Laserfiche WebLink
.0 <br />WI <br />O <br />D <br />U <br />PROJECT DESCRIPTION <br />Executive Summary <br />The scope of work includes a build out of (2) Operating Rooms, a sub -sterile work room, a fire rated storage room, and a scrub alcove within <br />the existing shell space of the AdventHealth Zephyrhills 2nd floor. <br />Project Type <br />Level 2 Alteration - Existing 1-2 Occupancy <br />Project Size <br />The total area is approximately 1,573 Gross Sq. Ft. <br />AdventHealth - ZEPHYR,HILLS <br />U 9 1wil a Lvel FWTOTO WL <br />M ffffl I <br />7050 GALL BLVD, <br />ZEPHYRHILLS, FL, 33541 <br />CONSTRUCTION DOCUMENTS <br />AHCA CLIENT CODE/FILE-PROJECT SUB. NUMBER: 231100046-122-1 <br />12/11/2019 <br />SHEET INDEX <br />Current Revision <br />SHEET NUMBER SHEET NAME Current Revision Date 301 E. Pine Street, Suite 350 <br />00-GENERAL Orlando, Florida 32801 <br />G00o COVER 407-893-5800 Fax 407-264-6624 <br />G001 PROJECT INFORMATION <br />G002 GENERAL NOTES <br />G003 GENERAL DETAILS AND ACCESSIBILITY <br />www.rsandh.com <br />03-STR500TU RAL GENERAL STRUCTURAL NOTES FL Cert. Nos. AAC001886 * IB26000956 <br />S101 LOW ROOF/ 3RD FLR FRAMING PLAN EB0005620 * LCC000210 * GB238 <br />S201 SECTIONS & DETAILS <br />04-ARCHITECTURAL <br />A100 LIFE SAFETY PLAN 1 1/08/2020 <br />A101 SMOKE COMPARTMENT LIFE SAFETY PLAN 1 l/08/2020 <br />A102 DEMOLITION PLAN 1 1/0&2020 <br />A103 NEW CONSTRUCTION PLAN 1 1/08/2020" <br />A104 REFLECTED CEILING PLAN 1 1/08/2020 ALL WORK SHALL COMPLY WITH PREVAILING ,,k5 ENGINEERING <br />A105 EQUIPMENT PLAN CODES FLORIDA BUILDING CODE, S 0 L U T 1 0 N S. <br />A401 ENLARGED PLANS, ELEVATIONS & DETAILS NATIONAL ELECTRIC CODE, <br />AND THE CITY OF ZEPHYRHILLS <br />A501 PARTITION &MILLWORK DETAILS <br />ORDINANCES 255 S. Orange Avenue <br />A601 DOOR SCHEDULE AND FINISH LEGEND <br />Suite 1600 <br />A602 FINISH PLAN, LEGEND & DETAILS 1 1/08/2020 Orlando, Florida 32801 <br />05-FIRE PROTECTION Phone: 407-841-9050 <br />FP001 GENERAL FIRE PROTECTION INFORMATION Fax: 407-540-0234 <br />FP103 NEW CONSTRUCTION PLAN - FIRE PROTECTION www.Uc-engineers.com <br />06 PLUMBING REVIEW DATE <br />P001 GENERAL PLUMBING INFORMATION CITY OF ZEPHYR ILLS <br />P100 DEMOLITION PLAN - PLUMBING FIRE AND LIFE SAFETY FXAMIN <br />P101 DEMOLITION PLAN - MEDICAL GAS <br />P102 NEW CONSTRUCTION PLAN - GRAVITY <br />P103 NEW CONSTRUCTION PLAN - GRAVITY ALT. <br />P104 NEW CONSTRUCTION PLAN - PRESSURE <br />P105 NEW CONSTRUCTION PLAN - PRESSURE ALT. <br />P106 NEW CONSTRUCTION PLAN - MEDICAL GAS <br />P107 NEW CONSTRUCTION PLAN - MEDICAL GAS ALT. <br />P201 PLUMBING DETAILS ALL WORK SHALL COMPLY WITH <br />NFFA CODES AND STANDARDS <br />P202 PLUMBING DETAILS <br />P301 PLUMBING RISER DIAGRAMS <br />07-MECHANICAL <br />M001 GENERAL INFORMATION - HVAC USMW V ATZ: <br />M102 DEMOLITION PLAN - HVAC Cifl'Y W ii4i M <br />M103 NEW CONSTRUCTION PLAN - HVAC KMSMG OII WCIAL <br />M104 NEW CONSTRUCTION PLAN - HVAC ALTERNATIVE <br />M115 NEW CONSTRUCTION PENTHOUSE PLAN - HVAC ALT. <br />M203 NEW CONSTRUCTION PLAN - PIPING <br />M204 NEW CONSTRUCTION PLAN - PIPING ALTERNATE <br />M301 SCHEDULES-HVAC <br />M302 SCHEDULES - HVAC ALTERNATIVE <br />M401 DETAILS - HVAC <br />M402 DETAILS - HVAC <br />M403 DETAILS - HVAC <br />M501 CONTROLS - HVAC ALTERNATIVE <br />08-ELECTRICAL <br />E001 ELECTRICAL LEGEND <br />E002 ELECTRICAL ONE -LINE DIAGRAM 1 - 1/08/2020 <br />E100 OVERALL PLAN - ELECTRICAL <br />E102 DEMOLITION PLAN - POWER <br />E103 NEW CONSTRUCTION PLAN - POWER 1 1/08/2020 <br />E104 ROOF PLAN - ELECTRICAL - ADD ALTERNATE <br />E203 NEW CONSTRUCTION PLAN - LIGHTING 1 1/08/2020 <br />E301 PANEL SCHEDULES 1 1/0&2020 <br />E302 PANEL SCHEDULES 1 1/08/2020 <br />09-TECHNOLOGY <br />T001 GENERAL INFO, LEGENDS & SHEET INDEX - TECHNOLOGY <br />T102 DEMOLITION PLAN - TECHNOLOGY <br />T103 NEW CONSTRUCTION PLAN - TECHNOLOGY 504mO253mOOO <br />T401 TECHNOLOGY - DETAILS <br />T402 TECHNOLOGY - DETAILS <br />2019 © RS&H, INC. <br />�i i <br />