Laserfiche WebLink
SECTION 1816 <br />TERMITE PROTECTION <br />1815.1 Termite protection, Termite protection shall be provided by registered termiticides, including soil—opplied pesticides, baiting <br />systems and pesticides applied to wood, or other approved methods of termite protection lobe Ied for use as a preventative treatment to new <br />construction. See Section 202, Registered Termiticide. Upon completion of the application of the termite protective treatment, a <br />certificate of compliance shall be issued to the building department by the licensed pest control company that contains the following <br />stotement: "The building has received a complete treatment for the prevention of sub ter roneon termites. Treatment is in accordance with <br />rules and laws established by the Florida Department of Agriculture and Consumer Services." <br />1816.1.1 If soil treatment is used for subterranean termite prevention, the initial chemical soil treatment inside the foundation <br />perimeter shall be done after all excavation, backfilling and compaction is complete. <br />1815.1.2 If soil treatment is used for subterranean termite prevention, soil area disturbed after initial chemical soil treatment shall be <br />retreated with a chemical soil treatment, including spaces boxed or formed. <br />1816.1.3 If soil treatment is used for subterranean termite prevention, space in concrete floors boxed out or formed for the subsequent <br />installation of plumbing traps, drains or any other purpose shall be created by using plastic or metal permanently placed forms of <br />sufficient depth to eliminate any planned soil disturbance after initial chemical soil treatment. <br />1816.1.4 If soil treatment is used for subterranean termite prevention, chemically treated soil shall be protected with a minimum 6 <br />millimeter vapor retarder to protect against rainfall dilution. If rainfall occurs before vapor retarder placement, retreatment is <br />required. Any work, including placement of reinforcing steel, done after chemical treatment until the concrete floor is poured, shall be <br />done in such manner as to avoid penetrating or disturbing treated soil. <br />1815.1.5 If soil treatment is used for subterranean termite prevention, concrete overpour or mortar accumulated along the exterior <br />foundation perimeter shall be removed prior to exterior chemical soil treatment to enhance vertical penetration of the chemicals. <br />1816.1.6 If soil treatment is used for subterranean termite prevention, chemical soil treatments shall also be applied under all exterior <br />concrete or grade within I foot (305 mm) of the primary structure sidewolls. Also, a vertical chemical barrier shall be applied promptly <br />after construction is completed, including initial landscaping and irrigation/sprinkler installation. Any soil disturbed after the <br />chemical vertical barrier is applied shall be promptly retreated. <br />1816.1.7 If a registered termiticide formulated and registered as a bait system is used for subterranean termite prevention, Sections <br />1816,1,1 through 1816.1.6 do not apply; however, a signed contract assuring the installation, maintenance and monitoring of the baiting <br />system for a minimum of 5 years from the issue of the certificate of occupancy shall be provided to the building official prior to the <br />pouring of the slab, and the system must be installed prior to final building approval. If the baiting system directions for use require a <br />monitoring phase prior to installation of the pesticide active ingredient, the installation of the monitoring phase components shall be <br />deemed to constitute installation of the system. <br />1816,1.8 If a registered termiticide formulated and registered as a wood treatment is used for subterranean termite prevention, Sections <br />1816,1.1 through 1816.1.6 do not apply. Application of the wood —treatment termiticide shall be as required by label directions for use, <br />and must be completed prior to final building approval. Changes in framing or additions to framing in areas of the structure requiring <br />treatment that occur after the initial wood treatment must be treated prior to final building approval. <br />1816.2 Penetration. <br />1816.2.1 Protective sleeves around metallic piping penetrating concrete slab —on —grade floors shall not be of cellulose —containing <br />materials. <br />1816.2.2 If soil treatment is used for subterranean termite protection, the protective sleeve shall meet the following minimum <br />requirements: <br />1. The sleeve shall have a nominal thickness of 0.025 inch. <br />2. The sleeve shall be sized for the pipe. <br />3. The sleeve shall be sealed within the slab using a noncorrosive mechanical clamping device to eliminate the annular space between the <br />pipe and pipe sleeve. <br />8"x 8"x 16" C.M.U. <br />3/16" x 1-3/4" TAPCON FASTENERS <br />INTO CONCRETE BLOCK <br />ADI-IESIvE SEALENT BOTH SURFACES <br />PRIOR TO ATTACHING BUCK TO GONG, BLK. <br />1/2" DRYWALL <br />I" P.T. <br />S"x I" SELF THREADING PHILLIPS FLAT HEAP <br />CADMINUM PLATE SCREWS 24" O.G. MAX. <br />WITHIN 4" OF CORNER <br />3/1(o"x 1-3/4" TAPGON FASTENERS <br />INTO CONCRETE BLOCKS <br />CAULKING <br />MARBLE STOOL <br />1/2" DRYWALL ON Ix 3 P.T. <br />FURRING -0 IV' O.C. <br />PRECAST SILL <br />S"x 8"x 1(0 " C.M.U. <br />UJINDOUJS <br />DOOR 4 WINDOW ATTACHMENT DETAILS <br />EXISTING ROOF TRUSSES <br />/ <br />/ <br />/ <br />R-30 INSUL.0"IINJ <br />1/2" EXT. GYPSUM BRD. <br />/ I <br />TOP COURSE S"X 8" <br />X I6" GONG. "U" BLOCK <br />\ \ \ I I FILLED W/GONG. <br />RE-INF. W/1 #5 REBAR <br />o f GONT. <br />TEXTURED STUCCO OVER CMU'S <br />TOP COURSE <br />8"X0"X1(" GONG. <br />K.O. BLOCK W/ <br />POURED GONG. 4 <br />• • <br />1-05 REBAR CONT. <br />PRECAST GONG. LINTEL <br />or POWERS STEEL LINTEL <br />W/ 05 POURED SOLID <br />aM. WINDOW <br />RBLE SILL <br />=CAST GONG. SILL <br />05 DWL. <br />tu/ 10" <br />IL <br />Z <br />STD. HOOK <br />J <br />� <br />_Z <br />N <br />(2)05 REBAR GONT. <br />(3" MIN. COVER) <br />PANEL EDGE SUPPORT FOR NARROW WIDTH ROOF SHEATHING" PER <br />TECHNICAL NOTE OR275A 16-24 "-DOUBLE PLY CLIP THE SIDE <br />ADJACENT TO THE FULL WIDTH PANEL - NONE REQUIRED AT RIDGE <br />OR HIP. 12" TO IC " - LUMBER ONLY BLOCKING (2x4) FLAT WI5E OR <br />ENDWISE ON THE 51DE ADJACENT TO THE FULL WIDTH PANEL NONE <br />REQUIRED AT RIDGE OR HIP. FOR PLYWOOD SHEATHING 12" OR LESS <br />- LUMBER ONLY BLOCKING, (2x4) FLAT WISE OR EDGEWISE ON BOTH <br />PANEL EDGES. <br />SHINGLES PER SPECIFICATIONS (tu/ to <br />FASTENERS PER SHINGLE) OVER #30 <br />ROOFINGS FELT ON 5/8'' PLYWOOD OR <br />OSB W/H-CLIPS ON PRE-ENGINEERED <br />WOOD TRU55E5 G 24"O.C. (FOR NAILING <br />SCHEDULE SEE SHEET 52C) <br />AT EACH CORNER 4 - <br />SPACING SHOWN ON <br />FOUNDATION PLAN, �Q <br />POUR 4 FILL BLK. CELL <br />VERTICALLY W/1 05 <br />REBAR CONT. TIED TO <br />TOP COURSE REBAR 4 <br />TO STEEL IN FTG. <br />1/2" GYPSUM DRYWALL <br />OVER 2" P.T. FURRING 1@ <br />1(o" O.C. W/3/4" EXP. <br />POLYSTYRENE INSUL. <br />BETWEEN FURRING OR <br />rFOIL INSULATION <br />8 X S X 16 CONCRETE <br />BLOCKS W/ HORIZONTAL <br />LADDER RE-INF. a 16" <br />O.C. IN SHEAR PANELS <br />,,;,,, F.F. E LEV. <br />------------- <br />3000 PSI CONC. <br />(o"x (o"x 10/10 E.W.W. MESH RE NFORCING REQUIRED <br />' THROUGHOUT THE CONCRET SLAB OR FIBER MESH <br />PER SECTION 1911.2, 2004 FLORIDA BUILDING CODE. <br />(o MIL. VAP. BARRIER <br />,-, I I I TYPICAL WA <br />CT SON <br />SEE ELEVATIONS <br />FOR ROOF SLOPE <br />0 <br />W <br />R <br />0 <br />HURRICANE ANCHORS R- I9 IN5UL.(1`1IN.) ° v <br />(SEE ROOF PLAN) a <br />0 M <br />GLCS.I-4GT. 0 0 <br />lap <br />H <br />5/6" DRYWALL CLG. W <br />y <br />TOP COURSE S"X 8" <br />Isv- <br />4" STUCCO ON ( X Igo" GONG. "U" BLOCK Y <br />CSALV. LATH ON FILLED W/GONG. <br />ALUM. DRIP EDGE m <br />#15 FELT IRE-INF. W/1 #5 REBAR <br />GONT. d <br />SCREEN z a M <br />N O <br />2" PL WOOD VENT AT EACH CORNER 4 a I <br />&PACING SHOWN ON °z .. <br />FOUNDATION PLAN, <br />POUR 4 FILL BLK. CELL <br />VERTICALLY W/1 05 <br />REBAR CONT. TIED TO r <br />TOP COURSE RE BAR 4 <br />1'-01' 4" TO STEEL 1N FTG. � ��pMAS 41 <br />o •' � -4e <br />.31 oil <br />z <br />� U � <br />d .- <br />t 4L- E 't <br />TEXTURED STUCCO OVER CMU'S <br />( <br />� N <br />M <br />aLL <br />N <br />1/2" GYPSUM DRYWALL <br />E <br />OVER 2" P.T. FURRING <br />t <br />le," O.C. W/3/4" EXP. <br />t N <br />POLYSTYRENE INSUL. <br />ii N <br />BETWEEN FURRING OR <br />3 0 <br />rFOIL INSULATION <br />= <br />Y <br />d � <br />aXaXI6CONCRETE <br />vL <br />m <br />#5 DWL. <br />I BLOCKS W/ HORIZONTAL <br />w/ 10" <br />Z <br />LADDER RE-INF. 6 I(o" <br />U <br />;Q N <br />STD. NOOK <br />O.C. IN SHEAR PANELS <br />W <br />m <br />U <br />a-A <br />�Wj <br />U <br />W W <br />N <br />I <br />Q <br />U Im <br />3 F.F. ELEv. <br />o' <br />W = <br />W <br />3000 PSI CONC. <br />z ~ <br />Z <br />W <br />(o"x 6"x 10/10 E.W.W. MESH RE NFORCING REQUIRED <br />THROUGHOUT THE CONCRETE SLAB OR FIBER MESH <br />W <br />= <br />PER SECTION 19112, 2004 FLORIDA BUILDING CODE. <br />V <br />W <br />(2)05 REBAR CONT.__/_ <br />U <br />(3" MIN. COVER) <br />r <br />(o MIL. VAP. BARRIER <br />as <br />z <br />� <br />� <br />w <br />A <br />T`rP I CAL LUALL SECT I ON <br />0 <br />A <br />r <br />(U <br />I <br />z <br />o <br />W <br />Z <br />� <br />(U <br />S"x8" CMU BOND BEAM Li/1-05 REBAR <br />� <br />W <br />0 <br />cu <br />CONTINUOUS, FILLED SOLID WITH <br />A <br />GROUT <br />Z <br />Ce <br />W <br />Ca <br />L� <br />A. a 41 <br />W <br />• <br />Pq <br />Cu <br />a . as A <br />• .- • - a ed <br />LD <br />O <br />w (') <br />- <br />. 4.. v <br />N <br />fU <br />130' STANDARD <br />.a a d:- a <br />z <br />z <br />HOOK 10'' MINIMUI" I <br />Lj <br />W <br />Z <br />3 <br />(TYPICAL) <br />as <br />� <br />W <br />a <br />V <br />w <br />N <br />#5 REBAR IN <br />VERTICAL <br />GROUT FILLED <br />CELL <br />STET= DOWN TIE BEA„I DETA L <br />W <br />L.t_ <br />W <br />W <br />;N <br />_J <br />W <br />M <br />Q <br />Z <br />Q <br />r�m <br />W "' <br />ORJ <br />w <br />w <br />X a- 'a <br />V)(V <br />�ZLLJ NZ� <br />M�a^WN <br />WO <br />z <br />���? <br />_JW <br />z <br />Zm0. <br />z <br />oz <br />U <br />—W <br />Z to <br />U3 <br />U) Q <br />WZW <br />O pt toN N <br />ZcOp� �t <br />I OA s <br />Z <br />'K <br />JO <br />o <br />e055 <br />T <br />i <br />N <br />LL <br />2 a W N <br />LID <br />O J O a HWO_�� <br />