My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6429 Gall Blvd (4)
Zephyrhills
>
Building Department
>
Building Plans
>
6429 Gall Blvd (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:52:11 PM
Creation date
1/21/2025 3:39:15 PM
Metadata
Fields
Template:
Building Plans
Street #
6429
Location
Gall Blvd
Contractor
Prodigy Contracting Group
Building Plans - Permit #
16493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION PLAN <br />SCALE: 1/4" = V-0" <br />DEMOLITION PLAN <br />SCALE: 1/4" = V-0" <br />Q <br />UC1p'n <br />DEMOLITION PLAN NOTES: z w Ow Lo <br />izo00 <br />A. BEFORE COMMENCING WITH DEMOLITION WORK, CONTRACTOR SHALL REFERENCE AS -BUILT a 5 2 coo <br />DOCUMENTATION & FIELD VERIFY CURRENT CONDITIONS FOR LOCATIONS OF DEMOLITION. PROVIDE w Z J J <br />DEMOLITION/ALTERATIONS TO CONSTRUCTION OF BUILDING NOT SPECIFIED TO BE REMOVED, BUT � cop <br />WHICH WOULD OBSTRUCT PROPER EXECUTION OF THE CONTRACT WORK. J z o w <br />B. EACH PHASE OF DEMOLITION SHALL BE PRECEDED BY INVESTIGATION OF THE AREA FOR REMOVAL, < Z U- <br />RELOCATION, DISCONNECTION, OR RE-ROUTING OF EXISTING ELEMENTS. ;`€-<r<w <br />".: <br />C. ALL CONTRACTORS ARE RESPONSIBLE FOR VISITING THE SITE TO DETERMINE THE EXTENT OF jof /�:: w Lu <br />DEMOLITION& PATCHING REQUIRED TO INSTALL THEIR PORTION OF THE WORK. %-p <br />:<- <br />D. CONTRACTORS SHALL VISIT AND INSPECT THE EXISTING BUILDING &SHALL FAMILIARIZE THEMSELVES <br />WITH ACTUAL JOB CONDITIONS BEFORE SIGNING CONTRACTS. NO EXTRAS WILL BE ALLOWED FOR <br />WORK WHICH MAY HAVE BEEN REASONABLY FORESEEN BY AN INSPECTION OF THE PREMISES. <br />E. WHILE THE SCOPE OF EXISTING &NEW WORK HAS BEEN INDICATED ON DRAWINGS AS ACCURATELY AS <br />POSSIBLE, CONTRACTORS SHALL ADAPT THEIR WORK TO MEET ALL ACTUAL CONDITIONS IN THE <br />EXISTING PREMISES. IF THE ADAPTATION WILL AFFECT THE DESIGN INTENT, NOTIFY THE ARCHITECT OF /:;;:,;„<<<;<<;<>"' <br />DISCREPANCIES PRIOR TO PROCEEDING. / <br />F. AFTER INSPECTING THE PREMISES, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT ANY LACK OF <br />NECESSARY CLEARANCE REQUIRED BY THE VARIOUS EQUIPMENT PRIOR TO BEGINNING WORK. <br />G. EXISTING FINISHES, MATERIALS, & EQUIPMENT THAT ARE TO REMAIN ARE TO BE PROTECTED AS <br />NEEDED. ANY AREAS DAMAGED DURING DEMOLITION ARE TO BE PATCHED & REPAIRED TO "LIKE NEW" <br />CONDITION AT NO COST TO THE OWNER. <br />H. NOTIFY ARCHITECT OF ANY DISCREPANCIES IN EXISTING CONDITIONS ENCOUNTERED DURING <br />DEMOLITION PRIOR TO COMMENCING NEW CONSTRUCTIONS. <br />I. CONTRACTOR TO BRACE EXISTING STRUCTURE TO MAINTAIN STRUCTURAL STABILITY AS REQUIRED <br />DURING ALL DEMOLITION AND CONSTRUCTION. <br />J. MAINTAIN ALL EXISTING UTILITY SERVICES IN USE AT ALL TIMES UNLESS WRITTEN PERMISSION IS <br />OBTAINED FROM THE OWNER PRIOR TO THE INTERRUPTION OF ANY SERVICE. IF REQUIRED, EITHER <br />COMPLETE THE WORK DURING OFF HOURS WHEN THE OWNER WILL NOT BE AFFECTED OR <br />COORDINATE THE INTERRUPTION OF SERVICE WITH THE OWNER PRIOR TO THE INTERRUPTION. <br />PERMANENTLY RECONNECT ANY SERVICE INTERRUPTED BY BY DEMOLITION &/OR ALTERATION WORK Coe - <br />WITHIN OR OUTSIDE OF THE SCOPE OF WORK. <br />K. DISCONNECT AT THE SOURCE AND REMOVE EXISTING ELECTRICAL MATERIALS & EQUIPMENT, AND <br />MECHANICAL ITEMS, WHICH ARE RENDERED OBSOLETE BY THESE ALTERATIONS. ITEMS SHALL EITHER <br />BE REMOVED FROM THE SITE, OR RETURNED TO THE OWNER'S STOCK AT THE SOLE DISCRETION OF �� Af*7259 <br />THE OWNER. <br />L. CONTRACTOR TO COORDINATE PHASING & FIXTURE REMOVAL WITH OWNER PRIOR TO START OF WORK. <br />M. REMOVE EXISTING FINISH FLOORING & PREP FOR INSTALLATION OF NEW FLOORING AS LISTED ON '"�1040g04 «r' <br />DEMOLITION PLAN. REFER TO FINISH PLAN FOR EXTENTS OF NEW FLOOR FINISHES. 1 <br />N. REMOVE EXISTING WALL FINISHES INCLUDING WALLCOVERING, WAINSCOTING AND CHAIR RAIL (WHERE p <br />OCCURS) & PREP WALL SURFACES AS REQUIRED FOR NEW WALL FINISHES. REFER TO FINISH PLAN & m w z <br />uj INTERIOR ELEVATIONS FOR EXTENTS OF NEW WALL FINISHES. Q Q o w p <br />mwzu_z <br />Q <br />EMPLOYEE <br />QO H p H Z 2 <br />� <br />PHARMACY <br />pz2LUQ(.Do�Q�2 <br />wZUm0Z�F-Jo� <br />ROOM <br />Q� O �wwm <br />�ZV����U=LLp <br />PHARMACY <br />- <br />CONSTRUCTION PLAN NOTES: <br />w g Q o ° <br />' <br />WANING <br />W W 2 W <br />102 <br />U <br />N wwwa <br />pUpQ�Q <br />A. <br />ALL DIMENSIONS SHOWN ARE TO FINISHED FACE UNLESS NOTED OTHERWISE. <br />_ = a z p z _ w <br />_�cnapcnQQpcncncn <br />B. <br />ALL EXTERIOR DIMENSIONS ARE MASONRY OPENINGS UNLESS NOTED OTHERWISE. <br />7r <br />C. <br />ALL DOORS SHALL BE LOCATED 4" FROM ADJACENT WALLS UNLESS DIMENSIONED OTHERWISE <br />D <br />REFER TO ENLARGED PLANS FOR DIMENSIONS &PARTITION TYPES OF THOSE PARTICULAR AREAS <br />cr, <br />E. <br />CLEAN, PATCH, & REPAIR EXISTING WALLS, FLOORS, & CEILINGS AS REQUIRED FOR NEW <br />~O N <br />FINISHES/NEW WORK. <br />N <br />� O <br />' <br />F. <br />COORDINATE SAWCUT TRENCHING FOR NEW MEP ITEMS WITH MEP SHEETS. CUT & REMOVE <br />N `p <br />CONCRETE IN CONTINUOUS STRAIGHT LINES. DISPOSE OF DEBRIS IN PROPER CONTAINER & <br />REMOVE OFFSITE BACKFILL &COMPACT PER SPECIFICATIONS INFILL OPENINGS IN SLAB WITH <br />N <br />CONCRETE & PROVIDE CONCRETE SEALER: QUICKCRETE ACRYLIC #8500 ON FINISH SLAB OR FACE <br />M M <br />G. <br />PATCH, REPAIR, OR REPLACE DAMAGED GYPSUM WALL BOARD ON EXISTING METAL FRAMING. <br />c� <br />Op <br />- <br />H. <br />REFER TO SHEET D1 (BY OTHERS) TO LOCATE NEW OR RELOCATED EQUIPMENT. <br />o p •� <br />/ <br />I. <br />CONTRACTOR TO COORDINATE PHASING WITH STORE OWNER TO ALLOW STORE TO REMAIN IN <br />M <br />OPERATION DURING CONSTRUCTION. <br />W <br />J. <br />DAMAGED CONSTRUCTION (NEW OR EXISTING) SHALL BE REPAIRED, REPLACED, AND/OR MODIFIED <br />U w <br />-::......... ...... <br />AS DETERMINED BY THE OWNER'S REPRESENTATIVE. <br />K. <br />WHERE THE VERTICAL SPAN OF METAL STUDS EXCEEDS 15'-0", SPACING SHALL BE 16" O.C. IN LIEU <br />OF 24" O.C. <br />L. <br />CONTRACTOR SHALL BE REQUIRED TO CONFIRM THE PRESENCE OF AN UNDERSLAB VAPOR <br />BARRIER (BENEATH EXISTING SLAB ON GRADE). THE CONTRACTOR MY UTILIZE SCOPE REQUIRED <br />FLOOR TRENCHING AS A MEANS OF "VISUALLY" CONFIRMING THE EXISTENCE OF VAPOR BARRIER, <br />OR CONTRACTOR MAY PERFORM A MINIMUM OF THREE (3) RELATIVE HUMIDITY FLOOR PROBES <br />PER ASTM F2170. REPORT RESULTS OF FINDINGS TO ARCHITECT. <br />M. <br />ALL DOORS WITHOUT DOOR TAGS ARE EXISTING TO REMAIN. <br />N. <br />EXISTING TO REMAIN OBJECTS SHOWN GRAYED OUT - TYPICAL. <br />0. <br />SEE A-420 FOR PARTITION TYPES. <br />P. <br />NOT ALL ROOMS ON ROOM SCHEDULE OCCUR. SEE PLANS. <br />Q. <br />ALL FURNITURE AND MILLWORK PROVIDED BY WALGREENS AND INSTALLED BY CONTRACTOR. <br />A-111 KEYNOTES: <br />1. REMOVE PARTITION IN ITS ENTIRETY, PATCH AND REPAIR ADJACENT SURFACES AS REQUIRED. <br />2. REMOVE PORTION OF EXISTING PARTITION AND PREPARE PARTITION FOR INSERTION OF NEW <br />DOOR & FRAME. <br />3. REMOVE EXISTING LIGHTING AS INDICATED WITHIN AREA OF PROPOSED NEW WORK. <br />4. REMOVE EXISTING FINISH FLOORING (WHERE OCCURS) WITHIN AREA OF PROPOSED NEW WORK <br />AND PREPARE FOR NEW FLOOR FINISH. <br />5. REMOVE EXISTING DOOR & FRAME. <br />6. CABINETS AND FURNITURE SHALL BE PROVIDED BY WALGREENS AND INSTALLED BY <br />CONTRACTOR. <br />7. NEW CONSTRUCTION UNDER EXISTING HEADER TO MATCH ADJACENT EXISTING WALL <br />CONSTRUCTION; VERIFY HEIGHT OF HEADER IS SUFFICIENT FOR PLACEMENT OF NEW DOOR <br />(WHERE OCCURS). <br />z <br />0 <br />�F_ <br />a. <br />� U <br />W U <br />a w <br />p (A <br />m z <br />w O <br />LL o U) <br />p <br />w w <br />W <br />0 <br />p m <br />o w <br />N Q <br />p <br />M <br />O <br />0 <br />z <br />U) <br />N <br />''^^ <br />vJ � <br />M <br />a <br />c„ <br />o <br />W J LL <br />W <br />z <br />O <br />4t <br />J <br />J J <br />U <br />w <br />o_ <br />5 <br />O <br />-� N <br />It <br />(oa <br />z <br />w <br />O <br />N <br />U <br />06 <br />O <br />2 <br />w <br />0 <br />W <br />g <br />Q <br />wM <br />Ch <br />Lo <br />O <br />O (n <br />O <br />} <br />m <br />N <br />Q <br />J <br />a <br />z <br />o <br />� o <br />W <br />W <br />U <br />D <br />0 <br />of <br />v <br />o <br />o <br />A-1 11 <br />COPYRIGHT © 2015 GENSLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.