PANEL SCHEDULE
<br />AMPS:
<br />100
<br />AMP LOCATION:
<br />BACK VOLTS: 120 240V
<br />PHASE:
<br />3
<br />WIRE: GRN. BAR:
<br />SQ. D.
<br />TYPE:QO
<br />NEMA: 1 MTD:
<br />S SPACES: 30
<br />FEEDER
<br />WIRES:
<br />CKT
<br />AMP.
<br />PHASE
<br />DESCRIPTION
<br />VA
<br />WIRE
<br />NOTES
<br />PHASE
<br />CKT
<br />AMP.
<br />PHASE
<br />DESCRIPTION
<br />VA
<br />WIRE
<br />NOTES
<br />NO.
<br />SIZE
<br />A B C
<br />NO.
<br />SIZE
<br />1
<br />20
<br />NAIL TABLE
<br />2
<br />20
<br />NAIL TABLE
<br />3
<br />20
<br />NAIL TABLE
<br />4
<br />20
<br />NAIL TABLE
<br />5
<br />20
<br />NAIL TABLE
<br />6
<br />20
<br />NAIL TABLE
<br />7
<br />20
<br />TV RECEPTACLE
<br />8
<br />20
<br />TV RECEPTACLE
<br />9
<br />30
<br />DRYER
<br />10
<br />20
<br />PEDICURE CHAIR
<br />11
<br />12
<br />20
<br />PEDICURE CHAIR
<br />13
<br />20
<br />WASHER
<br />14
<br />20
<br />PEDICURE CHAIR
<br />15
<br />16
<br />20
<br />PEDICURE CHAIR
<br />30
<br />HOT WATER
<br />17
<br />18
<br />20
<br />1 OFFICE & BATHROOM RECPETACLE
<br />19
<br />20
<br />20
<br />NAIL STATION LIGHTS
<br />30
<br />HOT WATER
<br />21
<br />22
<br />50
<br />AHU
<br />23
<br />20
<br />PEDICURE CHAIR
<br />24
<br />25
<br />20
<br />PEDICURE LIGHT
<br />26
<br />50
<br />A/C
<br />27
<br />20
<br />SIGN
<br />28
<br />29
<br />20
<br />SHOW WINDOW
<br />30
<br />20
<br />EXHAUST FAN
<br />TOTAL CONNECTED VA
<br />TOTAL CONNECTED VA
<br />NOTES:
<br />1.
<br />PRIOR TO ANY WORK, FIELD
<br />MEASURE ACTUAL LOAD ON THIS PANEL TO
<br />CONFIRM THAT THIS PANEL IS CAPABLE OF SUPPORTING NEW LOADS
<br />SHOWN. REPORT RESULTS TO ARCHITECTURE IN WRITING PRIOR TO BEGINNING AND
<br />CONSTRUCTION ACTIVITIES.
<br />2.
<br />* INDICATES EXISTING BRANCH
<br />CIRCUIT TO REMAIN.
<br />3.
<br />FIELD VERIFY ALL ITEMS IN THIS PANEL SHOWN EXISTING TO REMAIN &
<br />ENSURE CONTINUITY
<br />OF SERVICE TO THESE CIRCUITS IF REQUIRED PER
<br />THE NEW DESIGN (E.G. EXHAUST FANS).
<br />5.
<br />DEMAND LOAD CALCULATION:
<br />ITEM
<br />LOAD
<br />LIGHTS
<br />3137.5 ® 100%
<br />WATER HEATER (2)
<br />10,000 VA
<br />HEAT (1)
<br />10,000 VA
<br />NAIL TABLE (6)
<br />7200 VA
<br />PEDICURE CHAIRS (8)
<br />8100 VA
<br />GP RECEPTACLES (5)
<br />2000 VA
<br />EXHAUST FAN (2)
<br />1200 VA
<br />DRYER (1)
<br />5000 VA
<br />SIGN (1)
<br />1200 VA
<br />LARGEST MOTOR
<br />2500 VA
<br />SHOW WINDOW
<br />1200 VA
<br />TOTAL
<br />18,4000 AMPS
<br />FIRST 10,000 0 100%
<br />10,000
<br />REMAINDER ® 50%
<br />19,200
<br />1009E LIGHT
<br />3137.50
<br />TOTAL VA
<br />32,337.5
<br />TOTAL
<br />89.826 AMPS
<br />6013 EXISTING VERIZON LOAD
<br />100 AMP TOTAL
<br />6013 NEW NAIL SALON 83.993 AMPS
<br />TOTAL LOAD OF EXISTING 600AMP = 183.933 AMPS
<br />EMT—IN6
<br />Fw-o AMP 120/708Y
<br />" NIPPLE W/ (4) 3/0 ALU XHHW
<br />ELECTRICAL SPECIFICATIONS:
<br />1. GENERAL
<br />A. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED FOR A COMPLETE SYSTEM AS OUTLINED IN THE
<br />CONTRACT DRAWINGS AND THESE SPECIFICATIONS.
<br />B. NOTE THAT DRAWINGS ARE DIAGRAMMATIC ONLY AND INTENDED TO SHOW THE GENERAL ARRANGEMENT OF
<br />SYSTEMS. NOT EVERY MINUTE DETAIL
<br />C. DO NOT SCALE PLANS.
<br />D. PROVIDE ALL NECESSARY FITTINGS, BOXES, TRANSITIONS, CONNECTORS, ETC. WHETHER SHOWN OR NOT ON
<br />PLANS.
<br />E. ALL WORK IS NEW UNLESS OTHERWISE NOTED.
<br />F. THESE PLANS REPRESENT THE DESIGN INTENT BASED ON INFORMATION AVAILABLE AT THE TIME OF DESIGN. ANY
<br />SUBSTANTIAL MODIFICATIONS OR ALTERATIONS MADE DURING THE CONSTRUCTION PHASE SHALL BE REPORTED TO
<br />THE ENGINEER PRIOR TO WORK. MODIFICATIONS MADE WITHOUT THE ENGINEER'S WRITTEN APPROVAL SHALL REMAIN
<br />THE RESPONSIBILITY OF ,THE CONTRACTOR.
<br />G. IN CASE OF ANY DISCREPANCIES BETWEEN THE DRAWINGS, SPECIFICATIONS, FIELD CONDITIONS, CODES, ETC. IT
<br />IS THE RESPONSIBILITY OF THE CONTRACTOR TO REFER ALL SUCH MATTERS TO THE ENGINEER IN WRITING
<br />IMMEDIATELY FOR RESOLUTION PRIOR TO EXECUTING ANY WORK. ANY WORK PERFORMED WITHOUT THE WRITTEN
<br />AUTHORIZATION OF THE ENGINEER SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />H. ALL WORK SHALL CONFORM TO THE FOLLOWING CODES (AS APPLICABLE) AS WELL AS ALL LOCAL REGULATIONS,
<br />ORDINANCES, AND AMENDMENTS
<br />2010 FLORIDA BUILDING CODE
<br />2008 NFPA-70 NATIONAL ELECTRICAL CODE
<br />2005 NFPA-72 NATIONAL FIRE ALARM CODE
<br />2. SCOPE OF WORK
<br />PROVIDE NEW ELECTRICAL DEVICES AND CONNECT TO EXISTING SYSTEM. PROVIDE NEW LIGHTING, RECEPTACLES,
<br />SWITCHES, ETC. AND CONNECT AS SHOWN ON PLANS.
<br />3. ITEMS FURNISHED BY CONTRACTOR
<br />IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIALS, EQUIPMENT, AND
<br />ACCESSORIES NECESSARY TO MAKE A COMPLETE INSTALLATION. ALL EQUIPMENT SHALL BE STORED IN A SAFE, DRY
<br />PLACE IN THE MANUFACTURER'S ORIGINAL PACKAGING UNTIL READY FOR USE. THE OWNER SHALL NOT BE
<br />RESPONSIBLE FOR PROVIDING ANY PART OF THE PROJECT, UNLESS SPECIFICALLY NOTED. THE CONTRACTOR SHALL
<br />ALSO BE RESPONSIBLE FOR PAYING ALL REQUIRED FEES, OBTAINING ALL PERMITS. AND ARRANGING FOR ALL
<br />INSPECTIONS, INCLUDING COORDINATION WITH AND SATISFYING ALL REQUIREMENTS OF THE ELECTRICAL UTILITY
<br />COMPANY(IES) AS MAY BE REQUIRED TO EXECUTE THIS SCOPE OF WORK.
<br />4. WORK IN EXISTING BUILDINGS
<br />A. DO NOT USE POWDER DRIVEN FASTENERS OF ANY TYPE.
<br />B. ALL ITEMS REMOVED AND NOT RE —USED SHALL BE TURNED OVER TO THE OWNER. CONTRACTOR SHALL REMOVE
<br />ANY UNSATISFACTORY ITEMS FROM THE PROJECT SITE.
<br />C. SOME EXISTING ITEMS TO REMAIN WITHOUT WORK ARE SHOWN FOR CLARITY OR REFERENCE ONLY. NOTE THAT
<br />ADDITIONAL ITEMS WITHOUT WORK MAY ALSO BE PRESENT.
<br />D. DRAWINGS OF EXISTING SYSTEMS ARE BASED ON EXISTING DOCUMENTS AND FIELD CONDITIONS, SOME OF
<br />WHICH MAY BE UNVERIFIED. PRIOR TO SUBMITTING A BID, CONTRACTOR SHALL STUDY THE PLANS AND VISIT THE
<br />PROJECT SITE IN ORDER TO BECOME FAMILIAR WITH EXISTING CONDITIONS. ANY DISCREPANCIES IN THE CONTRACT
<br />DOCUMENTS WHICH COULD SIGNIFICANTLY IMPACT THE PROJECT BUDGET OR SCHEDULE MUST BE REPORTED TO
<br />THE ENGINEER IN WRITING IMMEDIATELY. FAILURE TO DO SO WILL NOT BE SUFFICIENT CAUSE FOR DELAYS OR
<br />CHANGES LATER IN THE PROJECT. CHANGE ORDERS RESULTING FROM FAILURE TO PROPERLY INVESTIGATE EXISTING
<br />FIELD CONDITIONS WILL NOT BE ACCEPTED. ALL WORK IS NEW UNLESS OTHERWISE NOTED.
<br />E. MODIFICATIONS TO EXISTING SYSTEMS NECESSARY TO CONNECT TO NEW WORK SHALL BE CONSIDERED TO BE
<br />PART OF THE BASIC WORK OF THIS CONTRACT.
<br />F. COORDINATE ALL WORK SCHEDULES WITH THE OWNER TO MINIMIZE DISRUPTIONS TO EXISTING SYSTEMS OUTSIDE
<br />THIS SCOPE OF WORK.
<br />5 COORDINATION
<br />ALL WORK ON THIS PROJECT SHALL BE COORDINATED WITH THE OWNER AND ALL OTHER TRADES PRIOR TO
<br />BEGINNING AY WORK OR ORDERING ANY MATERIALS. CONTRACTOR SHALL REVIEW PLANS OF ALL DISCIPLINES
<br />INVOLVED AND ADVISE THE ARCHITECT IN WRITING OF ANY CONFLICTS, CODE OR SAFETY ISSUES THAT MAY EXIST
<br />PRIOR TO ANY FABRICATION OR ORDERING OF EQUIPMENT. RESOLUTION OF SUCH CONFLICTS WHICH ARE NOT
<br />REPORTED PRIOR TO CONSTRUCTION SHALL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR AND CHANGE ORDER
<br />PROPOSALS FOR SUCH WORK WILL NOT BE ACCEPTED. PROVIDE ROUTING AND OFFSETS NECESSARY TO AVOID
<br />CONFLICTS WITH STRUCTURE, FINISHES, AND WORK OF OTHERS. CONTRACTOR SHALL PROVIDE ALL CORE
<br />PENETRATIONS AND PATCHING FOR FLOOR PENETRATIONS.
<br />S. DEVICE LOCATIONS
<br />A. INSTALL ALL DEVICES IN ACCESSIBLE LOCATIONS, EXCEPT AS SPECIFICALLY NOTED OR PROHIBITED BY NEC.
<br />B. PROVIDE MIN. 1808 INCH PAINTED ALUMINUM ACCESS DOORS WITH FULL HINGE AND KEY, FOR ACCESS TO
<br />ALL ELECTRICAL DEVICES, PULL BOXES, JUNCTION BOXES. AND ACCESSORIES IN PLASTER, DRYWALL. OR
<br />INACCESSIBLE CEILINGS. OR IN WALLS. GROUP DEVICES AT A SINGLE LOCATION, AS AVAILABLE.
<br />C. ACCESS DOORS IN RATED WALLS OR CEILINGS SHALL HAVE A RATING AT LEAST EQUAL TO THE RATING OF THE
<br />WALL OR CEILING.
<br />D. ALL DEVICES, RACEWAYS, ETC. WHICH ARE EXPOSED SHALL BE PAINTED TO MATCH THE ADJACENT SURFACE OR
<br />AS DIRECTED BY THE ARCHITECT.
<br />E. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED A MINIMUM OF 1'-0" ABOVE THE BASE FLOOD ELEVATION.
<br />7. EQUIPMENT GENERAL
<br />ALL EQUIPMENT OF EACH TYPE SHALL BE BY ONE MANUFACTURER AND SHALL HAVE CHARACTERISTICS AS LISTED
<br />IN THE EQUIPMENT SCHEDULES. ALL EQUIPMENT SHALL BE UL LISTED, NO EXCEPTIONS I SUBSTITUTIONS ARE
<br />ACCEPTABLE PROVIDED THAT THE SUBSTITUTED EQUIPMENT HAS EQUIVALENT CHARACTERISTICS AS THAT SCHEDULED
<br />AND IS PROVIDED BY AN ACCEPTABLE MANUFACTURER AS LISTED FOR THAT EQUIPMENT TYPE. CONTRACTOR SHALL
<br />SUBMIT PRODUCT DATA FOR ALL EQUIPMENT TO THE ENGINEER FOR APPROVAL PRIOR TO ORDERING. SUBMITTALS
<br />SHALL INCLUDE DIMENSIONS, WEIGHT, VOLTAGE, AMPERAGE, HORSEPOWER, POWER FACTOR, INTERRUPTING CAPACITY,
<br />ETC.
<br />8. CONDUCTORS
<br />A. PROVIDE ONLY DUAL RATED THWN-2/THHN-2 COPPER CONDUCTORS. MINIMUM SIZE IS NUMBER 12 AWG.
<br />B. CONDUCTORS SHALL HAVE COLORED INSULATION FOR IDENTIFICATION PURPOSES AS FOLLOWS:
<br />2401208/120V
<br />PHASE A BLACK
<br />PHASE B RED
<br />PHASE C BLUE
<br />NEUTRAL WHITE
<br />GROUND GREEN
<br />C. GROUNDED CONDUCTORS WHICH CARRY OVER 250V TO GROUND SHALL BE TAGGED WITH VOLTAGE AT EACH
<br />TERMINATION POINT.
<br />D. DO NOT INSTALL MORE THAN THREE CURRENT CARRYING CONDUCTORS IN SINGLE RACEWAY (NOT INCLUDING
<br />NEUTRAL) WHICH WILL REQUIRE NEC TABLE 310-16 NOTE 8 DERAIING.
<br />E. PHASE AND GROUNDING CONDUCTOR SIZES SHALL BE INCREASED AS NECESSARY TO ACCOUNT FOR VOLTAGE
<br />DROP.
<br />9. RACEWAYS
<br />A. INSTALL ALL WIRING ABOVE GROUND IN METALLIC CONDUIT (EMT INDOORS, RGS OUTDOORS OR IN EXPOSED
<br />LOCATIONS).
<br />B. ALL EXPOSED RACEWAYS SHALL BE RUN PARALLEL TO WALLS OR CEILINGS AND SHALL BE PAINTED TO MATCH
<br />ADJACENT SURFACES OR AS DIRECTED BY THE OWNER.
<br />C. WHERE MULTIPLE RACEWAYS ARE RUN EXPOSED, RUN ALL RACEWAYS SQUARE AND PARALLEL IN A NEAT AND
<br />ORDERLY MANNER.
<br />D. MAKE FINAL CONNECTIONS (NOT MORE THAN 6'-0- LONG) TO ALL EQUIPMENT WITH FLEXIBLE METALLIC
<br />CONDUIT (DRY LOCATIONS) OR LIQUID TIGHT FLEXIBLE METALLIC CONDUIT (DAMP OR WET LOCATIONS).
<br />E. INSTALL ALL WIRING BELOW GROUND IN RIGID NON—METALLIC CONDUIT (SCHEDULE 40 PVC). ALL EXTERIOR
<br />NONMETALLIC CONDUITS SHALL BE UV RESISTANT. ALL CONDUITS RUN BELOW GROUND SHALL BE INSTALLED
<br />ACCORDING TO NEC300-5.
<br />F. TYPE MC CABLE MAY BE USED AS AN ALTERNATIVE TO CONDUCTORS IN METAL RACEWAY IN DRY INDOOR
<br />LOCATIONS, PROVIDED IT IS INSTALLED PER NEC AND APPROVED BY THE AUTHORITY HAVING JURISDICTION.
<br />G. METALLIC CONDUITS SHALL. NOT BE USED AS GROUNDING CONDUCTORS. PROVIDE A SEPARATE GROUNDING
<br />CONDUCTOR IN ALL METALLIC CONDUITS, BONDED AT BOTH ENDS PER NEC.
<br />EXI5TIN&
<br />(2) 3" CONDUIT W/ (4) 350 MCM
<br />O O
<br />200 AW 200 AW
<br />METER METER
<br />co 15
<br />Zoo AW EXISTIN&
<br />DBC ON ECT 200 AMP
<br />w (5)150 AMP DISCOPIrEGT
<br />Fl�
<br />2" NEW CONDUIT W/ (4) 3/0
<br />ALU XHHW, (1) # 1 ALU XHHW
<br />GROUND
<br />ELECTRICAL RISER DIAGRAM
<br />SCALE: 1/4" = 1'-0"
<br />EXI5TINS
<br />200 A1rP
<br />SWCE W
<br />2SM
<br />550 MGM
<br />10. GROUNDING
<br />A. ALL ELECTRICAL SYSTEMS SHALL BE PROPERLY GROUNDED PER NEC 250.
<br />B. EXPOSED GROUNDING ELECTRODE CONDUCTORS SHALL BE PROTECTED BY RIGID NONMETALLIC
<br />CONDUITS, MIN SIZE - in.
<br />C. PROVIDE GROUNDING ELECTRODE CONDUCTORS TO DRIVEN GROUND RODS AT THE BASE OF ALL
<br />LIGHT POLES, REMOTE BUILDINGS, OR REMOTE EQUIPMENT.
<br />D. ALL METAL ITEMS OF THE ELECTRICAL SYSTEM INCLUDING RACEWAYS, BOXES, FIXTURES, ETC.
<br />SHALL BE BONDED AND PROPERLY GROUNDED.
<br />11, SWITCHBOARDS AND PANEL BOARDS
<br />A. PROVIDE SWITCHBOARDS AND PANEL BOARDS, SIZE AND ARRANGEMENT AS INDICATED ON PLANS
<br />AND SCHEDULES.
<br />B. MOUNT PANEL BOARDS NOT MORE THAN 480 A.F.F. TO CENTER.
<br />C. ENCLOSURES SHALL BE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE INSTALLED (NEMA
<br />1 INDOORS, NEMA 3R OUTDOORS, ETC.)
<br />D. PROVIDE A TYPEWRITTEN PANEL SCHEDULE IDENTIFYING THE FUNCTION OF ALL CIRCUIT
<br />BREAKERS IN A CLEAR PLASTIC SLEEVE PERMANENTLY ATTACHED TO THE PANEL BOARD COVER.
<br />E. ALL SWITCHBOARDS AND PANEL BOARDS SHALL HAVE A THERMOPLASTIC IDENTIFYING NAMEPLATE
<br />PERMANENTLY AFFIXED TO THE FRONT OR COVER.
<br />F. PROVIDE ONE 1' EMPTY CONDUIT FROM PANEL TO 6' ABOVE CEILING FOR EVERY (3) SPARES
<br />OR SPACES.
<br />G. PANEL BOARDS AND SWITCHBOARDS BY: SQUARE D. CUTLER HAMMER. OR GE.
<br />12, CIRCUIT BREAKERS
<br />A. ALL CIRCUIT BREAKERS SHALL BE BY A SINGLE MANUFACTURER, WITH SAME STYLE AND
<br />WITHSTAND RATING TO MATCH THE PANEL IN WHICH THEY ARE INSTALLED.
<br />B. PROVIDE MULTIPLE POLE CIRCUIT BREAKERS FOR MULTIPLE POLE CIRCUITS. HANDLE TIES ARE
<br />NOT PERMITTED.
<br />C. PROVIDE HACR TYPE CIRCUIT BREAKERS FOR ALL HVAC EQUIPMENT AND WATER HEATERS.
<br />D. PROVIDE GROUND FAULT CIRCUIT INTERRUPTER BREAKERS FOR ALL OUTDOOR. BATHROOM, AND
<br />KITCHEN BRANCH CIRCUITS WHICH DO NOT UTILIZE GFCI RECEPTACLES, OR AS OTHERWISE
<br />REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
<br />E. NOT USED.
<br />F. NOT USED.
<br />G. PROVIDE INVERSE TIME CIRCUIT BREAKERS FOR MOTORS UNLESS SPECIFIED OTHERWISE.
<br />H. CIRCUIT BREAKERS SHALL BE PROVIDED WITH INDICATING ON/OFF HANDLES.
<br />J. CIRCUIT BREAKERS FOR FIRE ALARMS SHALL BE LOCKABLE.
<br />K. CIRCUIT BREAKERS BY: SQUARE D, CUTLER HAMMER. OR GE.
<br />13, DEVICES
<br />A. PROVIDE GALVANIZED STEEL BOXES FOR ALL DEVICES IN EXPOSED LOCATIONS OR RECESSED
<br />INTO RATED WALLS.
<br />B. PROVIDE THERMOPLASTIC OR GALVANIZED STEEL BOXES FOR ALL DEVICES TO BE RECESSED INTO
<br />NON —RATED WALLS.
<br />C. FINISH OF ALL DEVICES AND COVER PLATES SHALL BE AS DIRECTED BY THE OWNER IN WRITING
<br />PRIOR TO ORDERING.
<br />D. ALL RECEPTACLES SHALL BE OF THE GROUNDING TYPE.
<br />E. ALL RECEPTACLES SHALL BE 20 AMP, 120 VOLT RATED, COMMERCIAL GRADE.
<br />F. PROVIDE DISCONNECT SWITCHES (WITH OR WITHOUT FUSES AS SPECIFIED) IN ENCLOSURES
<br />SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE INSTALLED (NEMA 1 INDOORS, NEMA 3R
<br />OUTDOORS & AT WATER HEATER, ETC.)
<br />G. ALL SWITCHES AND RECEPTACLES BY LEVITON, GE. OR EQUIVALENT.
<br />H. PROVIDE GFCI RECEPTACLES IN ALL KITCHENS. BATHROOMS. GARAGES, OUTSIDE, OR WHEREVER
<br />ELSE SHOWN ON DRAWINGS. LABEL ALL DEVICES DOWNSTREAM OF GFCI DEVICE AS 'GFCI
<br />PROTECTED'. PROVIDE AT LEAST ONE DUPLEX GFCI PROTECTED RECEPTACLE IN A WEATHERPROOF
<br />ENCLOSURE WITHIN TWENTY FIVE (25) FEET OF ALL ROOF OR GRADE MOUNTED EXTERIOR HVAC
<br />EQUIPMENT.
<br />J. FOR GFCI RECEPTACLES NOT ON A DEDICATED BRANCH CIRCUIT (SUCH AS OUTDOOR
<br />RECEPTACLES CONNECTED TO THE NEAREST INTERIOR CIRCUIT). MAKE EVERY ATTEMPT TO LOCATE
<br />THE GFCI RECEPTACLE AT THE END OF THE CIRCUIT RUN SO AS TO MINIMIZE THE POSSIBILITY OF
<br />CAUSING NUISANCE POWER LOSS TO OTHER DEVICES WHEN THE GFCI DEVICE TRIPS.
<br />14. LIGHTING
<br />A. ALL LIGHT FIXTURES SHALL BE THOSE DESCRIBED IN THE LIGHTING FIXTURE SCHEDULE OR
<br />THEIR EQUIVALENT AS APPROVED BY THE ENGINEER PRIOR TO ORDERING. IF ALTERNATE FIXTURES
<br />ARE USED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THEIR
<br />INSTALLATION DETAILS WITH ALL OTHER TRADES WITH REGARD TO SPACE REQUIRED, WIRING. POWER
<br />CONSUMPTION. ETC.
<br />B. LIGHTING BRANCH CIRCUITS SHALL NOT BE LOADED TO MORE THAN 80% OF THE CIRCUIT
<br />BREAKER AAPACITY.
<br />C. ALL LIGHT FIXTURES INSTALLED IN DAMP, WET, OR HAZARDOUS (CLASSIFIED) LOCATIONS SHALL
<br />BE LISTED FOR SUCH USE.
<br />D. INCANDESCENT LAMPS SHALL NOT BE USED EXCEPT FOR DIMMING PURPOSES OR AS OTHERWISE
<br />STATED ON PLANS OR PERMITTED BY THE AUTHORITY HAVING JURISDICTION.
<br />E. ALL FLUORESCENT OR HID LIGHT FIXTURES SHALL BE FUSED WITH ELECTRONIC BALLAST AS
<br />REQUIRED TO MEET THE SWITCHING REQUIREMENTS DESCRIBED ELSEWHERE IN THESE DOCUMENTS
<br />OR THE AUTHORITY HAVING JURISDICTION. PROVIDE MULTIPLE BALLASTS WHERE REQUIRED TO
<br />PROVIDE MULTIPLE LIGHTING LEVELS TO COMPLY WITH APPLICABLE ENERGY CODES.
<br />F. INTERIOR LIGHTING IN ALL BUILDINGS LARGER THAN 5.000 SQUARE FEET SHALL BE PROVIDED
<br />5W& AUTOMATIC CONTROLS. CONTROLS SHALL CONSIST OF A CENTRAL TIME —OF —DAY SCHEDULING
<br />LLER OR OCCUPANCY SENSORS LOCATED IN EACH SPACE. OCCUPANCY SENSORS SHALL BE
<br />LOCATED SO THE OCCUPANT CAN SEE THE CONTROLLED LIGHTING AND SHALL BE CAPABLE OF A 4
<br />HOUR OVERRIDE. LIGHTING CONTROL ZONES SHALL NOT EXCEED 2.500 SQUARE FEET.
<br />G. PROVIDE TIME CLOCKS OR NORTH FACING PHOTOCELLS TO CONTROL ALL EXTERIOR LIGHTING
<br />CIRCUITS AUTOMATICALLY. PROVIDE LIGHTING CONTACTORS AS REQUIRED.
<br />H. ALL EXIT SIGNS AND EMERGENCY EGRESS LIGHTING SHALL NOT BE SWITCHED AND SHALL HAVE
<br />BATTERY BACKUP OR BE CONNECTED TO THE EMERGENCY POWER SYSTEM.
<br />15. WARRANTIES AND MAINTENANCE
<br />A. ALL EQUIPMENT SHALL BE STARTED, TESTED, ADJUSTED, LUBRICATED, CLEANED, AND PLACED IN
<br />GOOD OPERATING CONDITION BY THE CONTRACTOR. CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT,
<br />MATERIALS, AND WORKMANSHIP TO BE FREE OF DEFECTS FOR A PERIOD OF ONE YEAR FROM THE
<br />DATE OF ACCEPTANCE BY THE OWNER AND THE CONTRACTOR SHALL REPAIR ANY SUCH DEFECTS
<br />AT NO COST TO THE OWNER. ALL EQUIPMENT INCLUDED IN THE PROJECT SHALL BE COVERED BY
<br />THE MANUFACTURER'S WARRANTY FOR THE DURATION OF THAT WARRANTY. COPIES OF ALL
<br />MANUFACTURER'S WARRANTIES AND CONTRACTOR WARRANTIES SHALL BE PROVIDED TO THE OWNER
<br />AT FINAL ACCEPTANCE.
<br />B. CONTRACTOR SHALL MEET WITH THE OWNER'S REPRESENTATIVE AND REVIEW ALL OPERATIONS
<br />AND MAINTENANCE OF ALL SYSTEMS. CONTRACTOR SHALL PROVIDE THE OWNER WITH BOUND COPIES
<br />OF ALL OPERATION AND MAINTENANCE MANUALS INCLUDING PARTS LISTS, MAINTENANCE SCHEDULES,
<br />ETC.
<br />C. THE CONTRACTOR SHALL CONTINUALLY RECORD ANY AND ALL DEVIATIONS TO THE CONTRACT
<br />DOCUMENTS MADE DURING CONSTRUCTION AND PROVIDE A COMPLETE SET OF THESE RECORD
<br />DRAWINGS TO THE OWNER WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION. IF REQUIRED BY
<br />THE AUTHORITY HAVING JURISDICTION, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
<br />SECURE THE SERVICES OF A LICENSED PROFESSIONAL ENGINEER TO PROVIDE SIGNED AND SEALED
<br />RECORD DRAWINGS.
<br />1 B. TESTING
<br />A. AT THE COMPLETION OF THE PROJECT, TEST ALL ELECTRICAL EQUIPMENT AND DEVICES FOR
<br />PROPER OPERATION. TEST FOR GROUNDS AND SHORTS. REPORT ALL RESULTS TO THE ARCHITECT
<br />IN WRITING. REPLACE ANY DEFECTIVE DEVICES OR EQUIPMENT.
<br />B. TEST ALL FIRE ALARMS, GENERATORS, AND OTHER LIFE SAFETY EQUIPMENT IN THE PRESENCE
<br />OF THE ENGINEER AND THE FIRE OFFICIAL TO DEMONSTRATE OPERATION. MAKE ANY MODIFICATIONS
<br />NECESSARY AS REQUIRED BY THE FIRE OFFICIAL AND REPAIR OR REPLACE ANY DEFECTIVE ITEMS
<br />AS NECESSARY.
<br />* TO 1I-E BEST OF TNT= ARCHITECT OR ENGINEER'S IQdOIIlLEDGE AND
<br />BELIEF, THESE PLANS AND SPECIFICATIONS COMPLY WITH THE
<br />FLORIDA SUILDNG CODE, 5TH EDITION 2014.
<br />* THE DRAWINGS t DESIGN ARE VALID FOR 12 MONTHS FROM DATE
<br />OF 5EING SEALED.
<br />ISSUE
<br />DATE BY:
<br />mvIEW
<br />01/15/15
<br />PERMIT
<br />01/15/15
<br />REV.
<br />REV.
<br />REV.
<br />REV.
<br />THEE DOGNByTb, MM WO MAU AW
<br />aPE WATM AW OONCF.P'P8 AM THE 6CLE
<br />PROMI I CP FRAM OBW NC. AM 61 NOT DE
<br />REPRODUCE, R -LM OR COPIED FOR OnOt
<br />PRMEM, N 04ME OR PART Wi W THE WiI EN
<br />COMM CP PRANK PRM AwZwn is AJAR
<br />ALL WAM ARE PROR Ep DY THE ARCHRECT N
<br />AOCOWW" WrtW U& CCPYN04 AW PAW LNtB
<br />LMANOFM 1i6°ROGuc m WLL EE PROEEC m
<br />TO THE FULL WW CP THE Last
<br />SHEET TITLE
<br />ELECTR I CAL PANEL
<br />SG-IEOULE 4
<br />SPECII:ICATIONS.
<br />
|