br />PERFORM ALL LABOR REQUIRED TO INSTALL <br />COMPLETE AND OPERABLE PIPING SYSTEMS AS <br />INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS <br />REQUIRED BY CODE. <br />B. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO <br />THE CENTERLINE OF ALL PRESSURE PIPING AND TO <br />THE INVERT OF ALL GRAVITY PIPING. <br />C. MAINTAIN A MINIMUM OF 3'6" OF GROUND COVER <br />OVER ALL UNDERGROUND HVAC PIPING (EDIT DEPTH <br />OF GROUND COVER TO SUIT FROST LINE DEPTH AND <br />PROJECT REQUIREMENTS). <br />D. UNLESS OTHERWISE NOTED, ALL PIPING IS <br />OVERHEAD, TIGHT TO UNDERSIDE OF STRUCTURE <br />OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED. <br />E. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, <br />UNIONS, TRAPS, FLANGES, AND OTHER <br />APPURTENANCES REQUIRING ACCESS ARE <br />ACCESSIBLE. <br />F. ALL VALVES SHALL BE INSTALLED SO THAT VALVE <br />REMAINS IN SERVICE WHEN EQUIPMENT OR PIPING <br />ON EQUIPMENT SIDE OF VALVE IS REMOVED. <br />G. ALL BALANCING VALVES AND BUTTERFLY VALVES <br />SHALL BE PROVIDED WITH POSITION INDICATORS <br />B. REMOVE SCALE, SLAG, DIRT, AND DEBRIS FROM INSIDE <br />AND OUTSIDE OF PIPES, TUBES, AND FITTINGS BEFORE <br />ASSEMBLY. <br />C. THREADED JOINTS: THREAD PIPE WITH TAPERED PIPE <br />THREADS ACCORDING TO ASME 61.20.1. CUT THREADS <br />FULL AND CLEAN USING SHARP DIES. REAM THREADED <br />PIPE ENDS TO REMOVE BURRS AND RESTORE FULL ID. <br />JOINT PIPE FITTINGS AND VALVES AS FOLLOWS: <br />1. APPLY APPROPRIATE TAPE OR THREAD COMPOUND <br />TO EXTERNAL PIPE THREADS, <br />2. DAMAGED THREADS: DO NOT USE PIPE OR FITTINGS <br />WITH THREADS THAT ARE CORRODED OR DAMAGED. <br />D. DISSIMILAR -MATERIAL PIPING JOINTS: MAKE JOINTS <br />USING ADAPTERS COMPATIBLE WITH MATERIALS OF <br />BOTH PIPING SYSTEMS. <br />3.3 HANGERS AND SUPPORT INSTALLATION <br />A. SUPPORT PIPES THROUGHOUT BUILDING, BOTH <br />HORIZONTALLY AND VERTICAL IN ACCORDANCE WITH <br />REQUIREMENTS HEREIN AND AS SHOWN ON THE <br />DRAWINGS. DO NOT USE FASTENERS WHICH <br />PENETRATE THE ROOF DECK. <br />B. PROVIDE COPPER PLATED HANGERS AND SUPPORTS <br />FOR UNINSULATED COPPER PIPING. PROVIDE PLASTIC <br />INSERTS FOR UNINSULATED COPPER PIPING <br />PENETRATING METAL STUDS. <br />C. IN AREAS WITHOUT CEILINGS, SECURE INSULATION <br />SHIELDS TO INSULATION WITH PRESSURE SENSITIVE <br />TAPE AT EACH END OF SHIELD. INSTALL HANGERS TO <br />PROVIDE MINIMUM Y2" CLEAR SPACE BETWEEN <br />FINISHED COVERING AND ADJACENT WORK. <br />E. PLACE A HANGER WITHIN ONE FOOT OF EACH <br />HORIZONTAL ELBOW. <br />F. SUPPORT VERTICAL PIPE RUNS AT ROOF, AT FLOOR, <br />AND AT MAXIMUM 15-FOOT INTERVALS. <br />G. SPACE SUPPORTS NOT MORE THAN FIVE FEET APART <br />AT VALVES, STRAINERS OR PIPING ACCESSORIES <br />LARGER THAN 2" <br />H. INSTALL LATERAL BRACING WITH PIPE HANGERS AND <br />SUPPORTS TO PREVENT SWAYING. <br />I. INSTALL HANGERS AND SUPPORTS TO ALLOW <br />CONTROLLED THERMAL, AND SEISMIC MOVEMENT OF <br />PIPING SYSTEMS, TO PERMIT FREEDOM OF MOVEMENT <br />BETWEEN PIPE ANCHORS, AND TO FACILITATE ACTION <br />OF EXPANSION JOINTS, EXPANSION LOOPS, EXPANSION <br />BENDS, AND SIMILAR UNITS. <br />J. ADJUSTING <br />1. HANGER ADJUSTMENTS: ADJUST HANGERS TO <br />DISTRIBUTE LOADS EQUALLY ON ATTACHMENTS AND <br />TO ACHIEVE INDICATED SLOPE OF PIPE. <br />2. LOAD DISTRIBUTION: ADJUST HANGERS AND <br />SUPPORTS SO THAT PIPING LIVE AND DEAD LOADS <br />AND STRESSES FROM MOVEMENT WILL NOT BE <br />TRANSMITTED TO CONNECTED EQUIPMENT. <br />3. PIPE SLOPES: ADJUST HANGERS AND SUPPORTS TO <br />PROVIDE INDICATED PIPE SLOPES AND TO NOT <br />EXCEED MAXIMUM PIPE DEFLECTIONS ALLOWED BY <br />ASME B31.9 FOR BUILDING SERVICES PIPING. <br />4. TRIM EXCESS LENGTH OF CONTINUOUS - THREAD <br />HANGER AND SUPPORT RODS TO 1-1/2". <br />3.4 PIPE INSULATION INSTALLATION <br />A.INSULATE FITTINGS AND VALVES WITH PERFORMED <br />INSULATION FITTINGS WITH PVC JACKET. <br />3.5 VALVE AND SPECIALTIES INSTALLATION <br />A.PROVIDE DEEP SEAL P-TRAPS FOR FLOOR DRAINS AND <br />MOP BASINS. <br />B. FOR CLEANOUTS LOCATED IN CONCEALED PIPING, <br />INSTALL CLEANOUT WALL ACCESS COVERS OF TYPES <br />INDICATED, WITH FRAME AND COVER FLUSH WITH <br />FINISHED WALL. <br />C. PROTECT DRAINS DURING CONSTRUCTION PERIOD TO <br />AVOID CLOGGING WITH DIRT OR DEBRIS AND TO <br />PREVENT DAMAGE FROM TRAFFIC OR CONSTRUCTION <br />WORK. <br />AND MAXIMUM ADJUSTABLE STOPS (MEMORY <br />STOPS). <br />H. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES <br />IN EQUIPMENT ROOMS MOUNTED GREATER THAN <br />7'-0" ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO <br />T-0" ABOVE FLOOR LEVEL. <br />I. ALL VALVES (EXCEPT CONTROL VALVES) AND <br />STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE <br />REDUCING SIZE TO MAKE CONNECTIONS TO <br />EQUIPMENT AND CONTROLS. <br />J. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT <br />EACH PIECE OF EQUIPMENT, IN BYPASSES, AND IN <br />LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT <br />DISASSEMBLY FOR ALTERATION AND REPAIRS. <br />K. INSTALL ALL PIPING WITHOUT FORCING OR <br />SPRINGING. <br />L. ALL PIPING SHALL CLEAR DOORS AND WINDOWS. <br />M. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND <br />EASY OPERATION. <br />N. ALL PIPING WORK SHALL BE COORDINATED WITH ALL <br />TRADES INVOLVED. OFFSETS IN PIPING AROUND <br />OBSTRUCTIONS SHALL BE PROVIDED AT NO <br />ADDITIONAL COST TO THE OWNER. <br />PLUMBING PIPING SCHEDULE: <br />PIPE <br />HANGER <br />INSULATION <br />SYSTEM <br />LOCATION <br />SIZE <br />MATERIAL <br />JOINTS <br />FITTINGS <br />SPACING (FT) <br />THICKNESS (IN) <br />NOTES <br />DOMESTIC <br />ABOVE <br />1-1/4" AND SMALLER <br />TYPE L HARD <br />WROUGHT <br />6 <br />1/2 <br />COLD WATER <br />GRADE <br />COPPER <br />SOLDER <br />COPPER <br />� <br />1-1/2 AND SMALLER <br />10 <br />1/2 <br />- <br />1-1/2" AND SMALLER <br />HUBLESS <br />HUBLESS <br />HUBLESS CAST <br />5 <br />- <br />1,2 <br />CAST IRON <br />IRON <br />SANITARY <br />1-1/2" AND SMALLER <br />DWV HARD <br />CAST BRONZE OR <br />10 <br />- <br />- <br />SEWER <br />ALL <br />COPPER <br />SOLDER <br />WROUGHT <br />1-1/4 <br />6 <br />- <br />- <br />COPPER <br />ALL <br />PVC SCHD 40 <br />SOLVENT <br />DWV SOCKET <br />4 <br />- <br />3 <br />DWV <br />WELD <br />GENERAL NOTES: <br />A. ALL PRODUCTS USED IN DOMESTIC COLD AND HOT WATER PIPING F. <br />FOR INSULATED PIPING PROVIDE PIPE HANGER INSULATION <br />SYSTEMS MUST BE NSF/ANSI 61 CERTIFIED AND BE LEAD FREE. <br />SHIELD ACCORDING TO HANGER MANUFACTURER. <br />LEAD FREE PRODUCTS MUST BE LISTED AND LABELED BY A THIRD G. <br />FOR INSULATED PIPING PROVIDE PIPE HANGER INSULATION <br />PARTY AS LEAD FREE SUCH THAT THE WETTED SURFACE <br />SHIELD ACCORDING TO HANGER MANUFACTURER. <br />MATERIALS HAVE NO MORE THAN 0.25% LEAD CONTENT. H. <br />HANGER SPACING DOES NOT APPLY TO UNDERGROUND AND <br />B. INSULATION TO BE FIBERGLASS, POLYMER FOAM, OR <br />BELOW SLAB PIPING. <br />ELASTOMERIC PREFORMED PIPE INSULATION WITH SELF SEALING I. <br />INSULATION THICKNESS ONLY APPLIES TO DOMESTIC HOT WATER <br />ADHESIVE LAP. <br />FOR UNDERGROUND AND BELOW SLAB PIPING. <br />C. DOMESTIC COLD WATER, STORM PIPING, AND CONDENSATE PIPING J. <br />HUBLESS CAST IRON JOINTS MUST BE MADE WITH ASTM C1540 <br />FIBERGLASS INSULATION MUST HAVE VAPOR RETARDED JACKET, <br />HEAVY DUTY SHIELDED COUPLINGS WITH CENTER STOPS. <br />SEAL JOINTS WITH 2" WIDE PRESSURE SENSITIVE VAPOR K. <br />PVC PIPE MUST BE SOLID WALL, FOAM CORE IS NOT PERMITTED. <br />RETARDED TAPE. L. <br />DO NOT USE PVC PIPING IN RETURN AIR PLENUM. <br />D. INSULATION MUST BE INSTALLED ACCORDING TO M. <br />DUCTILE IRON AND CAST IRON PIPING MUST HAVE POLYETHYLENE <br />MANUFACTURER'S REQUIREMENTS. <br />ENCASEMENT WHEN INSTALLED IN CORROSIVE SOILS, VERIFY IN <br />E. PIPE HANGING AND SUPPORT COMPONENTS AND METHODS TO BE <br />FIELD. <br />IN ACCORDANCE WITH ANSI/MSS SP-58-2009. <br />NOTES: <br />1. AT LEAST 1 ADDITIONAL HANGER IS REQUIRED AT EACH JOINT. <br />2. 10' HANGER SPACING IS PERMITTED ONLY IF 10' LENGTHS OF PIPE ARE USED. <br />3. PIPE MATERIAL MAY BE USED WHERE PERMITTED BY AUTHORITY HAVING JURISDICTION. <br />PIPE MATERIALS: <br />CONDITION/LOCATION <br />MATERIAL TYPE <br />ABOVE GROUND WATER <br />TYPE "L" COPPER <br />BELOW GROUND WATER <br />TYPE "K" COPPER <br />WASTE (UNDER 2") <br />TYPE "M" COPPER <br />WASTE ABOVE 2") <br />CAST IRON <br />WASTE <br />SCHEDULE 40 PVC PLASTIC <br />VENT <br />SCHEDULE 40 PVC PLASTIC <br />VENT (UNDER 2") <br />TYPE "M" COPPER <br />VENT (ABOVE 2") <br />CAST IRON <br />SLOPE OF HORIZONTAL <br />DRAINAGE PIPE: <br />SIZE(INCHES) <br />MIN. SLOPE (INCHES PER FOOT) <br />2-1/2 OR LESS <br />1/4 <br />3 TO 6 <br />1 /8 <br />8 OR LARGER <br />1/16 <br />PLUMBING INSULATION NOTES: <br />DOMESTIC COLD WATER <br />ABOVE GRADE: LIGHT DENSITY, FIBERGLASS PIPE INSULATION. 1/2" <br />THICK, WITH VAPOR BARRIER JACKET. <br />DOMESTIC HOT WATER <br />ABOVE GRADE: LIGHT DENSITY, FIBERGLASS PIPE INSULATION, 1" <br />THICK, WITH GLASS CLOTH JACKET. <br />AT CONTRACTOR'S OPTION FIBERGLASS SNAP ON INSULATION WITH <br />FOAM VAPOR BARRIER MAY BE SUBSTITUTED FOR ABOVE. <br />DOMESTIC HOT AND COLD WATER PIPING IN PIPE CHASES <br />SHALL BE INSULATED WITH "/" THICK, 3-1/21B. DENSITY FIBERGLASS <br />WITH ALL PURPOSE VAPOR BARRIER JACKET. <br />EXPOSED SANITARY WASTE PIPING <br />SHALL BE INSULATED WITH 1%" THICK,GLASS MINERAL WOOL, WITH <br />ALL PURPOSE VAPOR BARRIER JACKET. <br />PLUMBING FIXTURE SCHEDULE: <br />PLAN <br />BASIC OF <br />CONNECTIONS <br />MARK <br />DESCRIPTION <br />DESIGN <br />TRIM <br />CW <br />HW <br />W <br />V <br />NOTES <br />WATER CLOSET <br />KOHLER <br />PRESSURE ASSISTED 1.6GPF TANK TYPE FLOOR <br />WC <br />(TANK TYPE <br />HIGHLINE <br />MOUNTED WATER CLOSET. K-3493 FOR LEFT <br />1/2" <br />- <br />4" <br />2" <br />3 <br />FLOOR OUTLET) <br />K-3493-0 <br />HAND LEVER LOCATION. KOHLER K-4650 <br />ELONGATED OPEN FRONT SEAT <br />FAUCET TYPE F-A, KEENEY 570OPC DRAIN, 301PC <br />LAVATORY (WALL <br />KOHLER SOHO <br />P-TRAP, TRUEBRO LAV GUARD E-Z SERIES <br />LAV <br />MOUNTED SINK) <br />K-2054-0 <br />WHITE. PROVIDE ASSE 1070 THERMOSTATIC <br />1/2" <br />1/2" <br />2" <br />1-1/2" <br />1, 2, 3, 4 <br />MIXING VALVE, SET OUTLET TEMPERATURE TO <br />100°F. <br />F-A <br />LAVATORY FAUCET <br />ZURN <br />0.5 GPM VANDAL RESISTANT AERATOR. ADA <br />3/8" <br />3/8" <br />- <br />- <br />3 <br />Z-7440-XL-FC <br />COMPLIANT <br />NOTES: <br />1. REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHT AND EXACT MOUNTING POSITION OF FIXTURES, <br />2. FAUCET HOLES TO MATCH FAUCET SPECIFIED. <br />3. FIXTURE ASSEMBLY MUST BE APPROVED BY AND INSTALLED PER ADA REQUIREMENTS. <br />4. PROVIDE INSULATION KIT ON ALL ADA FIXTURES EXPOSED SUPPLIED AND TRAP. <br />BASIS OF DESIGN PRODUCTS ARE INDICATED FOR REFERENCE ONLY. COMPARABLE PRODUCTS WILL BE ACCEPTED PROVIDED <br />COMPLIANCE WITH TECHNICAL SPECIFICATION REQUIREMENTS. <br />FIXTURE UNIT LOAD VALUES: <br />FIXTURE TYPE <br />OCCUPANCY <br />CONTROL <br />L <br />QTY. <br />FIXTURE UNITS <br />DRAINAGE <br />WATER SUPPLY <br />COLD <br />HOT <br />TOTAL <br />LAVATORY <br />PUBLIC <br />FAUCET <br />2 <br />1.0 <br />1.5 <br />1.5 <br />2.0 <br />WATER CLOSET (1.6GPF) <br />PUBLIC <br />FLUSH TANK <br />2 <br />4.0 <br />5.0 <br />- <br />5.0 <br />NOTES: <br />1. DRAINAGE FIXTURE UNITS BASED ON FLORIDA PLUMBING CODE TABLE 709.1. WATER SUPPLY FIXTURE <br />UNITS BASED ON UNIFORM PLUMBING CODE TABLE E103.3(2). <br />2. ITEMS IN GRAY ARE EXISTING TO REMAIN OR OUT OF SCOPE OF WORK. <br />Bank of America <br />ADA- ZEPHYRHILLS <br />5632 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33542 <br />SERIAL NUMAWANH. ID: FL2-019 <br />Nelco Architecture, Inc. <br />a licensed affiliate <br />Florida Certificate of Authorization Number: AA26000525 <br />Architect: Client Representative: <br />Firm Name: NELSON Firm Name: 3LL <br />Attn: Mark Schroeder Attn: David Berrios <br />T: 404.881.1811 Tel.: 813.245.0909 <br />e-mail: mschroeder@nelsononline.com e-mail: David.Berrios@am.jll.com <br />Engineer: <br />Firm Name: Infinity Engineering Group, LLC. <br />Attn: Brett Nevaril <br />1208 E Kennedy Blvd, STE 230 <br />Tampa, FL 33602 <br />T: 813.434-4770 <br />e-mail: brett@iegroup.net <br />Certification of Authorization #27889 <br />General Contractor: <br />Firm Name: Spartan Contracting Corporation <br />Attn: Scott Kramer <br />T: 813.481.5778 <br />e-mail: skramer@spartancc.com <br />Issue Date & Issue Description By Check <br />1 04/23/18 Issue For Review 3P VO <br />2 04/27/18 Issue For Permit JP VO <br />ISeal/Signature <br />NISIT SAPPARKHAO, P.E. <br />FL REG. NO. 64085 <br />1`do 085 <br />o <br />id�� .�. <br />s <br />" 3 S TA E OF 4U: <br />i A, <br />DATE <br />IProject Name <br />Bank Of America <br />Zephyrh i l is <br />Upgrade <br />NELSON Project Number <br />18.00358.00 / 10-65.439 <br />IDescription <br />PLUMBING SPECIFICATIONS, NOTES, AND <br />SCHEDULES <br />Scale & Sheet Number <br />AS INDICATED <br />POOM01 <br />