Laserfiche WebLink
PANEL SCHEDULE <br />AMPS: <br />100 <br />AMP LOCATION: <br />BACK VOLTS: 120 240V <br />PHASE: <br />3 <br />WIRE: GRN. BAR: <br />SQ. D. <br />TYPE:QO <br />NEMA: 1 MTD: <br />S SPACES: 30 <br />FEEDER <br />WIRES: <br />CKT <br />AMP. <br />PHASE <br />DESCRIPTION <br />VA <br />WIRE <br />NOTES <br />PHASE <br />CKT <br />AMP. <br />PHASE <br />DESCRIPTION <br />VA <br />WIRE <br />NOTES <br />NO. <br />SIZE <br />A B C <br />NO. <br />SIZE <br />1 <br />20 <br />NAIL TABLE <br />2 <br />20 <br />NAIL TABLE <br />3 <br />20 <br />NAIL TABLE <br />4 <br />20 <br />NAIL TABLE <br />5 <br />20 <br />NAIL TABLE <br />6 <br />20 <br />NAIL TABLE <br />7 <br />20 <br />TV RECEPTACLE <br />8 <br />20 <br />TV RECEPTACLE <br />9 <br />30 <br />DRYER <br />10 <br />20 <br />PEDICURE CHAIR <br />11 <br />12 <br />20 <br />PEDICURE CHAIR <br />13 <br />20 <br />WASHER <br />14 <br />20 <br />PEDICURE CHAIR <br />15 <br />16 <br />20 <br />PEDICURE CHAIR <br />30 <br />HOT WATER <br />17 <br />18 <br />20 <br />1 OFFICE & BATHROOM RECPETACLE <br />19 <br />20 <br />20 <br />NAIL STATION LIGHTS <br />30 <br />HOT WATER <br />21 <br />22 <br />50 <br />AHU <br />23 <br />20 <br />PEDICURE CHAIR <br />24 <br />25 <br />20 <br />PEDICURE LIGHT <br />26 <br />50 <br />A/C <br />27 <br />20 <br />SIGN <br />28 <br />29 <br />20 <br />SHOW WINDOW <br />30 <br />20 <br />EXHAUST FAN <br />TOTAL CONNECTED VA <br />TOTAL CONNECTED VA <br />NOTES: <br />1. <br />PRIOR TO ANY WORK, FIELD <br />MEASURE ACTUAL LOAD ON THIS PANEL TO <br />CONFIRM THAT THIS PANEL IS CAPABLE OF SUPPORTING NEW LOADS <br />SHOWN. REPORT RESULTS TO ARCHITECTURE IN WRITING PRIOR TO BEGINNING AND <br />CONSTRUCTION ACTIVITIES. <br />2. <br />* INDICATES EXISTING BRANCH <br />CIRCUIT TO REMAIN. <br />3. <br />FIELD VERIFY ALL ITEMS IN THIS PANEL SHOWN EXISTING TO REMAIN & <br />ENSURE CONTINUITY <br />OF SERVICE TO THESE CIRCUITS IF REQUIRED PER <br />THE NEW DESIGN (E.G. EXHAUST FANS). <br />5. <br />DEMAND LOAD CALCULATION: <br />ITEM <br />LOAD <br />LIGHTS <br />3137.5 ® 100% <br />WATER HEATER (2) <br />10,000 VA <br />HEAT (1) <br />10,000 VA <br />NAIL TABLE (6) <br />7200 VA <br />PEDICURE CHAIRS (8) <br />8100 VA <br />GP RECEPTACLES (5) <br />2000 VA <br />EXHAUST FAN (2) <br />1200 VA <br />DRYER (1) <br />5000 VA <br />SIGN (1) <br />1200 VA <br />LARGEST MOTOR <br />2500 VA <br />SHOW WINDOW <br />1200 VA <br />TOTAL <br />18,4000 AMPS <br />FIRST 10,000 0 100% <br />10,000 <br />REMAINDER ® 50% <br />19,200 <br />1009E LIGHT <br />3137.50 <br />TOTAL VA <br />32,337.5 <br />TOTAL <br />89.826 AMPS <br />6013 EXISTING VERIZON LOAD <br />100 AMP TOTAL <br />6013 NEW NAIL SALON 83.993 AMPS <br />TOTAL LOAD OF EXISTING 600AMP = 183.933 AMPS <br />EMT—IN6 <br />Fw-o AMP 120/708Y <br />" NIPPLE W/ (4) 3/0 ALU XHHW <br />ELECTRICAL SPECIFICATIONS: <br />1. GENERAL <br />A. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED FOR A COMPLETE SYSTEM AS OUTLINED IN THE <br />CONTRACT DRAWINGS AND THESE SPECIFICATIONS. <br />B. NOTE THAT DRAWINGS ARE DIAGRAMMATIC ONLY AND INTENDED TO SHOW THE GENERAL ARRANGEMENT OF <br />SYSTEMS. NOT EVERY MINUTE DETAIL <br />C. DO NOT SCALE PLANS. <br />D. PROVIDE ALL NECESSARY FITTINGS, BOXES, TRANSITIONS, CONNECTORS, ETC. WHETHER SHOWN OR NOT ON <br />PLANS. <br />E. ALL WORK IS NEW UNLESS OTHERWISE NOTED. <br />F. THESE PLANS REPRESENT THE DESIGN INTENT BASED ON INFORMATION AVAILABLE AT THE TIME OF DESIGN. ANY <br />SUBSTANTIAL MODIFICATIONS OR ALTERATIONS MADE DURING THE CONSTRUCTION PHASE SHALL BE REPORTED TO <br />THE ENGINEER PRIOR TO WORK. MODIFICATIONS MADE WITHOUT THE ENGINEER'S WRITTEN APPROVAL SHALL REMAIN <br />THE RESPONSIBILITY OF ,THE CONTRACTOR. <br />G. IN CASE OF ANY DISCREPANCIES BETWEEN THE DRAWINGS, SPECIFICATIONS, FIELD CONDITIONS, CODES, ETC. IT <br />IS THE RESPONSIBILITY OF THE CONTRACTOR TO REFER ALL SUCH MATTERS TO THE ENGINEER IN WRITING <br />IMMEDIATELY FOR RESOLUTION PRIOR TO EXECUTING ANY WORK. ANY WORK PERFORMED WITHOUT THE WRITTEN <br />AUTHORIZATION OF THE ENGINEER SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />H. ALL WORK SHALL CONFORM TO THE FOLLOWING CODES (AS APPLICABLE) AS WELL AS ALL LOCAL REGULATIONS, <br />ORDINANCES, AND AMENDMENTS <br />2010 FLORIDA BUILDING CODE <br />2008 NFPA-70 NATIONAL ELECTRICAL CODE <br />2005 NFPA-72 NATIONAL FIRE ALARM CODE <br />2. SCOPE OF WORK <br />PROVIDE NEW ELECTRICAL DEVICES AND CONNECT TO EXISTING SYSTEM. PROVIDE NEW LIGHTING, RECEPTACLES, <br />SWITCHES, ETC. AND CONNECT AS SHOWN ON PLANS. <br />3. ITEMS FURNISHED BY CONTRACTOR <br />IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIALS, EQUIPMENT, AND <br />ACCESSORIES NECESSARY TO MAKE A COMPLETE INSTALLATION. ALL EQUIPMENT SHALL BE STORED IN A SAFE, DRY <br />PLACE IN THE MANUFACTURER'S ORIGINAL PACKAGING UNTIL READY FOR USE. THE OWNER SHALL NOT BE <br />RESPONSIBLE FOR PROVIDING ANY PART OF THE PROJECT, UNLESS SPECIFICALLY NOTED. THE CONTRACTOR SHALL <br />ALSO BE RESPONSIBLE FOR PAYING ALL REQUIRED FEES, OBTAINING ALL PERMITS. AND ARRANGING FOR ALL <br />INSPECTIONS, INCLUDING COORDINATION WITH AND SATISFYING ALL REQUIREMENTS OF THE ELECTRICAL UTILITY <br />COMPANY(IES) AS MAY BE REQUIRED TO EXECUTE THIS SCOPE OF WORK. <br />4. WORK IN EXISTING BUILDINGS <br />A. DO NOT USE POWDER DRIVEN FASTENERS OF ANY TYPE. <br />B. ALL ITEMS REMOVED AND NOT RE —USED SHALL BE TURNED OVER TO THE OWNER. CONTRACTOR SHALL REMOVE <br />ANY UNSATISFACTORY ITEMS FROM THE PROJECT SITE. <br />C. SOME EXISTING ITEMS TO REMAIN WITHOUT WORK ARE SHOWN FOR CLARITY OR REFERENCE ONLY. NOTE THAT <br />ADDITIONAL ITEMS WITHOUT WORK MAY ALSO BE PRESENT. <br />D. DRAWINGS OF EXISTING SYSTEMS ARE BASED ON EXISTING DOCUMENTS AND FIELD CONDITIONS, SOME OF <br />WHICH MAY BE UNVERIFIED. PRIOR TO SUBMITTING A BID, CONTRACTOR SHALL STUDY THE PLANS AND VISIT THE <br />PROJECT SITE IN ORDER TO BECOME FAMILIAR WITH EXISTING CONDITIONS. ANY DISCREPANCIES IN THE CONTRACT <br />DOCUMENTS WHICH COULD SIGNIFICANTLY IMPACT THE PROJECT BUDGET OR SCHEDULE MUST BE REPORTED TO <br />THE ENGINEER IN WRITING IMMEDIATELY. FAILURE TO DO SO WILL NOT BE SUFFICIENT CAUSE FOR DELAYS OR <br />CHANGES LATER IN THE PROJECT. CHANGE ORDERS RESULTING FROM FAILURE TO PROPERLY INVESTIGATE EXISTING <br />FIELD CONDITIONS WILL NOT BE ACCEPTED. ALL WORK IS NEW UNLESS OTHERWISE NOTED. <br />E. MODIFICATIONS TO EXISTING SYSTEMS NECESSARY TO CONNECT TO NEW WORK SHALL BE CONSIDERED TO BE <br />PART OF THE BASIC WORK OF THIS CONTRACT. <br />F. COORDINATE ALL WORK SCHEDULES WITH THE OWNER TO MINIMIZE DISRUPTIONS TO EXISTING SYSTEMS OUTSIDE <br />THIS SCOPE OF WORK. <br />5 COORDINATION <br />ALL WORK ON THIS PROJECT SHALL BE COORDINATED WITH THE OWNER AND ALL OTHER TRADES PRIOR TO <br />BEGINNING AY WORK OR ORDERING ANY MATERIALS. CONTRACTOR SHALL REVIEW PLANS OF ALL DISCIPLINES <br />INVOLVED AND ADVISE THE ARCHITECT IN WRITING OF ANY CONFLICTS, CODE OR SAFETY ISSUES THAT MAY EXIST <br />PRIOR TO ANY FABRICATION OR ORDERING OF EQUIPMENT. RESOLUTION OF SUCH CONFLICTS WHICH ARE NOT <br />REPORTED PRIOR TO CONSTRUCTION SHALL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR AND CHANGE ORDER <br />PROPOSALS FOR SUCH WORK WILL NOT BE ACCEPTED. PROVIDE ROUTING AND OFFSETS NECESSARY TO AVOID <br />CONFLICTS WITH STRUCTURE, FINISHES, AND WORK OF OTHERS. CONTRACTOR SHALL PROVIDE ALL CORE <br />PENETRATIONS AND PATCHING FOR FLOOR PENETRATIONS. <br />S. DEVICE LOCATIONS <br />A. INSTALL ALL DEVICES IN ACCESSIBLE LOCATIONS, EXCEPT AS SPECIFICALLY NOTED OR PROHIBITED BY NEC. <br />B. PROVIDE MIN. 1808 INCH PAINTED ALUMINUM ACCESS DOORS WITH FULL HINGE AND KEY, FOR ACCESS TO <br />ALL ELECTRICAL DEVICES, PULL BOXES, JUNCTION BOXES. AND ACCESSORIES IN PLASTER, DRYWALL. OR <br />INACCESSIBLE CEILINGS. OR IN WALLS. GROUP DEVICES AT A SINGLE LOCATION, AS AVAILABLE. <br />C. ACCESS DOORS IN RATED WALLS OR CEILINGS SHALL HAVE A RATING AT LEAST EQUAL TO THE RATING OF THE <br />WALL OR CEILING. <br />D. ALL DEVICES, RACEWAYS, ETC. WHICH ARE EXPOSED SHALL BE PAINTED TO MATCH THE ADJACENT SURFACE OR <br />AS DIRECTED BY THE ARCHITECT. <br />E. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED A MINIMUM OF 1'-0" ABOVE THE BASE FLOOD ELEVATION. <br />7. EQUIPMENT GENERAL <br />ALL EQUIPMENT OF EACH TYPE SHALL BE BY ONE MANUFACTURER AND SHALL HAVE CHARACTERISTICS AS LISTED <br />IN THE EQUIPMENT SCHEDULES. ALL EQUIPMENT SHALL BE UL LISTED, NO EXCEPTIONS I SUBSTITUTIONS ARE <br />ACCEPTABLE PROVIDED THAT THE SUBSTITUTED EQUIPMENT HAS EQUIVALENT CHARACTERISTICS AS THAT SCHEDULED <br />AND IS PROVIDED BY AN ACCEPTABLE MANUFACTURER AS LISTED FOR THAT EQUIPMENT TYPE. CONTRACTOR SHALL <br />SUBMIT PRODUCT DATA FOR ALL EQUIPMENT TO THE ENGINEER FOR APPROVAL PRIOR TO ORDERING. SUBMITTALS <br />SHALL INCLUDE DIMENSIONS, WEIGHT, VOLTAGE, AMPERAGE, HORSEPOWER, POWER FACTOR, INTERRUPTING CAPACITY, <br />ETC. <br />8. CONDUCTORS <br />A. PROVIDE ONLY DUAL RATED THWN-2/THHN-2 COPPER CONDUCTORS. MINIMUM SIZE IS NUMBER 12 AWG. <br />B. CONDUCTORS SHALL HAVE COLORED INSULATION FOR IDENTIFICATION PURPOSES AS FOLLOWS: <br />2401208/120V <br />PHASE A BLACK <br />PHASE B RED <br />PHASE C BLUE <br />NEUTRAL WHITE <br />GROUND GREEN <br />C. GROUNDED CONDUCTORS WHICH CARRY OVER 250V TO GROUND SHALL BE TAGGED WITH VOLTAGE AT EACH <br />TERMINATION POINT. <br />D. DO NOT INSTALL MORE THAN THREE CURRENT CARRYING CONDUCTORS IN SINGLE RACEWAY (NOT INCLUDING <br />NEUTRAL) WHICH WILL REQUIRE NEC TABLE 310-16 NOTE 8 DERAIING. <br />E. PHASE AND GROUNDING CONDUCTOR SIZES SHALL BE INCREASED AS NECESSARY TO ACCOUNT FOR VOLTAGE <br />DROP. <br />9. RACEWAYS <br />A. INSTALL ALL WIRING ABOVE GROUND IN METALLIC CONDUIT (EMT INDOORS, RGS OUTDOORS OR IN EXPOSED <br />LOCATIONS). <br />B. ALL EXPOSED RACEWAYS SHALL BE RUN PARALLEL TO WALLS OR CEILINGS AND SHALL BE PAINTED TO MATCH <br />ADJACENT SURFACES OR AS DIRECTED BY THE OWNER. <br />C. WHERE MULTIPLE RACEWAYS ARE RUN EXPOSED, RUN ALL RACEWAYS SQUARE AND PARALLEL IN A NEAT AND <br />ORDERLY MANNER. <br />D. MAKE FINAL CONNECTIONS (NOT MORE THAN 6'-0- LONG) TO ALL EQUIPMENT WITH FLEXIBLE METALLIC <br />CONDUIT (DRY LOCATIONS) OR LIQUID TIGHT FLEXIBLE METALLIC CONDUIT (DAMP OR WET LOCATIONS). <br />E. INSTALL ALL WIRING BELOW GROUND IN RIGID NON—METALLIC CONDUIT (SCHEDULE 40 PVC). ALL EXTERIOR <br />NONMETALLIC CONDUITS SHALL BE UV RESISTANT. ALL CONDUITS RUN BELOW GROUND SHALL BE INSTALLED <br />ACCORDING TO NEC300-5. <br />F. TYPE MC CABLE MAY BE USED AS AN ALTERNATIVE TO CONDUCTORS IN METAL RACEWAY IN DRY INDOOR <br />LOCATIONS, PROVIDED IT IS INSTALLED PER NEC AND APPROVED BY THE AUTHORITY HAVING JURISDICTION. <br />G. METALLIC CONDUITS SHALL. NOT BE USED AS GROUNDING CONDUCTORS. PROVIDE A SEPARATE GROUNDING <br />CONDUCTOR IN ALL METALLIC CONDUITS, BONDED AT BOTH ENDS PER NEC. <br />EXI5TIN& <br />(2) 3" CONDUIT W/ (4) 350 MCM <br />O O <br />200 AW 200 AW <br />METER METER <br />co 15 <br />Zoo AW EXISTIN& <br />DBC ON ECT 200 AMP <br />w (5)150 AMP DISCOPIrEGT <br />Fl� <br />2" NEW CONDUIT W/ (4) 3/0 <br />ALU XHHW, (1) # 1 ALU XHHW <br />GROUND <br />ELECTRICAL RISER DIAGRAM <br />SCALE: 1/4" = 1'-0" <br />EXI5TINS <br />200 A1rP <br />SWCE W <br />2SM <br />550 MGM <br />10. GROUNDING <br />A. ALL ELECTRICAL SYSTEMS SHALL BE PROPERLY GROUNDED PER NEC 250. <br />B. EXPOSED GROUNDING ELECTRODE CONDUCTORS SHALL BE PROTECTED BY RIGID NONMETALLIC <br />CONDUITS, MIN SIZE - in. <br />C. PROVIDE GROUNDING ELECTRODE CONDUCTORS TO DRIVEN GROUND RODS AT THE BASE OF ALL <br />LIGHT POLES, REMOTE BUILDINGS, OR REMOTE EQUIPMENT. <br />D. ALL METAL ITEMS OF THE ELECTRICAL SYSTEM INCLUDING RACEWAYS, BOXES, FIXTURES, ETC. <br />SHALL BE BONDED AND PROPERLY GROUNDED. <br />11, SWITCHBOARDS AND PANEL BOARDS <br />A. PROVIDE SWITCHBOARDS AND PANEL BOARDS, SIZE AND ARRANGEMENT AS INDICATED ON PLANS <br />AND SCHEDULES. <br />B. MOUNT PANEL BOARDS NOT MORE THAN 480 A.F.F. TO CENTER. <br />C. ENCLOSURES SHALL BE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE INSTALLED (NEMA <br />1 INDOORS, NEMA 3R OUTDOORS, ETC.) <br />D. PROVIDE A TYPEWRITTEN PANEL SCHEDULE IDENTIFYING THE FUNCTION OF ALL CIRCUIT <br />BREAKERS IN A CLEAR PLASTIC SLEEVE PERMANENTLY ATTACHED TO THE PANEL BOARD COVER. <br />E. ALL SWITCHBOARDS AND PANEL BOARDS SHALL HAVE A THERMOPLASTIC IDENTIFYING NAMEPLATE <br />PERMANENTLY AFFIXED TO THE FRONT OR COVER. <br />F. PROVIDE ONE 1' EMPTY CONDUIT FROM PANEL TO 6' ABOVE CEILING FOR EVERY (3) SPARES <br />OR SPACES. <br />G. PANEL BOARDS AND SWITCHBOARDS BY: SQUARE D. CUTLER HAMMER. OR GE. <br />12, CIRCUIT BREAKERS <br />A. ALL CIRCUIT BREAKERS SHALL BE BY A SINGLE MANUFACTURER, WITH SAME STYLE AND <br />WITHSTAND RATING TO MATCH THE PANEL IN WHICH THEY ARE INSTALLED. <br />B. PROVIDE MULTIPLE POLE CIRCUIT BREAKERS FOR MULTIPLE POLE CIRCUITS. HANDLE TIES ARE <br />NOT PERMITTED. <br />C. PROVIDE HACR TYPE CIRCUIT BREAKERS FOR ALL HVAC EQUIPMENT AND WATER HEATERS. <br />D. PROVIDE GROUND FAULT CIRCUIT INTERRUPTER BREAKERS FOR ALL OUTDOOR. BATHROOM, AND <br />KITCHEN BRANCH CIRCUITS WHICH DO NOT UTILIZE GFCI RECEPTACLES, OR AS OTHERWISE <br />REQUIRED BY THE AUTHORITY HAVING JURISDICTION. <br />E. NOT USED. <br />F. NOT USED. <br />G. PROVIDE INVERSE TIME CIRCUIT BREAKERS FOR MOTORS UNLESS SPECIFIED OTHERWISE. <br />H. CIRCUIT BREAKERS SHALL BE PROVIDED WITH INDICATING ON/OFF HANDLES. <br />J. CIRCUIT BREAKERS FOR FIRE ALARMS SHALL BE LOCKABLE. <br />K. CIRCUIT BREAKERS BY: SQUARE D, CUTLER HAMMER. OR GE. <br />13, DEVICES <br />A. PROVIDE GALVANIZED STEEL BOXES FOR ALL DEVICES IN EXPOSED LOCATIONS OR RECESSED <br />INTO RATED WALLS. <br />B. PROVIDE THERMOPLASTIC OR GALVANIZED STEEL BOXES FOR ALL DEVICES TO BE RECESSED INTO <br />NON —RATED WALLS. <br />C. FINISH OF ALL DEVICES AND COVER PLATES SHALL BE AS DIRECTED BY THE OWNER IN WRITING <br />PRIOR TO ORDERING. <br />D. ALL RECEPTACLES SHALL BE OF THE GROUNDING TYPE. <br />E. ALL RECEPTACLES SHALL BE 20 AMP, 120 VOLT RATED, COMMERCIAL GRADE. <br />F. PROVIDE DISCONNECT SWITCHES (WITH OR WITHOUT FUSES AS SPECIFIED) IN ENCLOSURES <br />SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE INSTALLED (NEMA 1 INDOORS, NEMA 3R <br />OUTDOORS & AT WATER HEATER, ETC.) <br />G. ALL SWITCHES AND RECEPTACLES BY LEVITON, GE. OR EQUIVALENT. <br />H. PROVIDE GFCI RECEPTACLES IN ALL KITCHENS. BATHROOMS. GARAGES, OUTSIDE, OR WHEREVER <br />ELSE SHOWN ON DRAWINGS. LABEL ALL DEVICES DOWNSTREAM OF GFCI DEVICE AS 'GFCI <br />PROTECTED'. PROVIDE AT LEAST ONE DUPLEX GFCI PROTECTED RECEPTACLE IN A WEATHERPROOF <br />ENCLOSURE WITHIN TWENTY FIVE (25) FEET OF ALL ROOF OR GRADE MOUNTED EXTERIOR HVAC <br />EQUIPMENT. <br />J. FOR GFCI RECEPTACLES NOT ON A DEDICATED BRANCH CIRCUIT (SUCH AS OUTDOOR <br />RECEPTACLES CONNECTED TO THE NEAREST INTERIOR CIRCUIT). MAKE EVERY ATTEMPT TO LOCATE <br />THE GFCI RECEPTACLE AT THE END OF THE CIRCUIT RUN SO AS TO MINIMIZE THE POSSIBILITY OF <br />CAUSING NUISANCE POWER LOSS TO OTHER DEVICES WHEN THE GFCI DEVICE TRIPS. <br />14. LIGHTING <br />A. ALL LIGHT FIXTURES SHALL BE THOSE DESCRIBED IN THE LIGHTING FIXTURE SCHEDULE OR <br />THEIR EQUIVALENT AS APPROVED BY THE ENGINEER PRIOR TO ORDERING. IF ALTERNATE FIXTURES <br />ARE USED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THEIR <br />INSTALLATION DETAILS WITH ALL OTHER TRADES WITH REGARD TO SPACE REQUIRED, WIRING. POWER <br />CONSUMPTION. ETC. <br />B. LIGHTING BRANCH CIRCUITS SHALL NOT BE LOADED TO MORE THAN 80% OF THE CIRCUIT <br />BREAKER AAPACITY. <br />C. ALL LIGHT FIXTURES INSTALLED IN DAMP, WET, OR HAZARDOUS (CLASSIFIED) LOCATIONS SHALL <br />BE LISTED FOR SUCH USE. <br />D. INCANDESCENT LAMPS SHALL NOT BE USED EXCEPT FOR DIMMING PURPOSES OR AS OTHERWISE <br />STATED ON PLANS OR PERMITTED BY THE AUTHORITY HAVING JURISDICTION. <br />E. ALL FLUORESCENT OR HID LIGHT FIXTURES SHALL BE FUSED WITH ELECTRONIC BALLAST AS <br />REQUIRED TO MEET THE SWITCHING REQUIREMENTS DESCRIBED ELSEWHERE IN THESE DOCUMENTS <br />OR THE AUTHORITY HAVING JURISDICTION. PROVIDE MULTIPLE BALLASTS WHERE REQUIRED TO <br />PROVIDE MULTIPLE LIGHTING LEVELS TO COMPLY WITH APPLICABLE ENERGY CODES. <br />F. INTERIOR LIGHTING IN ALL BUILDINGS LARGER THAN 5.000 SQUARE FEET SHALL BE PROVIDED <br />5W& AUTOMATIC CONTROLS. CONTROLS SHALL CONSIST OF A CENTRAL TIME —OF —DAY SCHEDULING <br />LLER OR OCCUPANCY SENSORS LOCATED IN EACH SPACE. OCCUPANCY SENSORS SHALL BE <br />LOCATED SO THE OCCUPANT CAN SEE THE CONTROLLED LIGHTING AND SHALL BE CAPABLE OF A 4 <br />HOUR OVERRIDE. LIGHTING CONTROL ZONES SHALL NOT EXCEED 2.500 SQUARE FEET. <br />G. PROVIDE TIME CLOCKS OR NORTH FACING PHOTOCELLS TO CONTROL ALL EXTERIOR LIGHTING <br />CIRCUITS AUTOMATICALLY. PROVIDE LIGHTING CONTACTORS AS REQUIRED. <br />H. ALL EXIT SIGNS AND EMERGENCY EGRESS LIGHTING SHALL NOT BE SWITCHED AND SHALL HAVE <br />BATTERY BACKUP OR BE CONNECTED TO THE EMERGENCY POWER SYSTEM. <br />15. WARRANTIES AND MAINTENANCE <br />A. ALL EQUIPMENT SHALL BE STARTED, TESTED, ADJUSTED, LUBRICATED, CLEANED, AND PLACED IN <br />GOOD OPERATING CONDITION BY THE CONTRACTOR. CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT, <br />MATERIALS, AND WORKMANSHIP TO BE FREE OF DEFECTS FOR A PERIOD OF ONE YEAR FROM THE <br />DATE OF ACCEPTANCE BY THE OWNER AND THE CONTRACTOR SHALL REPAIR ANY SUCH DEFECTS <br />AT NO COST TO THE OWNER. ALL EQUIPMENT INCLUDED IN THE PROJECT SHALL BE COVERED BY <br />THE MANUFACTURER'S WARRANTY FOR THE DURATION OF THAT WARRANTY. COPIES OF ALL <br />MANUFACTURER'S WARRANTIES AND CONTRACTOR WARRANTIES SHALL BE PROVIDED TO THE OWNER <br />AT FINAL ACCEPTANCE. <br />B. CONTRACTOR SHALL MEET WITH THE OWNER'S REPRESENTATIVE AND REVIEW ALL OPERATIONS <br />AND MAINTENANCE OF ALL SYSTEMS. CONTRACTOR SHALL PROVIDE THE OWNER WITH BOUND COPIES <br />OF ALL OPERATION AND MAINTENANCE MANUALS INCLUDING PARTS LISTS, MAINTENANCE SCHEDULES, <br />ETC. <br />C. THE CONTRACTOR SHALL CONTINUALLY RECORD ANY AND ALL DEVIATIONS TO THE CONTRACT <br />DOCUMENTS MADE DURING CONSTRUCTION AND PROVIDE A COMPLETE SET OF THESE RECORD <br />DRAWINGS TO THE OWNER WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION. IF REQUIRED BY <br />THE AUTHORITY HAVING JURISDICTION, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO <br />SECURE THE SERVICES OF A LICENSED PROFESSIONAL ENGINEER TO PROVIDE SIGNED AND SEALED <br />RECORD DRAWINGS. <br />1 B. TESTING <br />A. AT THE COMPLETION OF THE PROJECT, TEST ALL ELECTRICAL EQUIPMENT AND DEVICES FOR <br />PROPER OPERATION. TEST FOR GROUNDS AND SHORTS. REPORT ALL RESULTS TO THE ARCHITECT <br />IN WRITING. REPLACE ANY DEFECTIVE DEVICES OR EQUIPMENT. <br />B. TEST ALL FIRE ALARMS, GENERATORS, AND OTHER LIFE SAFETY EQUIPMENT IN THE PRESENCE <br />OF THE ENGINEER AND THE FIRE OFFICIAL TO DEMONSTRATE OPERATION. MAKE ANY MODIFICATIONS <br />NECESSARY AS REQUIRED BY THE FIRE OFFICIAL AND REPAIR OR REPLACE ANY DEFECTIVE ITEMS <br />AS NECESSARY. <br />* TO 1I-E BEST OF TNT= ARCHITECT OR ENGINEER'S IQdOIIlLEDGE AND <br />BELIEF, THESE PLANS AND SPECIFICATIONS COMPLY WITH THE <br />FLORIDA SUILDNG CODE, 5TH EDITION 2014. <br />* THE DRAWINGS t DESIGN ARE VALID FOR 12 MONTHS FROM DATE <br />OF 5EING SEALED. <br />ISSUE <br />DATE BY: <br />mvIEW <br />01/15/15 <br />PERMIT <br />01/15/15 <br />REV. <br />REV. <br />REV. <br />REV. <br />THEE DOGNByTb, MM WO MAU AW <br />aPE WATM AW OONCF.P'P8 AM THE 6CLE <br />PROMI I CP FRAM OBW NC. AM 61 NOT DE <br />REPRODUCE, R -LM OR COPIED FOR OnOt <br />PRMEM, N 04ME OR PART Wi W THE WiI EN <br />COMM CP PRANK PRM AwZwn is AJAR <br />ALL WAM ARE PROR Ep DY THE ARCHRECT N <br />AOCOWW" WrtW U& CCPYN04 AW PAW LNtB <br />LMANOFM 1i6°ROGuc m WLL EE PROEEC m <br />TO THE FULL WW CP THE Last <br />SHEET TITLE <br />ELECTR I CAL PANEL <br />SG-IEOULE 4 <br />SPECII:ICATIONS. <br />