SECTION 1816
<br />TERMITE PROTECTION
<br />1815.1 Termite protection, Termite protection shall be provided by registered termiticides, including soil—opplied pesticides, baiting
<br />systems and pesticides applied to wood, or other approved methods of termite protection lobe Ied for use as a preventative treatment to new
<br />construction. See Section 202, Registered Termiticide. Upon completion of the application of the termite protective treatment, a
<br />certificate of compliance shall be issued to the building department by the licensed pest control company that contains the following
<br />stotement: "The building has received a complete treatment for the prevention of sub ter roneon termites. Treatment is in accordance with
<br />rules and laws established by the Florida Department of Agriculture and Consumer Services."
<br />1816.1.1 If soil treatment is used for subterranean termite prevention, the initial chemical soil treatment inside the foundation
<br />perimeter shall be done after all excavation, backfilling and compaction is complete.
<br />1815.1.2 If soil treatment is used for subterranean termite prevention, soil area disturbed after initial chemical soil treatment shall be
<br />retreated with a chemical soil treatment, including spaces boxed or formed.
<br />1816.1.3 If soil treatment is used for subterranean termite prevention, space in concrete floors boxed out or formed for the subsequent
<br />installation of plumbing traps, drains or any other purpose shall be created by using plastic or metal permanently placed forms of
<br />sufficient depth to eliminate any planned soil disturbance after initial chemical soil treatment.
<br />1816.1.4 If soil treatment is used for subterranean termite prevention, chemically treated soil shall be protected with a minimum 6
<br />millimeter vapor retarder to protect against rainfall dilution. If rainfall occurs before vapor retarder placement, retreatment is
<br />required. Any work, including placement of reinforcing steel, done after chemical treatment until the concrete floor is poured, shall be
<br />done in such manner as to avoid penetrating or disturbing treated soil.
<br />1815.1.5 If soil treatment is used for subterranean termite prevention, concrete overpour or mortar accumulated along the exterior
<br />foundation perimeter shall be removed prior to exterior chemical soil treatment to enhance vertical penetration of the chemicals.
<br />1816.1.6 If soil treatment is used for subterranean termite prevention, chemical soil treatments shall also be applied under all exterior
<br />concrete or grade within I foot (305 mm) of the primary structure sidewolls. Also, a vertical chemical barrier shall be applied promptly
<br />after construction is completed, including initial landscaping and irrigation/sprinkler installation. Any soil disturbed after the
<br />chemical vertical barrier is applied shall be promptly retreated.
<br />1816.1.7 If a registered termiticide formulated and registered as a bait system is used for subterranean termite prevention, Sections
<br />1816,1,1 through 1816.1.6 do not apply; however, a signed contract assuring the installation, maintenance and monitoring of the baiting
<br />system for a minimum of 5 years from the issue of the certificate of occupancy shall be provided to the building official prior to the
<br />pouring of the slab, and the system must be installed prior to final building approval. If the baiting system directions for use require a
<br />monitoring phase prior to installation of the pesticide active ingredient, the installation of the monitoring phase components shall be
<br />deemed to constitute installation of the system.
<br />1816,1.8 If a registered termiticide formulated and registered as a wood treatment is used for subterranean termite prevention, Sections
<br />1816,1.1 through 1816.1.6 do not apply. Application of the wood —treatment termiticide shall be as required by label directions for use,
<br />and must be completed prior to final building approval. Changes in framing or additions to framing in areas of the structure requiring
<br />treatment that occur after the initial wood treatment must be treated prior to final building approval.
<br />1816.2 Penetration.
<br />1816.2.1 Protective sleeves around metallic piping penetrating concrete slab —on —grade floors shall not be of cellulose —containing
<br />materials.
<br />1816.2.2 If soil treatment is used for subterranean termite protection, the protective sleeve shall meet the following minimum
<br />requirements:
<br />1. The sleeve shall have a nominal thickness of 0.025 inch.
<br />2. The sleeve shall be sized for the pipe.
<br />3. The sleeve shall be sealed within the slab using a noncorrosive mechanical clamping device to eliminate the annular space between the
<br />pipe and pipe sleeve.
<br />8"x 8"x 16" C.M.U.
<br />3/16" x 1-3/4" TAPCON FASTENERS
<br />INTO CONCRETE BLOCK
<br />ADI-IESIvE SEALENT BOTH SURFACES
<br />PRIOR TO ATTACHING BUCK TO GONG, BLK.
<br />1/2" DRYWALL
<br />I" P.T.
<br />S"x I" SELF THREADING PHILLIPS FLAT HEAP
<br />CADMINUM PLATE SCREWS 24" O.G. MAX.
<br />WITHIN 4" OF CORNER
<br />3/1(o"x 1-3/4" TAPGON FASTENERS
<br />INTO CONCRETE BLOCKS
<br />CAULKING
<br />MARBLE STOOL
<br />1/2" DRYWALL ON Ix 3 P.T.
<br />FURRING -0 IV' O.C.
<br />PRECAST SILL
<br />S"x 8"x 1(0 " C.M.U.
<br />UJINDOUJS
<br />DOOR 4 WINDOW ATTACHMENT DETAILS
<br />EXISTING ROOF TRUSSES
<br />/
<br />/
<br />/
<br />R-30 INSUL.0"IINJ
<br />1/2" EXT. GYPSUM BRD.
<br />/ I
<br />TOP COURSE S"X 8"
<br />X I6" GONG. "U" BLOCK
<br />\ \ \ I I FILLED W/GONG.
<br />RE-INF. W/1 #5 REBAR
<br />o f GONT.
<br />TEXTURED STUCCO OVER CMU'S
<br />TOP COURSE
<br />8"X0"X1(" GONG.
<br />K.O. BLOCK W/
<br />POURED GONG. 4
<br />• •
<br />1-05 REBAR CONT.
<br />PRECAST GONG. LINTEL
<br />or POWERS STEEL LINTEL
<br />W/ 05 POURED SOLID
<br />aM. WINDOW
<br />RBLE SILL
<br />=CAST GONG. SILL
<br />05 DWL.
<br />tu/ 10"
<br />IL
<br />Z
<br />STD. HOOK
<br />J
<br />�
<br />_Z
<br />N
<br />(2)05 REBAR GONT.
<br />(3" MIN. COVER)
<br />PANEL EDGE SUPPORT FOR NARROW WIDTH ROOF SHEATHING" PER
<br />TECHNICAL NOTE OR275A 16-24 "-DOUBLE PLY CLIP THE SIDE
<br />ADJACENT TO THE FULL WIDTH PANEL - NONE REQUIRED AT RIDGE
<br />OR HIP. 12" TO IC " - LUMBER ONLY BLOCKING (2x4) FLAT WI5E OR
<br />ENDWISE ON THE 51DE ADJACENT TO THE FULL WIDTH PANEL NONE
<br />REQUIRED AT RIDGE OR HIP. FOR PLYWOOD SHEATHING 12" OR LESS
<br />- LUMBER ONLY BLOCKING, (2x4) FLAT WISE OR EDGEWISE ON BOTH
<br />PANEL EDGES.
<br />SHINGLES PER SPECIFICATIONS (tu/ to
<br />FASTENERS PER SHINGLE) OVER #30
<br />ROOFINGS FELT ON 5/8'' PLYWOOD OR
<br />OSB W/H-CLIPS ON PRE-ENGINEERED
<br />WOOD TRU55E5 G 24"O.C. (FOR NAILING
<br />SCHEDULE SEE SHEET 52C)
<br />AT EACH CORNER 4 -
<br />SPACING SHOWN ON
<br />FOUNDATION PLAN, �Q
<br />POUR 4 FILL BLK. CELL
<br />VERTICALLY W/1 05
<br />REBAR CONT. TIED TO
<br />TOP COURSE REBAR 4
<br />TO STEEL IN FTG.
<br />1/2" GYPSUM DRYWALL
<br />OVER 2" P.T. FURRING 1@
<br />1(o" O.C. W/3/4" EXP.
<br />POLYSTYRENE INSUL.
<br />BETWEEN FURRING OR
<br />rFOIL INSULATION
<br />8 X S X 16 CONCRETE
<br />BLOCKS W/ HORIZONTAL
<br />LADDER RE-INF. a 16"
<br />O.C. IN SHEAR PANELS
<br />,,;,,, F.F. E LEV.
<br />-------------
<br />3000 PSI CONC.
<br />(o"x (o"x 10/10 E.W.W. MESH RE NFORCING REQUIRED
<br />' THROUGHOUT THE CONCRET SLAB OR FIBER MESH
<br />PER SECTION 1911.2, 2004 FLORIDA BUILDING CODE.
<br />(o MIL. VAP. BARRIER
<br />,-, I I I TYPICAL WA
<br />CT SON
<br />SEE ELEVATIONS
<br />FOR ROOF SLOPE
<br />0
<br />W
<br />R
<br />0
<br />HURRICANE ANCHORS R- I9 IN5UL.(1`1IN.) ° v
<br />(SEE ROOF PLAN) a
<br />0 M
<br />GLCS.I-4GT. 0 0
<br />lap
<br />H
<br />5/6" DRYWALL CLG. W
<br />y
<br />TOP COURSE S"X 8"
<br />Isv-
<br />4" STUCCO ON ( X Igo" GONG. "U" BLOCK Y
<br />CSALV. LATH ON FILLED W/GONG.
<br />ALUM. DRIP EDGE m
<br />#15 FELT IRE-INF. W/1 #5 REBAR
<br />GONT. d
<br />SCREEN z a M
<br />N O
<br />2" PL WOOD VENT AT EACH CORNER 4 a I
<br />&PACING SHOWN ON °z ..
<br />FOUNDATION PLAN,
<br />POUR 4 FILL BLK. CELL
<br />VERTICALLY W/1 05
<br />REBAR CONT. TIED TO r
<br />TOP COURSE RE BAR 4
<br />1'-01' 4" TO STEEL 1N FTG. � ��pMAS 41
<br />o •' � -4e
<br />.31 oil
<br />z
<br />� U �
<br />d .-
<br />t 4L- E 't
<br />TEXTURED STUCCO OVER CMU'S
<br />(
<br />� N
<br />M
<br />aLL
<br />N
<br />1/2" GYPSUM DRYWALL
<br />E
<br />OVER 2" P.T. FURRING
<br />t
<br />le," O.C. W/3/4" EXP.
<br />t N
<br />POLYSTYRENE INSUL.
<br />ii N
<br />BETWEEN FURRING OR
<br />3 0
<br />rFOIL INSULATION
<br />=
<br />Y
<br />d �
<br />aXaXI6CONCRETE
<br />vL
<br />m
<br />#5 DWL.
<br />I BLOCKS W/ HORIZONTAL
<br />w/ 10"
<br />Z
<br />LADDER RE-INF. 6 I(o"
<br />U
<br />;Q N
<br />STD. NOOK
<br />O.C. IN SHEAR PANELS
<br />W
<br />m
<br />U
<br />a-A
<br />�Wj
<br />U
<br />W W
<br />N
<br />I
<br />Q
<br />U Im
<br />3 F.F. ELEv.
<br />o'
<br />W =
<br />W
<br />3000 PSI CONC.
<br />z ~
<br />Z
<br />W
<br />(o"x 6"x 10/10 E.W.W. MESH RE NFORCING REQUIRED
<br />THROUGHOUT THE CONCRETE SLAB OR FIBER MESH
<br />W
<br />=
<br />PER SECTION 19112, 2004 FLORIDA BUILDING CODE.
<br />V
<br />W
<br />(2)05 REBAR CONT.__/_
<br />U
<br />(3" MIN. COVER)
<br />r
<br />(o MIL. VAP. BARRIER
<br />as
<br />z
<br />�
<br />�
<br />w
<br />A
<br />T`rP I CAL LUALL SECT I ON
<br />0
<br />A
<br />r
<br />(U
<br />I
<br />z
<br />o
<br />W
<br />Z
<br />�
<br />(U
<br />S"x8" CMU BOND BEAM Li/1-05 REBAR
<br />�
<br />W
<br />0
<br />cu
<br />CONTINUOUS, FILLED SOLID WITH
<br />A
<br />GROUT
<br />Z
<br />Ce
<br />W
<br />Ca
<br />L�
<br />A. a 41
<br />W
<br />•
<br />Pq
<br />Cu
<br />a . as A
<br />• .- • - a ed
<br />LD
<br />O
<br />w (')
<br />-
<br />. 4.. v
<br />N
<br />fU
<br />130' STANDARD
<br />.a a d:- a
<br />z
<br />z
<br />HOOK 10'' MINIMUI" I
<br />Lj
<br />W
<br />Z
<br />3
<br />(TYPICAL)
<br />as
<br />�
<br />W
<br />a
<br />V
<br />w
<br />N
<br />#5 REBAR IN
<br />VERTICAL
<br />GROUT FILLED
<br />CELL
<br />STET= DOWN TIE BEA„I DETA L
<br />W
<br />L.t_
<br />W
<br />W
<br />;N
<br />_J
<br />W
<br />M
<br />Q
<br />Z
<br />Q
<br />r�m
<br />W "'
<br />ORJ
<br />w
<br />w
<br />X a- 'a
<br />V)(V
<br />�ZLLJ NZ�
<br />M�a^WN
<br />WO
<br />z
<br />���?
<br />_JW
<br />z
<br />Zm0.
<br />z
<br />oz
<br />U
<br />—W
<br />Z to
<br />U3
<br />U) Q
<br />WZW
<br />O pt toN N
<br />ZcOp� �t
<br />I OA s
<br />Z
<br />'K
<br />JO
<br />o
<br />e055
<br />T
<br />i
<br />N
<br />LL
<br />2 a W N
<br />LID
<br />O J O a HWO_��
<br />
|